Storm Water Management at MSU Ruth Kline-Robach Michigan State University Institute of Water Research Dept. of CARRS.

Slides:



Advertisements
Similar presentations
Session 6 Outline Overview of program requirements. Defining your program. Program components. Overview of BMPs. Maintenance inspection. Employee education.
Advertisements

SW101 Municipal Separate Storm Sewer Systems (MS4s)
Stormwater Management Program Training Presented By FAU Environmental Health & Safety Phone: Fax: Web:
Stuck in the SWMP Storm Water Management Programs: New challenges for the Transportation Community.
Stakeholders Meeting – March 5, 2014 Selvin T. Southwell, P.E.
1 Overview of Regulations for Water Quality Protection in South Carolina n Federal Clean Water Act/ NPDES Storm Water Program n South Carolina Pollution.
2009 City of Bozeman Storm Water Update
Implementing Committee Meeting May 15 th, 2014 New Braunfels MS4 program and the HCP 1.
What is NPDES? “National Pollutant Discharge Elimination System”
MS4 Stormwater Permit Program and Great Bay. Brief Overview – EPA’s Stormwater Management Program Clean Water Act – NPDES Stormwater amendments.
Utah Pollutant Discharge Elimination System (UPDES) Utah Sewer Management Program (USMP)
RIPDES Storm Water Program: Municipal Separate Storm Sewer Systems (MS4s)
Upper Providence Township Stormwater Management MS4 Program.
When It Rains, It Drains An Overview of Our Community’s New Storm Water Management Program.
STORMWATER PERMITTING Requirements for the Solid Waste Industry in Colorado 5/04.
Environmental Harm Urban stormwater frequently contains litter, oil, chemicals, toxic metals, bacteria, and excess nutrients, like nitrogen and phosphorous.
Austin Peay State University Stormwater Program Kristen Spicer, Ph.D.
Introduction to Compliance Assistance Documents Part I.
Ferguson Township Municipal Separate Storm Sewer System (MS4) Stormwater Management Program (Our MS4 Story) April 6, 2015 Board of Supervisors Meeting.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
Stormwater Management University of North Carolina at Chapel Hill Sharon Myers, L.G. Environment, Health, and Safety (919)
{Your District Name Here} District Small MS4/Municipal Storm Water Update {Date Here}
Statewide Basic Requirements for Stormwater. New Development, Redevelopment, and Existing Development Stormwater quality issues related to new development,
Stormwater Master Plan University of North Carolina Peter A. Reinhardt Sharon Myers, L.G. Department of Environment, Health and Safety.
Storm Water Pollution Prevention Training
HOW TO DO Pollution Prevention & Good Housekeeping NC STATE UNIVERSITY.
Municipal St rm Water Program. Storm Water Programs Industrial –bus maintenance yards Construction –addition of a gym Municipal.
TOWN OF NEW CASTLE PHASE II ANNUAL STORMWATER REPORT GP Effective May 1, 2010 Expires: April 30, 2015 Reporting Period: March 10, 2014-March 9,
Creation of MS4 Regulations Green / Tradewater River Basin Team Henderson, Kentucky Prepared by Henderson Water Utility April 22, 2008.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
Integrity ♦ Innovation ♦ Accountability ♦ Commitment to Excellence ♦ Teamwork City of Southlake Storm Water Management Plan Christi Upton
Department of Public Works NPDES Low Impact Development and Green Streets Resolutions City Council August 17, 2015.
MS4 Permitting Process William Creal Water Bureau Permits Section Chief.
Introduction to Storm Water Phase II Pennsylvania Department of Environmental Protection.
MDOT Storm Water Management Plan Module 1: Introduction to Storm Water Management Together… Better Roads, Cleaner Streams.
Stormwater Management for Colleges and Universities Phase II for Colleges and Universities State Stormwater Programs Industrial Facilities.
MDOT Storm Water Management Plan Module 4: Illicit Discharge Elimination Program Together… Better Roads, Cleaner Streams.
Why are we here today? To discuss the challenges we face in meeting NPDES Phase II minimum requirements for stormwater control. The NPDES program requires.
Overview of Montana’s Stormwater Regulatory Program.
Construction & Post-Construction Stormwater Ordinance City of Wenatchee, Public Works Department Jessica Shaw, Environmental Manager.
MDOT Storm Water Management Plan Module 2: Best Management Practices
MS4 Permit Updates May 9, 2014 Jay Hoskins, P.E. Metropolitan St. Louis Sewer District.
Stormwater Regulations NC Division Of Water Quality DPPEA Technical Sharing Session May 25, 2004.
Phase II National Storm Water Regulations What’s in it for you?
From the Beginning Design Standards and Other Post-Construction Program Elements.
MS4 APPLICATION PROCESS Mark Fife Water Bureau Water Bureau Permits Section Permits Section.
An Overview of our Community’s Stormwater Management Program
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
 The Illinois Environmental Protection Act is silent with regard to storm water.  Illinois EPA’s authority to deal with storm water derives from delegated.
1 Provision C.3. New and Redevelopment Performance Standards Sue Ma Water Quality Control Board San Francisco Bay Region November 15, 2006.
Program Overview Town of Wrightsville Beach Public Works Department Stormwater Services.
What is Stormwater? Direct result of rainfall Recharges groundwater by infiltration Produces “runoff” (excess rainfall after infiltration) May be concentrated.
CLEAN WATER ACT AND MUNICIPAL STORMWATER CALIFORNIA STORMWATER WORKSHOP David W. Smith, Manager NPDES Permits Section EPA/Region 9.
1. Wolfeboro’s Tool Kit Implemented tools for water quality protection Municipal Watershed District Ground Water Protection Overlay District Steep Slope.
North Hennepin Community College MS4 Plan October 24, 2014.
City Council Storm Water Presentation March 6, 2014.
NPDES Stormwater Rules Phase 1 implemented in 1990 –Large cities (
Why the Need for Increased Stormwater Funding? Citizens expect a higher level of protection from flooding Increased development.
MS4 & Construction Storm Water Permits
Municipal Separate Storm Sewer System (MS4) Permit
Supervisor, RIDEM RIPDES Permitting Program
MS4 On-site evaluations & common findings
Town of Melbourne Beach
Summit County MS4.
Sacramento County Stormwater Quality Program
Stormwater Management Program
John Tinger U.S. EPA Region IX
MS4 OVERVIEW 2015.
MS4 = Municipal Separated Storm Sewer System
Sacramento County Stormwater Quality Program
Presentation transcript:

Storm Water Management at MSU Ruth Kline-Robach Michigan State University Institute of Water Research Dept. of CARRS

Red Cedar River Phase II Storm Water Rules

 Illicit Discharge Elimination  Public Involvement/Public Education  Construction Site Storm Water Control  Storm Water Pollution Prevention & Good Housekeeping  Post Construction Storm Water Management for New Development and Redevelopment Watershed-based Approach  Illicit Discharge Elimination  Public Involvement/Public Education  Construction Site Storm Water Control  Storm Water Pollution Prevention & Good Housekeeping  Post Construction Storm Water Management for New Development and Redevelopment Watershed-based Approach Storm Water Requirements

Greater Lansing Regional Committee (GLRC)

Illicit Discharge Elimination Plan  Inventory of Outfalls  Field Investigation of All Outfalls  Mapping of Outfalls into GIS and Database  Correcting Problems

Public Education Plan

Pollution Prevention and Good Housekeeping Activities  Employee/Contractor Training  Structural Storm Water Control Effectiveness  Roadways, Parking Lots and Bridges  Fleet Maintenance and Storages Yards; and  Managing Vegetated Properties

Post Construction Storm Water Management Minimum Water Quality Treatment Volume Channel Protection Criteria Handling storm water onsite using Low Impact Design (LID) techniques All projects over one acre must meet

Post-Construction Controls: Quality New Permit Post-Construction Controls: Quality Minimum treatment volume standard  One inch of runoff from entire site  Treatment designed for 80 percent removal of total suspended solids (TSS) or less than 80 milligrams per liter TSS

Post-Construction Controls: Quantity New Permit Post-Construction Controls: Quantity Channel Protection Standard  Maintain post-development runoff volume at or below existing levels.  Maintain post-development runoff peak rate at or below existing levels.  Based on 2-year, 24-hour storm.

Program Components Minimum Water Quality Treatment Volume Channel Protection Criteria Site Plan Requirements Operation and Maintenance Requirements Enforcement Mechanisms Recordkeeping Procedures Permittees shall ensure long-term Operation and Maintenance (O&M) plans for the water quality treatment and channel protection controls the permittee requires.

Some Flexibility Allowed for Post-Construction Controls  Allows alternative approaches (need MDNRE approval)  Treat the contiguous campus as one site  MDNRE has agreed to allow volume control at an alternative or regional site at a 1.2 multiplier  Establish an offset/bank program to meet standards

Alternative Approach Highlights for MSU  All projects will need to complete a storm water evaluation of the site including a cost estimate for required measures  Storm Water Review Committee will decide if regional approach is warranted for some or all storm water controls  Storm water fee will be assigned to each project that will include maintenance costs

Timeline  MSU’s Alternative Approach will be submitted to MDNRE by July 1, 2010 with implementation upon approval  Projects that start schematic design after July 1, 2010 will be required to follow the new procedure  All projects already in process should implement measures that are possible to meet the intent of interim compliance under the current permit

Storm Sewer Outfall 42 Orthophoto and Storm Sewer Data from Engineering and Architectural Services, MSU Physical Plant Division Watershed and Microcatchment Delineations by David P. Lusch, Ph.D. Center for Remote Sensing and GIS Michigan State University July, 2002 Watershed of Outfall 42 Microwatersheds of Catchbasins Storm Sewer System discharging at Outfall 42 Sponsored by MSU-WATER Micro-watershed Delineation

Mount Hope Wetland

Surplus Store & Recycling Center

Erickson Hall Rain Garden

PSS Green Roof

 10 oil-water separators located throughout campus  LID Implementation:  Commuter Lot expansion  Farm Lane Underpass bioretention – monitoring and outreach/education  Nutrient separating baffle box installation and monitoring/Cyclone separator  10 oil-water separators located throughout campus  LID Implementation:  Commuter Lot expansion  Farm Lane Underpass bioretention – monitoring and outreach/education  Nutrient separating baffle box installation and monitoring/Cyclone separator Additional Activities

Completed Projects  Eliminated 11 acres of dense residential development in flood plain (University Village)  Eliminated 1.5 acres of road corridor on N. Campus (East Circle Drive)  Planted 994 trees and 2,596 shrubs in 2008  Residence Hall and General Fund building floor drain study

What’s Next?  Storm Water Master Plan development and alternative approach implementation  Integration with Campus Master Plan  Continued participation with the GLRC

Eventually, all things merge into one, and a river runs through it. The river was cut by the world’s great flood and runs over rocks from the basement of time. On some of the rocks are timeless raindrops. Under the rocks are the words, and some of the words [will be ours]. —Norman Maclean