Sending Your Records to PARC A STEP-BY-STEP GUIDE FOR PACKING AND SHIPPING BOXES.

Slides:



Advertisements
Similar presentations
Directorate of Learning Resources Accessing electronic journals from off-campus This causes lots of headaches, but dont despair, heres how to do it! If.
Advertisements

Accessing electronic journals from off- campus This causes lots of headaches, but dont despair, heres how to do it! (Please note – this presentation is.
Receiving Step by Step Summary of Receiving Steps 1.WebSMARTT: Print a “Receiver” (new required step – a separate tutorial is available) 2.Count the.
Recordkeeping for Good Governance Toolkit
Purchasing Goods and Services. Overview In this session you will learn how to utilize the eProcurement Module to create requisitions for purchasing goods.
FedEx Shipping Instructions for Community Days – 2013 Giving Comfort items Valerie Aubel Product and Distribution Coordinator
Irish Butterfly Monitoring Scheme Tutorial for online system
In the top right hand corner you will type in your package code in the box that says “Place Order.” Then you will click “Go.”
Purchasing Cards How to order a P-Card Fill out an application and an agreement Both forms are located at p-cards/
 Decision best made on individual needs of your office  Assess:  Access frequency  Convenience value of records on hand  Weigh against:  Personnel.
 When you receive a new you will be shown a highlighted in yellow box where your can be found  To open your new just double click.
1. Print the Degree Audit 2. Use the Wizard to Add Courses 3. Use Catalog Search and Add 4. Re-print the Degree Audit 5. Contact your Advisor 6. Register.
Chart Prep & Scan. Create a Document Retention Plan and Policy Backing Up Your Data Chart Preparation & Work Area Setup Barcode Cover Pages Printing then.
Student Evaluation Workshop How To’s and Don’t Do’s Kerri L Ford Institutional Research Unit Coordinator Mary Elkins Institutional Research Unit Manager.
ETID Electronic Turn-in Document
Overview Trackaparcel booking system is very easy to use which sends up to minute information directly to the logistic company whilst building the manifest.
State Mail User’s Forum September 21, Agenda Phase I – Archive Box preparation and tracking procedures. – FedEx Ground Overnight – BRM’s IMB redesign.
Very Important Procedures. Written by Mamie Hixon, Betty Burleson, and Rustian Phelps, PPt by Rustian Phelps, May 2011 V. I. P.V. I. P.V. I. P.V. I. P.
How to Fill a Reserve Request Part 3 of the Series on Reserves Using Agent VERSO.
Grades 3-8 Testing 2013 Important Dates ELA MATH Test Administration Tuesday, April 16 th – Thursday, April 18 th Make-up dates Friday, April 19 th – Tuesday,
1. To start the process, Warehouse Stationery (WSL) will invite you to use The Warehouse Group Supplier Electronic Portal and will send you the link to.
WELCOME to the QSNY Portal Public School Self-Study 1.
 When you receive a new you will be shown a highlighted in yellow box where your can be found  To open your new just double click.
The Notebook Your Grade Depends On It!. Getting Started… On OUTSIDE COVER, write ENGLISH 2 and your name and period. Write your first & last name in large,
Entertainment OOEF VPE The University of Texas at Austin Division of Diversity and Community Engagement DDCE Business Procedures Guide Content Contribution.
Records Storage and Destruction at Iron Mountain By Shan Jin, MLIS, CRM, CIP Records Analyst Queen’s University Archives January 2015.
1. Check your order….  Please check your order confirmation documents carefully and ensure that the style, colour and quantity of the items stated match.
Supervisor Approval Instructions- Bi-weekly Payable Time & Absence Requests.
Supervisor Approval Instructions- Bi-weekly Payable Time & Absence Requests.
How To Use NCA’s Online Grant Application System.
22016 AP ® Preadministration Session You need… #2 Pencil Your iPAD if you would like to access a copy of the powerpoint. Answer sheet Student Pack Textbook/notebook.
Alternative Textbook Formats Accommodation Guide for using your accommodation of Alternative Textbook Formats Four simple steps to select and request specific.
Local Government Corporation Resource 2016 NextGen Trustee Year End.
2017 AP® Preadministration Session
SchoolSuccess for Coordinators
2017 AP® Preadministration Session
Please Note: Do not complete answer sheets for the following exams:
Payments Report Verification and Request March 2017
A step-by-Step Guide For labels or merges
Please Note: Do not complete answer sheets for the following exams:
Supervisor Instructions: Bi-Weekly Payable Time/Absence Request
Hiring Manager onboarding
TicketOS Help Guide Process Orders for Shipment
Records Storage Transfer
Absence Management (formerly AESOP) Training for Staff Members
Physical Inventory Training
2018 AP® Preadministration Session
Orders & Shipment Tracking
2018 AP® Preadministration Session
2017 AP® Preadministration Session
Register training Using the college register system
Records Retention.
2017 AP® Preadministration Session
2017 AP® Preadministration Session
Records Storage Transfer
2017 AP® Preadministration Session
Maryland State Department of Education
Volunteer Notetakers How-To Volunteer.
Healthy Youth Survey 2018 Survey Coordinator Training
Alternative Textbook Formats Accommodation
2013 AP® Preadministration Session
Maryland State Department of Education
Please Note: Do not complete answer sheets for the following exams:
2017 AP® Preadministration Session
Exam Accommodation Requests & Exam Policies and Procedures
Volunteer Notetakers A complete guide on how to to sign-up as a Notetaker with the MU Disability Center.
Maryland State Department of Education
Presentation transcript:

Sending Your Records to PARC A STEP-BY-STEP GUIDE FOR PACKING AND SHIPPING BOXES

What This Guide Will Cover  Things to know before you start  Preparing files  Packing files into a box  What to do with non-standard files/materials  Box labeling guidelines  Getting a confirmation number  Scheduling box pickup for delivery to PARC  What happens after boxes are received at PARC

So You Want To Send Records To PARC THINGS TO KNOW BEFORE YOU START

One Box, One Schedule All files within a box must have the same records retention schedule number. If you do not yet know the retention schedule to use, all schedules can be found online here: Records Retention SchedulesRecords Retention Schedules On File List On Files (although the schedule number doesn’t have to appear on the folder tab, it can be included) THINGS TO KNOW BEFORE YOU START

No Binders, Please Binders are not accepted for storage or direct destruction. Please remove all materials from their binders and place in folders, titling the folders using the binder title. If the materials need to be split up into multiple folders, include 1 of 3, 2 of 3, etc. in the folder title so anyone working with the files will know that the multiple folders are considered part of a whole. THINGS TO KNOW BEFORE YOU START

The Right Box: Choose Wisely You must use approved boxes that are new, or in very good condition. (If you need boxes go to the Ordering Archives Boxes instructions on the Records Center website.)Ordering Archives Boxes Non-standard boxes will not be accepted for storage. THINGS TO KNOW BEFORE YOU START Standard Boxes

Preparing Files LABELING AND TIPS

Label folders along the top so that the writing faces the front of the box (handwritten is best using pencil or permanent ink; do not use felt tip markers). Make sure all materials are in the correct file. If files are part of a set, label folders ‘1 of 2’, ‘2 of 2’, etc. If adhesive labels are used, staple the labels to the folders (although it is still best to handwrite titles on folders when possible). PREPARING FILES

Additional Tips  Rubber bands are notorious for losing their elasticity and becoming brittle after a short period of time. The chemicals in the rubber band will also permanently react with the paper, staining the records and sometimes sticking to paper causing it to tear if an attempt is made to remove the rubber band.  Did you know that it only takes a few years for the adhesive on a label to fail? If you do use adhesive labels stapling them onto the file will ensure that the labels do not fall off when they lose their adhesion.  Do not use rubber bands  Staple adhesive labels onto the folder PREPARING FILES

Packing Files into a Box WHAT TO KNOW

Files should be upright in the box, not stacked, and should face the end of the box you will label. (If you have legal sized folders, please contact PARC) PACKING FILES INTO A BOX

Boxes MUST BE FULL, leaving approximately 1-2 inches of space to allow for access (a full ream of paper equals 2 inches). Partially filled boxes will not be accepted for storage. If the box is not full, do not use fillers like crumpled paper or small boxes. Instead, wait until you have enough files to fill up the box. If there will never be enough files to send a full box, contact PARC staff to discuss alternative options. PACKING FILES INTO A BOX

If records do not fit into a standard box – such as oversized materials, rolled maps, or plans - contact PARC for help on how best to transfer those records. Phone: PACKING FILES INTO A BOX

Once A Box Is Full Once a box is full, you can fill out a File List for the box. If you need help filling out the File List, see the following section in the Records Activity Notebook [RAN] Tutorial. If you have multiple boxes you can wait to fill out the entire RAN (including the File List) once all boxes are packed and labeled.Records Activity Notebook [RAN] Tutorial PACKING FILES INTO A BOX

Label the box using the following guidelines  The information you write on the front of the box is the same as what you fill in for the Box List on the RAN. (For detailed instructions on filling in the Box List go here: Records Activity Notice [RAN] Tutorial) Records Activity Notice [RAN] Tutorial  Do not use labels or sheets of paper taped to the box to supply this information – these will not be accepted. You must write the information directly on the box Retention Schedule Number (e.g.: ) 2. Box Number (e.g.: 1; 1 of 3 – number of boxes will be the same as the number of boxes listed on the Box List) 3. Schedule Title (e.g.: OMF/Financial Reporting – CAFR Support Documentation and Account Analysis ) 4. Box Title (e.g.: Audit Schedules) 5. From Date (e.g.: 7/1/2011) 6. To Date (e.g.: 6/30/2012) PACKING FILES INTO A BOX

Next Steps AFTER THE BOX IS PACKED

Now It’s Time To Make Your RAN! With the box(es) packed, you can go to the Records Activity Notice (RAN) Workbook and fill-in the File List (if you haven’t already), Box List, and Transfer Sheet.Records Activity Notice (RAN) Workbook If you need help filling out the RAN, there is a step-by-step tutorial available here: Records Activity Notice (RAN) Tutorial.Records Activity Notice (RAN) Tutorial Before ing the RAN to PARC for approval, double check that the order of the folders in the box matches the File List order. When the RAN is approved you will receive a confirmation number, which allows you to send the boxes to PARC. NEXT STEPS

You’re Almost Finished! Contact Printing & Distribution to schedule a pickup for delivery to PARC by going to P&D Online Service RequestP&D Online Service Request If you have any questions about filling out the request, please contact P&D's Customer Service or NEXT STEPS After the RAN is approved and the boxes are packed, print the Transfer Sheet from the approved RAN (it will have the confirmation number filled in) and tape it to the top of the first box.

What Happens Next? Once boxes arrive at PARC they are reviewed by staff. If there are any issues with the boxes or files, the employee whose name is listed as the ‘Preparer’ on the RAN’s Transfer Sheet will receive an with instructions to correct the issues. The review includes checking that:  Boxes are packed properly for storage (looking to see if boxes are under or over packed; folders are positioned correctly within the box)  Boxes are properly labeled  The files in the box match the File List  All materials are in files  Folders are labeled correctly NEXT STEPS

You’re Finished! If there are no issues with the shipment, files will be entered into TRIM/HPRM in a day or two (depending on the size of the shipment) and be ready for requesting. If you have any questions please contact PARC