Cryo Pump Limitations Recent operating issues with helium Mick Mann ANSTO – Lucas Heights - Australia.

Slides:



Advertisements
Similar presentations
ILIAS WG1 meeting - Birmingham1 Cryogenic Trap Vs Brewster window & noise coupling through windows J. Marque.
Advertisements

Training in Oil & Gas Production for BP Technical Interns Section 4 – Pipes, Fittings, and Safety Looking at pipes, valves and fitting that we use for.
Heinz Grote1 Presentation to NSCX WENDELSTEIN 7-X Assembly Max-Planck- Institut für Plasmaphysik KKS-Nr.: 1-AD Dok-Kennz.: -Txxxx.0 Heinz Grote October.
ELI-NP The Way Ahead-Workshop March 10-11, 2011 Vacuum System for Beam Transport Catalin M. Ticos National Institute for Lasers, Plasma and Radiation Physics.
Ion Source Test Stand Vacuum Control System Johnny Tang.
Dalton’s Law of Partial Pressures Chapter 11 – Section 2 - Physical Characteristics of Gases.
Molar Volume, Density and Molar Mass
Depleted Argon from Underground Sources Henning O. Back – Princeton University For the DarkSide experiment, E-1000 Augustana College – D. Alton FNAL –
Proton Source Repairs Dan Bollinger 2/1/10. Cockcroft-Walton accelerators FNAL has 2 Cockcroft-Walton Pre-accelerators (Pre-acc) that provide beam to.
The MICE vacuum system Presented by Mark Tucker at CM-39, 26 June 2014.
Some results of vacuum stand investigation.. 1. Restoration of turbopump inlet valve V1 tightness The inlet turbopump valve of the first pump station.
July 29, Update on the HBD Gas System Modifications Robert Pisani Brookhaven National Laboratory.
Linac4 Ion Source commissioning: Vacuum Aspects C.Pasquino, N.Thaus, J.Hansen, P.Chiggiato Linac4 Ion Source Review - 14th November 2013.
Vacuum tests of the accelerating structure mock-up The main outputs of the tests would be the following: Feasibility of the assembly of the vacuum manifold.
AdV Vacuum system changes, 04Mar2010, NDRC option Preliminary Cryotrap_NI Link or tube? Cryotrap_NE Link Cryopump SR? Cryopump PR? Zeolites/27K/77K (or.
Homework Check (The Ideal Gas Law) 1.If I contain 3 moles of gas in a container with a volume of 60 L at a temperature of 400 K, what is the pressure inside.
Techniques of Vacuum and Basics of High Voltage (2/3) Pauli Heikkinen Jyväskylä University.
1. - Condensate pump and feed pump trip! -Turbine trips! 2.
S. Jachmich (slide 1) Vessel Conditioning SL-Training, Nov 2010 Vessel conditioning Stefan Jachmich SL-Training 2010.
HD target.
MICE CC Test Status Ruben Carcagno 11/06/13 1. Cooldown Coil Temperature (calculated average in each of 8 coil segments) SC Transition (voltages across.
Objective/Warm-Up SWBAT solve Dalton’s Law and Graham’s Law Problems. What is the ideal gas law?
F. Mazzolini Vacuum Systems for Synchrotron Light Sources Barcelona, September 12– Front-end vacuum system F.Mazzolini.
PIMS IN INSTITUTE FOR NUCLEAR STUDIES Brazing Andrzej Soltan Institute for Nuclear Studies.
Vacuum Workshop on Vacuum Systems for Synchrotron Light Sources, Barcelona, Vacuum Technology, 12 th and 13 th September 2005 L. Schulz Introduction Pumps.
CM1 Thermal Cycle CM1 Warmup –1/4/12 (Wed.) to 1/6/12 (Fri.) (~50 hours) –Verified turbo interlock system works CM1 Cooldown –Began 1/9/12 (Monday) –At.
SC Project Review of NCSX, April 8-10, 2008 NCSX Fueling and Vacuum Pumping Systems W. Blanchard WBS 21 and 22 Manager.
ELENA Vacuum System R. Kersevan, TE-VSC-IVM R. Kersevan, “ELENA Vacuum System”, - ELENA Project Review, Oct14-15, 2013, CERN.
Just add them up! 200 kPa500 kPa400 kPa1100 kPa ++=
05 Novembre 2003Chamonix XIV Workshop, January How to deal with leaks in the QRL and magnet insulation vacuum Paul Cruikshank for AT/VAC Germana.
Vacuum Research Solution Discussion. ELL block diagram E ELL Pump A C D F To a “J” shaped hook N2N2 B G ELL Vacuum System Wide pipe narrow pipe.
Vacuum Fundamentals High-Vacuum Technology Course Week 7 Paul Nash HE Subject Leader (Engineering)
Collab 4/15/04 #1 EDMEDM UIUC meeting 12/3/2004 Walter Sondheim, P-25, Los Alamos for presentation to The EDM Collaboration UIUC meeting, Urbana, IL UCN.
ELENA Source Vacuum System, LNS R. Kersevan Integration and Installation Committe – 18 Sept 2014.
Agenda – Basics of cavity integration into CAST Introduction (M Davenport) Information exchange 2016 – Vacuum in cold bore – 2 cavities Cooling RF Cavities.
Vacuum issues concerning the Proton Source and LEBT Salvo Marletta, Luigi Celona, Lorenzo Neri, Franco Chines, David Mascali.
Gases Pressure Boyle’s Law Charles’ Law Gay-Lussac’s Law
NCSX NCSX CDR May 21-23, 2002 H.W. Kugel Slide 1 Conceptual Design for NCSX Auxiliary Systems Heating, Fueling,Wall Conditioning and Vacuum Systems.
CM28 - Vacuum System Update Matt Hills Mike Courthold 1.
National Ignition Facility Vacuum Systems Presentation to OLAV Workshop, ORNL July 11-14, 2011 NIF Vacuum Subsystems Managers Igor Maslennikov* John Hitchcock.
ATMOSPHERE 17.1 ATMOSPHERE IN BALANCE. KATRINA.
Experimental Setup and FEL Interface Will Williams and Zheng-Tian Lu Argonne National Lab.
2007/09/17-21 SLAC IRENG07 1 A Basic Design of IR Vacuum system Y. Suetsugu, KEK Possibility of a pumping system without in-situ baking at z < L*
Hydrogen Control System MJD Courthold TW Bradshaw Y Ivanyushenkov D Baynham.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
CMS Double Chooz HESS Edelweiss Herschel ALICE Detecting radiations from the Universe. EXPERIENCE WITH VACUUM SYSTEM FROM DESY AND CEA SOLUTIONS TTC topical.
Vacuum conditions in PANDA pbar-line Alexander Gruber, SMI, Vienna, Austria.
Outgassing of Outer Tracker Glue Maarten Buffing (VU) June
DESIGN AND PERFORMANCE OF VACUUM SYSTEM FOR HIGH HEAT FLUX TEST FACILITY Rajamannar Swamy*, Prakash Mokaria, Samir Khirwadkar, Sunil Belsare, M S Khan,
More Gas Laws and Concepts. Measuring Pressure with a Barometer.
Overview of elliptical cryomodules vacuum system Vacuum Equipment Standardization meeting February 2014 P. Bosland – C. Darve – N. Elias.
Jari Koskinen 1 Thin Film Technology Lecture 2 Vacuum Surface Engineering Jari Koskinen 2014.
1 Before degassing RGA head After degassing RGA head RGA scans of test dewar December 23, 2005 (PR and SP) Ion Gauge readings : Vacuum (with RGA off) before.
Paolo Michelato, July 19-22, 2006 Global Design Effort 1 Vacuum system segmentation Cold vacuum system segmentation reflects the cryogenic structure of.
01/09/ KTAG 5/8 sectors equipped DCS system in pogress DAQ commissioning in progress Test pressure scan this week (t.b.c) 01/09/20142.
Vacuum System P. Chiggiato TE-VSC
Stephan Aulenbacher MAGIX Collaboration Meeting
RTML Vacuum System RDR Summary FermiLab October 24, 2007
SAES Project: Combination of NEG module and sputter ion pump
Operation status of KTX
K. H. Lee, H. Y. Lee, Young-Gi Kim, J. Yang, S. M. Yang, K.J. Chung, Y.S. Na and Y. S. Hwang Residual Gas analysis during Glow discharge cleaning, Baking.
Project Manager’s Report + DC/MoM Report
1 Connect pumping equipment (group) with leak detector to insulation vacuum 1 or 2 pumping groups? connected to SB or CM or both? Which pumping group?
Bubble Chamber Planning Meeting
TTC Hot Topic Common Questions
Cryomodule design modifications for C75
BASIC VACUUM PRACTICE.
NEG-coated gun: Black R30 arc at 227kV, white R30 arc at 164 after refurbishing and second bake Carlos Wednesday, August 10, 2018.
Line Sizing By Shardul Kulkarni.
Vacuum System Design for the Target Monolith System
Presentation transcript:

Cryo Pump Limitations Recent operating issues with helium Mick Mann ANSTO – Lucas Heights - Australia

ANTARES LE Beamline

We have a pumping problem! Cryo at injection magnet was regenerated twice in a month because of poor vacuum. HE beamline vacuum LE flange vacuum

We have a pumping problem

What could be causing this? Initial RGA test finds large Xenon peaks even though we have not been using Xenon to strip gas. Ar He N2N2 O2O2 Xe Turn off pelletron chains Terminal turbo dumping gas load into beamline

Helium is the culprit Closing LE flange gate valve results in sharp reduction helium abundance Ar He N2N2 O2O2

ANTARES LE Beamline RGA

Helium is the culprit Scan of LE beamline. Note the dominant He peak. Where is it coming from though??? H2OH2O He N2N2 O2O2 H

Helium is the culprit He N2N2 Unstable helium partial pressure component.

The Source Of Helium? H2OH2O He N2N2 O2O2 H2H2 Ar Closing cryo GV increases gas pressures due to decreased pumping but not in the case of helium RGA

The Source Of Helium? Close manual gate valve H2OH2O He N2N2 O2O2 H2H2 Ar RGA

H2OH2O He N2N2 O2O2 H H2OH2O N2N2 O2O2 H The Source Of Helium? Scan with all cryopumps open to beamline Scan with all cryopumps closed to beamline. Pumped using 2 turbo pumps (520l/s). Helium reduced by a factor of >1000!

What to do now? Since the 15K charcoal array is full of helium Replacement of array on pump is necessary

After changing arrays:

Comparison between Cryopumping speed and turbo pumping speed on different gasses Close then open the cryopump gate valve Close then open the turbopump gate valve H2OH2O He N2N2 O2O2 H2OH2O N2N2 O2O2

After changing arrays: After only 3 weeks we are back to our old problems with the cryo Unknown cause of helium increase Close gate valve Open gate valve H2OH2O He N2N2

Pumping Speed Cryopump – CT8 Turbopump – TMP521 Water4000 l/s300 l/s Hydrogen2500 l/s380 l/s Nitrogen1500 l/s290 l/s Argon1200 l/s260 l/s Helium-400 l/s

What is my effective pumping speed? S eff -1 = L -1 + S -1 L = _ ______ 12.l c.π.d³ Effective Pumping Speed Pump Speed Conductance Gas Velocity Pipe Diameter Pipe Length S eff – S – L – c – d – l – -

What is my effective pumping speed? Conductance based on Ø100mm pipe x 1000mm long

What is my effective pumping speed?

Where to from here? Replace the cryo on alphatross injection line with a turbopump to reduce load of helium from alphatross to the cryo pumps on the LE beamline Monitor helium contamination of LE beamline for change over time More frequent replacement of cryo arrays where necessary

Questions…

Thank You!