Updating the MA DG Interconnection Report DOER analysis of the Utility reporting of DG interconnection projects following the Expedited and Standard Review.

Slides:



Advertisements
Similar presentations
GEORGIA POWERS SMALL POWER PRODUCERS FUNDAMENTALS.
Advertisements

Open Season MT to Idaho Calendar of Events Posted on NWE OASIS September 30, 2004 (Slide 8 updated 2/28/05)
Revised Draft1 Distributed Generation Interconnections - Group Study Process Option: Voluntary Rolling Window Presented to Massachusetts Distributed.
DG Interconnection Working Group Fees and Cost Support for DG Interconnections August 6, 2012.
Distributed Generation (DG)
Recent NERC Standards Activities RSC – Jan. 5, 2011 NSRS Update Date Meeting Title (optional)
1 RTWG Tariff update to the BOD, MOPC, SPC, and RSC January 4, 2005.
Duke Energy Ohio Standby Rates Jim Ziolkowski, P.E., Rates Manager September 13,
California Interconnection 101 An Update on Reform: What’s Happening and Why it is Important March 16, 2011 Sky C. Stanfield
Regulatory framework in the Energy Sector Chairman Ph.D. Tserenpurev Tudev Energy Regulatory Commission of Mongolia Energy Mongolia-2012 Ulaanbaatar Mongolia.
Interconnection of Distributed Generation and Net-Metering in MA Tim Roughan National Grid.
Confidential Draft 2012 PG&E Wholesale Distribution Tariff (WDT) Generator Interconnection Procedures (GIP) Changes Electric Generation Interconnection.
SPP.org 11. SPP Delivery Point Addition (DPA) Process Effective May 1, 2010.
Central Electricity Regulatory Commission (Grant of Regulatory Approval for execution of Inter-State Transmission Scheme to Central Transmission Utility)
IMPACTS OF LARGE DISTRIBUTED GENERATORS ON CENTERPOINT ENERGY’S DISTRIBUTION SYSTEM 1 Presented by Ed Briggs, P.E. Manager of Electric Distribution Planning.
Net Metering and Interconnection A Policy Perspective Brad Klein Staff Attorney Envt’l Law & Policy Center March 28, 2007.
THE FUTURE OF SOLAR ENERGY IN LITHUANIA OPTIONS AND OPPORTUNITIES FOR DEVELOPMENT Vitas Mačiulis Lithuanian Solar Energy Association 19 September, 2013.
Interconnection of Distributed Generation
Federal Energy Regulatory Commission Proposed Rule on Small Generator Interconnection RM July 23, 2003.
Net Metering and Interconnection Requirements IMUA 2015 Annual Conference May 8, 2015 Delia Patterson General Counsel, APPA.
Topics to Cover Interconnection Process Overview
The Regulatory Assistance Project 110 B Water St. Hallowell, Maine USA Tel: Fax: State Street, Suite 3 Montpelier, Vermont.
Interconnection of Small Wind & Solar Systems to Distribution Utilities: A Cooperative Perspective Patrick Parke Midwest Energy Hays, KS September 26,
2014 Distributed Generation Contracts Program – Recommended Megawatt Allocation Plan November 27, 2013.
Summary Overview: MADRI Model Small Generator Interconnection Procedures Prepared by Brad Johnson* June 15, 2006 ACN Energy Ventures
Creating A Greener Energy Future For the Commonwealth MA State Programs and Policies Meg Lusardi Mansfield, MA June 17, 2009.
November 10, 2009 NOIE DRG Settlements TF update to COPS Settlement Discussion for ALL DG < or = 1 MW Don Tucker on behalf of the NOIE DRG Settlements.
Small Generation Interconnection Standards - IOU Dennis Reed Westar Energy Topeka, KS September 26, 2007.
> 30 kW Interconnection Work Group Meeting June 19, 2007.
0 Photovoltaic Developers Perspective Photovoltaic and Storage Workshop ERCOT Aruna Ranaweera, Ph.D., P.E. OCI Solar Power October 15, 2012.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Current DG Framework for Competitive Areas of ERCOT DREAM TF September 28, 2015.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Large Generator Interconnection Procedures Reform Stakeholder Meeting February 19, 2009.
OSC Meeting April 27, Transmission Cost Allocation Overview.
1 Bilateral Interconnection Agreement Model Presented to HAPUA Working Group 5 (ESI Services), Project 6 By Power Purchase Agreement Division Electricity.
Overview Interconnection Federal Regulations –1978 PURPA Legislation –1992, 2005 & 2007 PURPA Legislation Changes –RUS Rules DG Policy State Regulations.
Ainārs Meņģelsons Public Utilities Commission Latvia 11th Baltic Energy Regional Initiative October 1, 2010 Jūrmala, Latvia ELECTRICITY REGIONAL INITIATIVE.
Washington’s Water Use Efficiency Rule May Require Increased Coordination for Many Utilities Dan Sander, P.E. Senior Engineer.
Resource Adequacy for Distributed Generation January 27, :15 am to 12 noon Energy Division staff discussion Megha Lakhchaura.
1 Distributive Generation Wind Landfill Solar Fuel CellMicro-Turbine.
2010 Massachusetts Energy Efficiency Programs July 1, 2010.
March 30, 2012 Wholesale Generation Interconnection Process Photovoltaic Program Power Purchase Agreements Request for Offers.
Utah Geothermal Power Generation Workshop Regulatory Issues August 17, 2005 Presented by Becky Wilson Utility Economist Utah Public Service Commission.
Transmission Customer Forum Operating Agreement Update Cheryl Johnson 9/21/06.
2014 Distributed Generation Contracts Program - Megawatt Allocation Plan Tentative Scenarios Thursday, November 7, 2013.
ERS Update – DSWG Presentation September 21, 2012.
Distributed Generation Registration June 30, 2008.
1 Entergy Transmission Planning Summit New Orleans, LA July 10, 2003 Generation and Transmission Development in the Southeastern United States.
State of Solar in North Carolina Amy Heinemann March 7,
CAP142: Temporary TEC Exchange  Process derived from LDTEC principles  Example Scenarios.
Interconnected Generation Preliminary Engineering Work Related to Fees.
Distributed Generation Chau Nguyen, Pricing & Sales Support
Summary Overview: Maryland Straw Man Interconnection Rule Prepared by Brad Johnson* January 11, 2007 ACN Energy Ventures *National.
Illinois Distributed generation Procurement program
Illinois Distributed generation Procurement program
UPDATES ON OPEN ACCESS AND RETAIL COMPETITION
Grid Code Development Forum – 6 September 2017
Proposal for Distribution Group Studies
DISTRIBUTED GENERATION (DG) MODELING CRITERIA SWEDE 2016
IID Generating Facility Interconnection Process
Collaborative Results Restructuring Roundtable March 28, 2003
Net Metering John McComb: P.E.
MA DG Working Group Update Restructuring Roundtable October 26, 2012
The Need for Compensatory Standby Rates
ICA for Rule 21 Crawl – Walk – Jog – Run.
City Council April 30, 2018 Item 13
Agenda Safety Message Timelines Responsibilities of the parties
Net Metering John McComb: P.E.
Comparison: Ginna 480 MW Installed PV Power as of the end of 2005
Presentation transcript:

Updating the MA DG Interconnection Report DOER analysis of the Utility reporting of DG interconnection projects following the Expedited and Standard Review Processes from January 1, 2009 to May 1, 2012* * This analysis does not include applications submitted before January 2009 or projects following the Simplified Process (<10 kW on single-phase lines and <25 kW on three-phase lines after Jan 2009). The DG Report summarized projects through 2010 and is available at the MA Interconnection and Distributed Generation Website.MA Interconnection and Distributed Generation Website Presentation to the DG Working Group - May 31, 2012 Gerry Bingham, Senior Coordinator / Distributed Generation

Figure 4.22 (2009-May 2012) Applications by Year and Company (Standard and Expedited)

Figure 4.1 (2011-April 2012): Capacity of Projects By Size (kW) *NOTE: 92 projects (208 MW) have not yet been assigned a process.

Figure 4.2 (2011-April 2012): Number of Applications By Technology *NOTE: 92 projects (208 MW) have not yet been assigned a process.

Figure 4.3 (2011-April 2012): Capacity of Projects by Technology (kW)

Figure 4.8 (2011-April 2012): Percentage of Applications Exceeding Timeline Specified by Tariff (This tracks only projects that rec’d Agreements in each year)

Review Paths Side-by-Side 11

Expedited and Standard Process Flowchart 12 Customer submits application App complete (10 days) No Acknowledge w/i 3 days Initial review and screening (25 days) Provide Additional info Reviews needed? Perform Supplemental (20 days) All rqmts determine d Perform Studies (55 days/30 days) Send agreement (15 days) Complete system modifications D Facility Modificatio n needed Customer pays for modifications No Yes Information Exchange as needed Customer signs agreement, builds facility, provides insurance, relay test results and test plan, pays for witness test, etc. Relay Witness Test Authorize Interconnect Yes None Provide Additional info Information Exchange as needed Customer Utility Start

Expedited and Standard Process Flowchart 13 Customer submits application App complete (10 days) No Acknowledge w/i 3 days Initial review and screening (25 days) Provide Additional info Reviews needed? Perform Supplemental (20 days) All rqmts determine d Perform Studies (55 days/30 days) Send agreement (15 days) Complete system modifications D Facility Modificatio n needed Customer pays for modifications No Yes Information Exchange as needed Customer signs agreement, builds facility, provides insurance, relay test results and test plan, pays for witness test, etc. Relay Witness Test Authorize Interconnect Yes None Provide Additional info Information Exchange as needed Customer Utility Start

14 Customer submits application App complete (10 days) Send agreement (60/150 days) Yes Authorize Interconnect Customer Utility Start

15 Customer submits application App complete (10 days) Send agreement (60/150 days) Yes Authorize Interconnect Customer Utility Start Process Phases Using Existing Reporting

16 Customer Utility

17 Customer Utility Rec’d Agreement In Study App. Deemed Complete Application Rec’d Information Exchange Authorized! Post- Agreement / Construction 3 4 5

18 Customer Utility 628 MW In Study App. Deemed Complete Application Rec’d Projects Stuck at “Application Complete” Calendar Days Lapsed

Days Size (kW) 563 Projects 628 MW Note: There are 37 Projects reported as “0” kW. Standard: 210 calendar days

20 Customer Utility 99.5 MW Rec’d Agreement In Study App. Deemed Complete Application Rec’d Projects that Received an Agreement

Expedited Projects – Time Lapsed for Received Agreement Days Expedited Review Max Timeline: 84 calendar days (Tariff: 60 business days) Size (kW) 378 Projects 39 MW

Standard Review Projects – Time Lapsed for Received Agreement Days Standard Review Max Timeline: 210 calendar days (Tariff: 150 business days) Size (kW) 59 Projects 60.5 MW

23 Customer Utility 41 MW Post- Agreement / Construction Rec’d Agreement In Study App. Deemed Complete Application Rec’d

Post-Agreement Projects Awaiting Signature/Construction/Approval to Connect Size (kW) Days 207 Projects 41 MW Timelines for Construction are treated on a project by project basis by utility commitment in the Agreement.

DG Applications Submitted vs. Processed Starting Jan 2009 (Cumulative kW) Applied Authorized

Figure 4.23: DG Applications Submitted vs. Processed Each Year (Cumulative kW)

NU-NSTAR DG Applications Submitted vs. Processed Each Year (Cumulative kW) AppliedAuthorized ,2413, ,46513, ,27232, ,65143,695

National Grid DG Applications Submitted vs. Processed Each Year (Cumulative kW) AppliedAuthorized ,5102, ,74113, ,22934, ,71850,960

NU-WMECo DG Applications Submitted vs. Processed Each Year (Cumulative kW) AppliedAuthorized , ,1771, ,7504, ,0448,807

Unitil DG Applications Submitted vs. Processed Each Year (Cumulative kW) AppliedAuthorized , ,541

Freshness of Complete Applications Awaiting Agreement <84 Days Days>210 DaysTotal <500kW Apps Avg (MW) MW kW- 1MW Apps Avg (MW) MW >1MW Apps Avg (MW) MW Total Apps Avg (MW) MW < 84 Days > 210 Days MW Snapshot: November 2011 Should DOER update?

< 84 Days > 210 Days MW Days Freshness of Complete Applications Awaiting Agreement (distribution by size) Snapshot: November 2011 Should DOER update?