Www.izmirekonomi.edu.tr L16: Comparing Mutually Exclusive Alternatives ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer.

Slides:



Advertisements
Similar presentations
Engineering Economy Practice Problems
Advertisements

Incremental Analysis Lecture No. 21 Professor C. S. Park
Contemporary Engineering Economics, 4 th edition, © 2007 Incremental Analysis Lecture No. 28 Chapter 7 Contemporary Engineering Economics Copyright © 2006.
INFO 630 Evaluation of Information Systems Prof. Glenn Booker Week 8 – Chapters INFO630 Week 8.
Lecture 7 Evaluating a Single Project PW, FW, AW IRR
Rate of Return Analysis ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer Sciences.
Evaluating Business and Engineering Assets Payback Period.
MANAGERIAL ACCOUNTING
Exam 4 Practice Problems Douglas Rittmann, Ph.D., P.E.
L10: Debt Management ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer Sciences.
ENGINEERING ECONOMY DR. MAISARA MOHYELDIN GASIM Chapter 4-5 Comparison of Alternatives Annual Worth Analysis.
Internal Rate of Return (Multiple Rates of Return Problem) ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering.
8/25/04 Valerie Tardiff and Paul Jensen Operations Research Models and Methods Copyright All rights reserved Economic Decision Making Decisions.
Flash back before we compare mutually exclusive alternatives.
Engineering Economy IEN255 Chapter 4 - Present Worth Analysis  Do the product or not?  3 main issues  How much additional investment in plant & equipment.
Internal Rate of Return (Multiple Rates of Return Problem) Lecture No. 20 Professor C. S. Park Fundamentals of Engineering Economics Copyright © 2005.
Contemporary Engineering Economics, 4 th edition, © 2007 Discounted Cash Flow Analysis Lecture No.16 Chapter 5 Contemporary Engineering Economics Copyright.
(c) 2001 Contemporary Engineering Economics 1 Chapter 7 Present Worth Analysis Describing Project Cash Flows Initial Project Screening Method Present Worth.
Contemporary Engineering Economics, 4 th edition, © 2007 Comparing Mutually Exclusive Alternatives Lecture No.18 Chapter 5 Contemporary Engineering Economics.
Contemporary Engineering Economics, 4 th edition, © 2007 Discounted Cash Flow Analysis Lecture No.16 Chapter 5 Contemporary Engineering Economics Copyright.
FOOD ENGINEERING DESIGN AND ECONOMICS
Intro to Engineering Economy
Engineering Economics Contemporary Engineering Economics, 5 th edition, © 2010.
1 Reviewing… Net Present Worth: Used to select among alternative projects. Used to compare mutually exclusive alternatives. If all expenses and revenues.
(c) 2001 Contemporary Engineering Economics1 Discount Rate to be Used in Project Analysis ECON 320 Engineering Economics Mahmut.
L24: Net Income Versus Cash Flow ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer Sciences.
L30: Methods of Handling Project Risk ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer Sciences.
Capital Budgeting Decisions
Lecture No. 37 Chapter 11 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5th edition, © 2010.
ENGINEERING ECONOMICS ISE460 SESSION 10 CHAPTER 5, June 15, 2015 Geza P. Bottlik Page 1 OUTLINE Questions? News? Quiz results Go over quiz Homework due.
L3: Economic Equivalence ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer Sciences.
Copyright ©2012 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights reserved. Engineering Economy, Fifteenth Edition By William.
The second objective today is to evaluate correctly capital investment alternatives when the time value of money is a key influence.
Slide Sets to accompany Blank & Tarquin, Engineering Economy, 6 th Edition, 2005 © 2005 by McGraw-Hill, New York, N.Y All Rights Reserved 6-1 Developed.
Lecture No. 26 Chapter 7 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5 th edition, © 2010.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Internal Rate of Return Criterion.
L15: Present Worth Analysis ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer Sciences.
L29: Sensitivity and Breakeven Analysis ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer.
Copyright ©2009 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights reserved. Engineering Economy, Fourteenth Edition By William.
Chapter 7 Annual Worth Analysis.
L14: Evaluating Business and Engineering Assets – Part II ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering.
1 Word Problems Organize the Data Given: Determine the objective and your strategy. Draw the Cash Flow Diagram. Write Equations and Solve. Reflect Back.
L6: Interest Formulas (Gradient Series) ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer.
Ch 10-1 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating.
L:21 Incremental Analysis ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer Sciences.
L18: Annual Worth Analysis ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer Sciences.
L12: Actual and Constant Dollars ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer Sciences.
Construction Accounting & Financial Management, 3/e Steven Peterson © 2013 by Pearson Higher Education, Inc Upper Saddle River, New Jersey All Rights.
L7: Unconventional Equivalence Calculations
Lecture No.18 Chapter 5 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5 th edition, © 2010.
Chapter 5 Present-Worth Analysis. 2 Loan versus Project Cash Flows Initial Project Screening Methods Present-Worth Analysis Methods to Compare Mutually.
Comparing Economic Alternatives Using time value of money to choose between two or more options.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Comparing Mutually Exclusive Alternatives.
Chapter 6: Comparison and Selection Among Alternatives
Part 1 : Understanding Money And Its Management (Ch1,2,3,4) Part 2: Evaluating Business and Engineering Assets (5,6,7)
Chapter 6: Comparison and Selection Among Alternatives
Comparing Mutually Exclusive Alternatives
Chapter 6: Comparison and Selection Among Alternatives
Chapter 6: Comparison and Selection Among Alternatives
Chapter 7 Present Worth Analysis
Example Problem A company is considering the purchase of a new piece of testing equipment that is expected to produce $8,000 additional income during the.
By Muhammad Shahid Iqbal
PRESENT WORTH ANALYSIS Chapter 5
Chapter 6: Comparison and Selection Among Alternatives
Chapter 6: Comparison and Selection Among Alternatives
Capital Budgeting Techniques
Example Problem A company is considering the purchase of a new piece of testing equipment that is expected to produce $8,000 additional income during the.
Chapter 6: Comparison and Selection Among Alternatives
OUTLINE Questions? News? New homework due Wednesday
OUTLINE Questions? News? New homework due Wednesday
Presentation transcript:

L16: Comparing Mutually Exclusive Alternatives ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer Sciences

Comparing Mutually Exclusive Projects  Mutually Exclusive Projects  Alternative vs. Project  Do-Nothing Alternative

 Revenue Projects Projects whose revenues depend on the choice of alternatives  Service Projects Projects whose revenues do not depend on the choice of alternative

 Analysis Period The time span over which the economic effects of an investment will be evaluated (study period or planning horizon).  Required Service Period The time span over which the service of an equipment (or investment) will be needed.

Comparing Mutually Exclusive Projects  Principle: Projects must be compared over an equal time span.  Rule of Thumb: If the required service period is given, the analysis period should be the same as the required service period.

Case 1: Analysis Period Equals Project Lives Compute the PW for each project over its life $450 $600 $500$1,400 $2,075 $2,110 0 $1,000$4,000 A B PW (10%) = $283 PW (10%) = $579 A B

$1,000 $450 $600 $500 Project A $1,000 $600 $500 $450 $3,000 3,993 $4,000 $1,400 $2,075 $2,110 Project B Modified Project A Comparing projects requiring different levels of investment – Assume that the unused funds will be invested at MARR. PW(10%) A = $283 PW(10%) B = $579 This portion of investment will earn 10% return on investment.

Case 2: Analysis Period Shorter than Project Lives  Estimate the salvage value at the end of the required service period.  Compute the PW for each project over the required service period.

Example Comparison of unequal-lived service projects when the required service period is shorter than the individual project life Required Service Period = 2 years

PW(15%)B = -$364,000 PW(15%)A = -$362,000

Case 3: Analysis Period Longer than Project Lives  Come up with replacement projects that match or exceed the required service period.  Compute the PW for each project over the required service period.

Example Comparison for Service Projects with Unequal Lives when the required service period is longer than the individual project life Required Service Period = 5 years Model A Model B $15,000 $12,500 $4,000 $4,500 $5,000 $5,500 $1,500 $5,000 $5,500 $6,000 $2,

Lease Model A to serve the remaining service life PW(15%)A = -$ PW(15%)B = -$33,173

Summary Present worth is an equivalence method of analysis in which a project’s cash flows are discounted to a lump sum amount at present time. The MARR or minimum attractive rate of return is the interest rate at which a firm can always earn or borrow money. MARR is generally dictated by management and is the rate at which NPW analysis should be conducted. Two measures of investment, the net future worth and the capitalized equivalent worth, are variations to the NPW criterion.

The term mutually exclusive means that, when one of several alternatives that meet the same need is selected, the others will be rejected. Revenue projects are those for which the income generated depends on the choice of project. Service projects are those for which income remains the same, regardless of which project is selected. The analysis period (study period) is the time span over which the economic effects of an investment will be evaluated. The required service period is the time span over which the service of an equipment (or investment) will be needed.

The analysis period should be chosen to cover the required service period. When not specified by management or company policy, the analysis period to use in a comparison of mutually exclusive projects may be chosen by an individual analyst.