TOG, Torun, April 2009 Arpad Szomoru, JIVE EVN/JIVE Technical developments.

Slides:



Advertisements
Similar presentations
SCARIe: Realtime software correlation Nico Kruithof, Damien Marchal.
Advertisements

Castelle FaxPress Plus™ FaxPress Premier and FaxPress Enterprise
Onsala Space Observatory Present status and technical directions of the EVN Michael Lindqvist Onsala Space Observatory, Sweden Arpad.
Project Partners Project Collaborators The Council for the Central Laboratory of the Research Councils Funded by EPSRC GR/T04465/01
The CVN Real Time Correlator Zhang Xiuzhong, Chen Zhong Shanghai Astronomical Observatory China 4th e-VLBI Workshop Sydney
7th US VLBI Technical Meeting at Haystack Observatory, November 3-4, 2009 Arecibo VLBI Report Arecibo VLBI Team: V. Arun, R. Ganesan, T. Ghosh, C. Salter.
First e-EVN Science and Future Astronomy projects via EXPReS Michael Garrett Joint Institute for VLBI in Europe e-VLBI Workshop, Sydney, 13 July 2005.
Baseband processing, e-VLBI, and SKA simulations Steven Tingay Swinburne University of Technology MNRF Symposium, 8 June, 2004.
Ongoing e-VLBI Developments with K5 VLBI System Hiroshi Takeuchi, Tetsuro Kondo, Yasuhiro Koyama, and Moritaka Kimura Kashima Space Research Center/NICT.
E-VLBI Development at Haystack Observatory Alan Whitney Chet Ruszczyk Kevin Dudevoir Jason SooHoo MIT Haystack Observatory 24 March 2006 EVN TOG meeting.
VLBI Report LBA Operations & eVLBI Tasso Tzioumis ATNF May 2008.
Electronic Transmission of Very- Long Baseline Interferometry Data National Internet2 day, March 18, 2004 David LapsleyAlan Whitney MIT Haystack Observatory,
E-VLBI Development at Haystack Observatory 5 th Annual e-VLBI Workshop Haystack Observatory 20 September 2006 Alan R. Whitney Kevin Dudevoir Chester Ruszczyk.
Current LBA Developments Chris Phillips CSIRO ATNF 13/7/2005.
NV V5.7 Product Presentation. Brand New Professional GUI  Multiple User Interface for different look and feel  Audio indicator on camera (play audio.
Marcin Okoń Pozna ń Supercomputing and Networking Center, Supercomputing Department e-Science 2006, Amsterdam, Dec Virtual Laboratory as a Remote.
New correlator MicroPARSEC Igor Surkis, Vladimir Zimovsky, Violetta Shantyr, Alexey Melnikov Institute of Applied Astronomy Russian Academy of Science.
High Data Rate Transfer for HEP and VLBI Ralph Spencer, Richard Hughes-Jones and Simon Casey The University of Manchester Netwrokshop33 March 2005.
EVN-NREN meeting, Schiphol, , A. Szomoru, JIVE Recent eVLBI developments at JIVE Arpad Szomoru Joint Institute for VLBI in Europe.
High Rate Internet Data Transfer for eVLBI Ralph Spencer, Richard Hughes-Jones and Simon Casey The University of Manchester All Hands Sept 2005.
VLBI/eVLBI with the 305-m Arecibo Radio Telescope Chris Salter Tapasi Ghosh Emmanuel Momjian Arun Venkataraman Jon Hagen.
Althea Wilkinson RadioNet Project Manager University of Manchester Jodrell Bank Observatory Project Manager’s Report & Finance Report Rome September 2008.
Introduction VLBI_UDP is an application being developed to transfer VLBI data using the UDP protocol. Initially developed by Richard Hughes- Jones for.
4th e-VLBI workshop, Sydney, July 2005, A. Szomoru, JIVE e-VLBI and EXPReS Arpad Szomoru.
Arecibo (JIVE/EXPReS +) Presented by : Tapasi Ghosh Other active players: Arun Venkataraman, Chris Salter, & Emmanuel Momjian. A brief history.
DiFX Performance Testing Chris Phillips eVLBI Project Scientist 25 June 2009.
E-VLBI FP6 Proposal. Outline Background The Call Content of Proposal & Aim Possible Participants Overall preparation plan.
Update on the Software Correlator Nico Kruithof, Huseyin Özdemir, Yurii Pydoprihora, Ruud Oerlemans, Mark Kettenis, JIVE.
DiFX New Features. Disk based file specification Improved specification of files to correlate Wild cards with time of scan name filtering? External reference.
Westerbork Netherlands Dedicated Gbit link Onsala Sweden Gbit link Jodrell Bank UK Dwingeloo DWDM link Cambridge UK MERLIN Medicina Italy Chalmers University.
Distributed FX software correlation Adam Deller Swinburne University/CSIRO Australia Telescope National Facility Supervisors: A/Prof Steven Tingay, Prof.
Review of developments in Australasia and mainland Asia Steven Tingay Swinburne University of Technology Next Generation correlator meeting, JIVE 27 -
1 eVLBI Developments at Jodrell Bank Observatory Ralph Spencer, Richard Hughes- Jones, Simon Casey, Paul Burgess, The University of Manchester.
TOG, Yebes, November 2007, A. Szomoru, JIVE Arpad Szomoru, JIVE EXPReS progress, Mark5 and e-VLBI.
Service Challenge Meeting “Review of Service Challenge 1” James Casey, IT-GD, CERN RAL, 26 January 2005.
5 th e-VLBI Workshop, Haystack Observatory, September 2006, A. Szomoru, JIVE e-VLBI Developments at JIVE Arpad Szomoru.
NEXPReS Period 3 Overview WP 6: High Bandwidth on Demand Paul Boven, JIVE.
NEXPReS Period 3 Overview WP8 FlexBuff High-Bandwidth, High-Capacity Networked Storage Ari Mujunen Aalto University Metsähovi Radio Observatory Finland.
EVN Performance and Reliability Iván Agudo. Collection of Highlights A large improvement of the EVN in terms of new stations & sensitivity! First fringes.
SA1: Production e-VLBI service Arpad Szomoru JIVE.
SA1: second year overview Arpad Szomoru JIVE January 30EXPReS Board Meeting, Utrecht, the Netherlands: SA1Slide #2 Outline Accomplishments in 2007.
2007 April 17EXPReS Annual ReviewSlide #: 1. EXPReS Annual Review April 17 EXPReS Project Team JIVE, Coordinating Institution.
WP5: Cloud Correlation Arpad Szomoru Joint Institute for VLBI in Europe.
Coordinator’s report Huib van Langevelde EXPReS board Utrecht, 30 January, 2008.
NEXPReS Period 3 Overview WP5 Cloud Correlation Arpad Szomoru, JIVE.
NEXPReS Period 3 Overview The hunt for 4Gbps fringes Or, may the fringe be with you Or, nothing like living on the edge Arpad Szomoru, JIVE.
Scenario use cases Szymon Mueller PSNC. Agenda 1.General description of experiment use case. 2.Detailed description of use cases: 1.Preparation for observation.
CHAPTER 3 Router CLI Command Line Interface. Router User Interface User and privileged modes User mode --Typical tasks include those that check the router.
EXPReS FABRIC meeting at Poznan, Poland1 EXPReS FABRIC WP 2.2 Correlator Engine Meeting Poznan Poland JIVE, Ruud Oerlemans.
WP7: Computation in a shared infrastructure Mark Kettenis JIVE Presented by Norbert Meyer PSNC.
EVN Amplitude Calibration Iván Agudo. Quality of Calibration EVN Amplitude Calibration, Iván Agudo (JIVE) EVN TOG Meeting, Cagliari, Italy,
The UniBoard a RadioNet FP7 Joint Research Activity Arpad Szomoru, JIVE.
Title FABRIC Progress - Mark, Huib etc. T. Charles Yun Project Manager EXPReS/JIVE.
NEXPReS WP5 - Cloud Correlation Work Package Overview Arpad Szomoru JIVE.
DESKALERTS. INTERNAL COMMUNICATIONS | | DeskAlerts Enterprise Edition Features.
What is FABRIC? Future Arrays of Broadband Radio-telescopes on Internet Computing Huib Jan van Langevelde, JIVE Dwingeloo.
SA1: Production e-VLBI service Previous 12 Month Overview Arpad Szomoru JIVE EXPReS is made possible through the support of the European Commission (DG-INFSO),
SA1: Production e-VLBI service Period 2 Overview Arpad Szomoru JIVE EXPReS is made possible through the support of the European Commission (DG-INFSO),
TOG, Dwingeloo, March 2006, A. Szomoru, JIVE Status of JIVE Arpad Szomoru.
SA1: technical progress
SA1: overview, first results
Technical Operations and R&D at JIVE
EXPReS, NEXPReS, UniBoard
RadioNet FP7 Joint Research Activity
The UniBoard Generic Hardware for Radio Astronomy Signal Processing
The UniBoard A RadioNet FP7 Joint Research Activity, 9 partners
e-EVN: practical considerations
SA1: third year overview
UNIBOARD : VLBI APPLICATION CHARACTERIZATION
The e-EVN Arpad Szomoru, JIVE.
Presentation transcript:

TOG, Torun, April 2009 Arpad Szomoru, JIVE EVN/JIVE Technical developments

TOG, Torun, April 2009 Mark5 status at JIVE Mark5A Upgrade of hardware (motherboards, memory, power supplies) completed, some 10 G cards Debian Etch on most units Mark5A+ Upgrade of Mark5A, enables play-back of Mark5B data on Mark5A units Used at JIVE with Yebes, Effelsberg and Westerbork TADUmax data, occasionally QUASAR, Ventspills And on converted Australian LBADR data Mark5B On and off several units converted from A to B at JIVE (depending on production correlation needs) Function well, but very little actual data to play back...

TOG, Torun, April 2009 Mark5B (e-)issues Mark5A+: works fine with MarkB e- and non-e-VLBI data Demonstrated in several demos Wb now only uses Mark5B for e-VLBI, Ef currently not First e-fringes with Ys (on B) recently Mark5B, disk-based: Software development done Playback is being verified now Mark5B, e-based: Sending side: JIVE-developed code works fine Domino: e-VLBI enabled, no fringes yet, need test time/data, need buffer in A to check A-B fringes Not a reason not to go ahead with upgrade to B....

TOG, Torun, April 2009 Network status Internal network upgrade to 10 Gbps Full 1024 Mbps been used operationally Wb: two lightpaths, channel bonding Ef and On: 10 and 4 Gbps connections for e- LOFAR Jb: 2 lightpaths already available Tr: 10-G to Poznan, to Amsterdam via regular switched GEANT network Merlincast regularly used in science operations

TOG, Torun, April 2009 and beyond Europe Long distance connections Ar, Sh regularly at 512 Mbps But time restrictions for high bandwidth transfer Hh: repairs/replacement? Tc: fringes as well, but limitation of S-American network not likely to improve soon Oz: still one lightpath in place Kashima, Urumqi in IYA demo, VERA and KASI next? ToO requesting ultra-long baselines..

TOG, Torun, April 2009 New modes, feedback and streamlining Currently under development: Fast/adaptive (re-)scheduling Tested with Tr, Wb and Jb No further development? On-the-fly fringe fitting: operational Real-time station-log processing, display of Tsys, status information Need installation of simple script at stations Uses copy of log file on local Mark5

TOG, Torun, April 2009 New modes, feedback and streamlining (2) Atom/RSS scheduler: Incoming and outgoing schedules hosted on vlbeer, filed by year and month Schedules approved and moved to.latest subdirectory Atom (RSS) publishing protocol used to publish notification of new schedules Stations and other interested parties alerted via RSS subscriptions Atom publishing protocol allows for modification of documents, and notification of this What would stay the same: Schedules should still be hosted on vlbeer Full schedules must still be fetched from vlbeer (Atom documents to include only summary and li nk to vlbeer) Authorisation of schedules still performed by EVN notification could still be sent Stations could at their own convenience integrate RSS readers into their schedule maintenance str ategy

TOG, Torun, April 2009 SCARIe / FABRIC Software correlator developments Excellent agreement with hardware correlator results Possibility to create FITS files Optimization efforts continue: performance now comparable to DIFX Data directly from Mark5 disk packs (through FUSE) Collaboration with AUTOBahn project (bandwidth-on-demand) led to several successful demos (GLIF08, SC08) Grid-based correlation to be tested in next months Will serve as platform for 4 Gbps correlation at JIVE First image...

TOG, Torun, April 2009 The UniBoard JRA in RadioNet FP7, started Jan 2009, first prototype end 2009 Funded by EC to ~800k€, comparable matching Collaboration of 7 international partners FPGA-based computing platform, different applications: Next generation EVN correlator APERTIF beamformer APERTIF correlator Digital receiver Pulsar binning machine (EPTA) Validation platform broadband digitization Low frequency resolution correlator Next gen. IRAM demonstrator correlator Solar interferometer Next gen. Korean e-VLBI correlator Next gen. Chinese e-VLBI correlator prepSKA correlator effort

TOG, Torun, April 2009 Please use our wonderful tools....

TOG, Torun, April 2009 The International Year of Astronomy The mother of all demos (MOAD) during opening ceremony of IYA, January 2009 in Paris Two 8-hour runs during 100 hours of astronomy in April