STI Proprietary1 St. Louis, MO September 21 st, 2004 AmpLink Rx 1900e GSM Field Trial.

Slides:



Advertisements
Similar presentations
ESTeem RF Design Tools SECTION 4 - RF System Design.
Advertisements

An ISO 9001 certified We offer our services to a wide range of networks such as GSM, CDMA and UMTS networks We Sells SPY Cams & security Cameras We have.
Creating a Schedule Using Network Diagrams; Defining Task Durations
Agenda Super-Cells Multi-Cells
Altai Super WiFi Training WiFi Network Planning
GSM-R Applications in Turkey's High Speed Train Lines Nuri Hakan Ekmekci TCDD, Etude, Project and Investment Department Electrification and Signalization.
Florida Institute of technologies ECE 5221 Personal Communication Systems Prepared by: Dr. Ivica Kostanic Lecture 7: Example of link budgets and coverage.
Cell id GVHD : Hà Duyên Trung Sv thực hiện :Lương Kim Doanh Trần Hoàng Điệp Nguyễn Trung Thành Ngô Quang Thìn.
© Hitachi, Ltd All rights reserved. ICAO ACP WG-S Hitachi Ltd., 2014/3/28 SARPS Validation Discussion material on Web-EX 1 IP01 ACP WG S_28 Mar.
Application Guide For Mesh AP – MAP-3120 How to optimize the backhaul performance? F/W:
1 John Dalsgaard Sørensen 1,2, Jens Nørkær Sørensen 2 & Jørgen Lemming 2 1) Aalborg University, Denmark 2) DTU Wind Energy, Denmark Introduction Risk assessment.
Keweenaw North Waterway Buoy Bob Shuchman: Colin Brooks: Nate Jessee:
Propagation loss models Lab 4 Engr. Mehran Mamonai.
Florida Institute of technologies ECE 5221 Personal Communication Systems Prepared by: Dr. Ivica Kostanic Lecture 5: Example of a macroscopic propagation.
Shashika Biyanwila Research Engineer
Doc.: IEEE /0025r0 Submission Jan 2015 Dynamic Sensitivity Control Roaming Date: 2015-January Authors: Graham Smith, SR TechnologiesSlide 1.
Identifying Performance Bottlenecks in CDNs through TCP-Level Monitoring Peng Sun Minlan Yu, Michael J. Freedman, Jennifer Rexford Princeton University.
08/16/01. Link Budgets for Cellular Networks Presented by Eric Johnson.
08/16/01.
1 OUTLINE Motivation Distributed Measurements Importance Sampling Results Conclusions.
Crowdsourcing Data Collection Nov 2014, Changbo Wen.
RF Drive Test (Testing) Engr. Mehran Mamonai. Introduction Every good RF design, after its implantation should be evaluated. There are few ways to do.
Precision Farming Creating A RTK Network - Overview.
Link Budget Calculation
CEMTREX, INC. MODCON SYSTEMS LTD NIR Systems July 2010.
Lower Snake Modeling and LGR Monitoring Year 1 Report Summary Christopher Cook BPA Project
Sponsored by the National Science Foundation WiMAX Campus deployment Status & measurements Thanasis Korakis Polytechnic Institute of NYU July 27, 2011.
Space Time Processing for Fixed Broadband Wireless A. Paulraj Gigabit Wireless & Stanford University ISART 6 -8 September, 2000 Boulder, CO.
Software Quality Assurance Activities
Lucent Technologies Bell Labs Innovations Lucent Technologies - Proprietary Access to the Global Internet: Which Technology Will Win? Evolution +3G builds.
BEYOND OFDM A Systems Approach to Non-Line-of-Sight Fixed Wireless Rajeev Krishnamoorthy Broadband World Wireless Forum, San Francisco, CA February 19,
LABOR MARKET EVALUATION & COMMUNITY OVERVIEW Thurston County, WA August 2013.
October 5, 2007 By: Richard L. Day, Vice President En Route and Oceanic Services (ATO-E) Federal Aviation Administration Surveillance and Broadcast Services.
How to use the net-monitor (FTD) on Nokia Symbian Phone.
MohammaD AL-Khuffash, Rasool Bani Matar, Raja’y Kelany GSM Network Planning For Nablus City ( Third Phase ) Submitted to: Dr.Jamal Kharosha.
Weekday/Weekend O 3 and PM Differences in Three Cities Outside California CRC Project A-36B Betty K. Pun and Christian Seigneur AER, San Ramon, CA Warren.
Monitoring and Evaluating SES Provider Programs
1© Nokia Siemens Networks Confidential Realities of LTE Deployment Bill Payne Head of Innovation Team CTO Office.
- 0 - KPIs Weekly Report Mobily LTE Date10 /1/ 2013 ReporterCentral MS OPT Team Central _Riyadh_ Cluster 5_LTE.
ECE 4710: Lecture #41 1 Link Budget Example  Hughes Digital Satellite System (DSS)  Brandname is “DirecTV”  More than 220 TV channels  Two broadcast.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt POST LAUNCH TUNING.
X = 3y = 4z = 8 2x Step 1X = 3 Step 22(3) 2 – 6 2 Step 4 2(9) – 6 2Step 3 18 – 12 =6.
Design WLAN Politeknik Telkom Design WLAN Step to design WLAN : 1. Location Survey 2. Topology 3. Distance calculating 4. Antenna design 5. Towering.
1 Mix Model for Executives FMS 200 Series FBP-FMS288A.
2G Vs 3G Drive TEST with tems
Doc.: IEEE /0635r1 Submission May 2014 Dynamic Sensitivity Control Implementation Date: 2014-May Authors: Graham Smith, DSP GroupSlide 1.
Fault Current Indicator (FCI)
TEMS Parameter. Module Objectives On completion of the module one should be clear about the parameters required during drive test what does it mean and.
Validation items and major Conditions
DAS Impact on LTE Network and UE IBTUF VIII Austin TX, Jan-2014
Guide of Genex Assistant for LTE
Performance monitoring framework for the technical infrastructure
Presented by Eman Mahmoud Abeer Thawabi Supervised by Dr. Ahmed Masri
Project hammer Cluster C00200 CA - SSO Celcom CA Project
LRTC 3.4 – 3.8 GHz Ericsson input PT1 XO 29 – 31/
Drive Testing Basics 2013 March
PROJECT BAU MODERNIZATION
Project hammer PC_CA_SWE_07 CA Celcom CA Project
Hauwei hcs in dual band netwrok
WICI Presentation to FLEWUG
“Predictive Mobile Networks”
WLAN network behavior under heavy load
Network-Health Report
Philadelphia CL01 Initial Cluster Report
Shashika Biyanwila Research Engineer
(insert academic year)
Timeline of Events.
GSM Radio Network Optimization. Absolute Radio Frequency Channel Number (ARFCN)  GSM 900 F U (n) = n MHz F D (n) = Fu(n) + 45 MHz Where: 1.
Cellular Systems.
Presentation transcript:

STI Proprietary1 St. Louis, MO September 21 st, 2004 AmpLink Rx 1900e GSM Field Trial

STI Proprietary2 AmpLink Rx 1900e Contents Trial Area and Site Description Trial Timeline of Events AmpLink 1900e – Nokia Interconnect Network Statistics Drive Data Analysis Trial Summary Next Steps...

STI Proprietary3 Trial Area Located in North St. Louis Sub-Urban Morphology Average Cell Radius 1 mile

STI Proprietary4 Trial Area Detailed View Trial Site

STI Proprietary5 Trial Site Details Site Name:MO Site Coordinates: N W Tower Height:~ 130 feet Coax Length:~ 150 feet Coax Size:1 ¼” Diameter

STI Proprietary6 Trial Timeline

STI Proprietary7 Trial Timeline – August 9 th Pre-Meeting and Site walk – August 16 th Installation Week – August 24 th Collect pre-drive data Install Amplink 1900e and pre-stage cables during day Cutover Amplink 1900e during Maintenance Hours – September 8 th Collect post-drive data, (same day same time as Pre Drive) – September 21 st Analysis Completed and Presented

STI Proprietary8 Amplink 1900e Integration

STI Proprietary9 Amplink 1900e Integration

STI Proprietary10 Network Statistics

STI Proprietary11 Statistic collected by Operator and provided to STI 2 weeks Prior and Post deployment analyzed Weekends INCLUDED in the analysis Labor Day removed from analysis Pre Data:August 11 th to 24 th Post Data:August 25 th to September 8 th * Analysis method determined by Network Operator Network Statistics

STI Proprietary12 MOUs / Drop per Sector The Statistics All Sectors achieved a higher MOU/Drop value with AmpLink 1900e. Alpha and Beta sectors are now above acceptable limit of 153 MOUs/Drop. SectorPrePost Improve ment Alpha % Beta % Gamma %

STI Proprietary13 Drop Calls per Sector SectorPrePost Improve ment Alpha % Beta % Gamma % The Statistics All Sectors indicate an average 50% reduction in the number of Drop Calls.

STI Proprietary14 Uplink Quality per Sector The Statistics Uplink quality / BER on all sectors reduced by 20% with AmpLink 1900e. SectorPrePost Improve ment Alpha % Beta % Gamma %

STI Proprietary15 Downlink Quality per Sector The Statistics As expected the Downlink quality on all sectors was unchanged by the class-leading low insertion loss of the AmpLink 1900e. SectorPrePost % Change Alpha2.08 0% Beta % Gamma %

STI Proprietary16 Handovers due to Quality per Sector The Statistics HO Qual was improved by 20% on all sectors with AmpLink 1900e. SectorPrePost % Change Alpha % Beta % Gamma %

STI Proprietary17 In-Bound Handover Fails per Sector The Statistics All Sectors achieved a lower IHO Failure rate. SectorPrePost Improve ment Alpha % Beta % Gamma %

STI Proprietary18 Drive Data Analysis

STI Proprietary19 Best Server BCCH Map Before As expected, no change in best server coverage. After

STI Proprietary20 MS TX Power dBm Before Before the Amplink installation, drive data indicates T730 has uplink problems compared to adjacent sites. Amplink’s sensitivity improvement corrects the problem. After

STI Proprietary21 Downlink Coverage Site T730 Only Before As expected, no change in downlink RSSI. After

STI Proprietary22 MS Tx Power dBm Site T730 Only Before Drive data is trimmed above to clearly show the uplink improvement to T730 is in all sectors. Adjacent site data points removed (i.e. Trimmed by Best Server). After

STI Proprietary23 MS Tx Power Improvement Grid Before / After Before and After Drive data is averaged into grids and then compared to calculated the Delta in MS Tx Power. Statistics Before vs. After Delta Improvement Average-10.1 dB Median-12.2 dB

STI Proprietary24 Trial Summary

STI Proprietary25 Trial Summary MOUs/DropOver 60% increase on all sectors # of Drop CallsReduced by 50% Uplink QualityImproved by at least 20% Downlink QualityAs expected, un-changed HO QualReduced by 20% MS Tx PowerLowered by more than 10 dB Amplink 1900e is a Success ! StatisticImprovement