Status Report TOTEM Collaboration Meeting 17-NOVEMBER-2014
Summary Daily non redundant regression tests (PCTOTEM21) are running Daily redundant regression tests (PCTOTEM04 + PCTOTEM05) now are “running” CMS FSM integration is ready for commissioning, new FSM types were prepared to fulfil CMS recommendations of integration New Timing detector excel table was prepared for HV, LV, Temperature, Vacuum and Radmon
Summary (continued) The installation of the network controlled PDU still pending due to low priority was assigned (now we can reset DIGI without power cycling) Termination of the SLC5 support at CERN caused problems with TOTEM DCS SVN (subversion) scripts handling – we can’t automatically submit new versions of the components to the P5 repository Smart protection of detectors (switching OFF HV and LV channels if ERROR appear) before DSS actions is ready for commissioning New TdParameters preliminary panel is ready to show temperature, vacuum and radmon values
WARNING and ERROR LIMITS RP Rp LimitsAction aliaslow critical low warningup warningup criticalunit tot_Rp_*_*Temp oCoC Send WARNING and SMS to gantchev,baechler,jkopal, xpons. Switch OFF corresponding HV and LV channels. For "tot_Rp_*_Vacuum_Pirani" switch OFF corresponding sector. For "Cooling Plant-.Alarms.summary" and "tot_Rp_Cooling_IsOff" switch OFF all Rp. Send ERROR and SMS to gantchev,baechler,jkopal, deile tot_Rp_*_CoolRight* oCoC tot_Rp_*_CoolLeft* oCoC tot_*_Rad*ntc oCoC tot_Rp_*.channel8Calibrated oCoC tot_*_TempAlcove oCoC tot_Rp_*_CoolRight*Calibration oCoC tot_Rp_*_CoolLeft*Calibration oCoC tot_Rp_*_Vacu*Calibration464347mbar tot_Rp_*_Vacu*.gradient umbar/sec tot_Rp_*_DssTemp* oCoC tot_Rp_*_Vacuum_Pirani464347mbar FwCaVPlant..Alarms.summaryTRUE tot_Rp_Cooling_IsOffTRUE
WARNING and ERROR LIMITS T1 tot_T1 LimitsAction aliaslow criticallow warningup warningup criticalunit Send WARNING and SMS to minutoli,erobutti. Switch OFF corresponding HV and LV channels. Send ERROR and SMS to minutoli,erobutti. tot_T1_*_DssTemp* oCoC tot_*_Gas_*InFlow*1278l/h tot_*_Gas_*OutFlow*1278l/h tot_*_Gas_*InputPressure*-246bar tot_*_Gas_*OutPressure* bar tot_*_Gas_*TotalFlow* l/h *Pressure* bar *Flow* l/h tot_T1_*_Fuse*TRUE tot_T1_*_Temp oCoC tot_T1_*_Temp oCoC tot_T1_*_Temp oCoC tot_*_Rad*ntc oCoC
WARNING and ERROR LIMITS T2 tot_T2 LimitsAction aliaslow criticallow warningup warningup criticalunit Send WARNING and SMS to nturini,160907,162474,jkop al, Switch OFF corresponding HV and LV channels. Send ERROR and SMS to nturini,160907,162474,jkopa l, tot_T1_*_DssTemp* oCoC tot_*_Gas_*InFlow*1278l/h tot_*_Gas_*OutFlow*1278l/h tot_*_Gas_*InputPressure*-246bar tot_*_Gas_*OutPressure* bar tot_*_Gas_*TotalFlow* l/h *Pressure* bar *Flow* l/h tot_T2_*_Temp*Hv oCoC tot_T2_*_*Temp* oCoC tot_*_Rad*ntc oCoC
Looking into the future… Validating all our systems and current functionality Integrate new RP (timing detectors) Provide support for RP, T1 and T2 reinstallation Help RP movement tests Commissioning of integration of the our projects and FSM with CMS DCS Commissioning of the our projects for the installed redundancy computers
Pending wishes Magnetic field sensors Improve VME crates integration Improve SMS alarms for not flooding with notifications Improve feedback from DSS An many more things within JIRA
?