Status Report TOTEM Collaboration Meeting 17-NOVEMBER-2014

Slides:



Advertisements
Similar presentations
JCOP FW Update ALICE DCS Workshop 6 th and 7 th October, 2005 Fernando Varela Rodriguez, IT-CO Outline Organization Current status Future work.
Advertisements

DCS workshop 13-14/6/2005G. De Cataldo, CERN-CH and INFN bari1 Common FSM’s updates An exercise to design the standard FSMs for the DCS, the HV and the.
Alarms and interlocks handling in the FSM environment Hypernet 1.The standardization of the FSM state diagram; 2.The FSM error states and their recovering.
1 DCS Installation & commissioning TB 18 May 06 L.Jirden Central DCS Detector DCS Status.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
SPD DCS Status Report Ivan Amos Calì a,b, S.Ceresa a,c, C.Torcato de Matos a a CERN-AIT a CERN-AIT b Università degli studi di Bari b Università degli.
TPC DETECTOR SEGMENTATION OF THE READOUT PLANE LATERAL VIEW OF THE TPC
André Augustinus 16 June 2003 DCS Workshop Safety.
Status Report TOTEM collaboration meetings 24-MAY-2010
Il sistema di HV del sottorivelatore DT S. Braibant, P. Giacomelli, M. Giunta, E. Borsato Bologna, 20/01/2007.
Detector Control System at the GIF++ A. Polini, M. Romano (AIDA+INFN Bologna) on behalf of WP group Gif++ User Meeting 11/07/2014 Outline Status.
1 ALICE Detector Control System (DCS) TDR 28 January 2004 L.Jirdén On behalf of ALICE Controls Coordination (ACC): A.Augustinus, P.Chochula, G. De Cataldo,
Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
David Emschermann DCS Workshop – PI Heidelberg – 22/01/2007 How to power up the TRD David Emschermann Physikalisches Institut Universität Heidelberg updated.
HV for SM surface testing 2 nd Workshop on the Detector Control System for TRD University of Tsukuba Kengo Watanabe.
The ALICE TRD - HVDistribution System A. Markouizos, P. Mantzaridis, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis, M. Vassiliou Athens University ALICE.
1 Integration of the HV Distribution System to the First TRD Super Module P. Mantzaridis, A. Markouizos, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis,
1 CALO DCS power supply status CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  Introduction  Power supply description with hardware.
Saverio MINUTOLITIG meeting, 10 February Report on T1 installation activities and achievements made during this shutdown.
CERN IT Department CH-1211 Genève 23 Switzerland t Some Hints for “Best Practice” Regarding VO Boxes Running Critical Services and Real Use-cases.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL and HCAL.  ECS HV control.
09/12/2009ALICE TOF General meeting 1 Online Controls Andrea Alici INFN and Universtity of Bologna, Bologna, Italy ALICE TOF General Meeting CERN building.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
SMACS Slow Monitor And Control System Developed system for CDF-TOF proposed for Atlas-MDT/RPC.
Web Based Monitoring DT online shifter tutorial Jesús Puerta-Pelayo CIEMAT Muon_Barrel_Workshop_07/July/10.
Development and Performance of the High Voltage Distribution System for the ALICE TRD A. Markouizos, P. Mantzaridis, P. Mitseas, A. Petridis, S. Potirakis,
ATLAS MDT Power Supply DCS Anastasios Iliopoulos 15/08/2006.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
TPC Prototype III TPC module anode HV edge LV module analog digital Cool sensor Gas sensor Shift Expert DCS Ch Skirt.
André Augustinus 10 October 2005 ALICE Detector Control Status Report A. Augustinus, P. Chochula, G. De Cataldo, L. Jirdén, S. Popescu the DCS team, ALICE.
CEDAR PMT Array DCS (Tim). Summary Summary of DCS monitored parameters based on original scheme – Major part of heat dissipation in electronics / PMTs.
Controls EN-ICE Finite States Machines An introduction Marco Boccioli FSM model(s) of detector control 26 th April 2011.
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
ECAL Prototype DCS system using PVSS Günther Dissertori (for Alison Lister) ETHZ
André Augustinus 16 September 2002 PVSS & Framework How to get started.
21/6/2004 Colmar, DCS Work. G. De Cataldo Cern-CH&INFN Ba,I; A. Franco INFN BA,I 1 The candidate STANDARD diagram for the HV FSM in ALICE TO WHAT AND WHY.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
Calo Piquet Training Session - Xvc1 DCS and DSS Cuvée 2015 – RUN2 Xavier Vilasís-Cardona.
Progress report Collaboration meeting 23-SEP-2009
L0 DAQ S.Brisbane. ECS DAQ Basics The ECS is the top level under which sits the DCS and DAQ DCS must be in READY state before trying to use the DAQ system.
IDE DCS development overview Ewa Stanecka, ID Week, CERN
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
DT Shifter Training Infrastructure A. Benvenuti, M.Giunta 07/07/2010.
André Augustinus 21 June 2004 DCS Workshop Follow-up from last workshop.
DCS overview - L.Jirdén1 ALICE ECS/DCS – project overview strategy and status L.Jirden u Organization u DCS system overview u Implementation.
CMS ECAL DCS 10.Oct S.Zelepoukine ICALEPCS CMS ECAL DCS 1 The Detector Control System for the Electromagnetic Calorimeter of the CMS Experiment.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
G. Dissertori ETHZ CMS Electronics ECAL DCS Software Planning G. Dissertori ETHZ
RPC DSS & DCS Action Matrices Review Anton Dimitrov CMS Action Matrix Review 2015, 06.Mar.2015, CERN, Geneva.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
10/09/10FV 1 News and observations from Brussels' meeting.
André Augustinus 18 March 2002 ALICE Detector Controls Requirements.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
1 Top Level of CSC DCS UI 2nd PRIORITY ERRORS 3rd PRIORITY ERRORS LV Primary - MaratonsHV Primary 1 st PRIORITY ERRORS CSC_COOLING CSC_GAS CSC – Any Single.
CLAS12 ECAL PCAL DC FTOF... Region 2 DewPnt Region 3 Region 4 Region 1 Mod 1... Mod 2 HV TEMP LV Hierarchy of Slow Controls: Driven by Finite State Machine.
Pixel Action Matrix C. Newsom July 15, Overview Critical Parameters Initial Discussion – Top 6 critical failures Discussion - Detailed Documentation.
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
CHEP 2010 – TAIPEI Robert Gomez-Reino on behalf of CMS DAQ group.
27SEP2008Calo Running and Operation Monday Meeting - Xvc1 ECS Xavier Vilasis-Cardona.
C. Kiesling, 11th B2GM PXD Session, KEK, March , Slow Control System for the PXD PXD Support Systems & Control UNICOS Standard PVSS User Interface.
Control systems Detector Safety System (DSS) (no action available for an operator) Display of CERN Level 3 alarms and protection of NA62 hardware Detector.
Control systems Detector Safety System (DSS) (no action available for an operator) Display of CERN Level 3 alarms and protection of NA62 hardware Detector.
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

Status Report TOTEM Collaboration Meeting 17-NOVEMBER-2014

Summary Daily non redundant regression tests (PCTOTEM21) are running Daily redundant regression tests (PCTOTEM04 + PCTOTEM05) now are “running” CMS FSM integration is ready for commissioning, new FSM types were prepared to fulfil CMS recommendations of integration New Timing detector excel table was prepared for HV, LV, Temperature, Vacuum and Radmon

Summary (continued) The installation of the network controlled PDU still pending due to low priority was assigned (now we can reset DIGI without power cycling) Termination of the SLC5 support at CERN caused problems with TOTEM DCS SVN (subversion) scripts handling – we can’t automatically submit new versions of the components to the P5 repository Smart protection of detectors (switching OFF HV and LV channels if ERROR appear) before DSS actions is ready for commissioning New TdParameters preliminary panel is ready to show temperature, vacuum and radmon values

WARNING and ERROR LIMITS RP Rp LimitsAction aliaslow critical low warningup warningup criticalunit tot_Rp_*_*Temp oCoC Send WARNING and SMS to gantchev,baechler,jkopal, xpons. Switch OFF corresponding HV and LV channels. For "tot_Rp_*_Vacuum_Pirani" switch OFF corresponding sector. For "Cooling Plant-.Alarms.summary" and "tot_Rp_Cooling_IsOff" switch OFF all Rp. Send ERROR and SMS to gantchev,baechler,jkopal, deile tot_Rp_*_CoolRight* oCoC tot_Rp_*_CoolLeft* oCoC tot_*_Rad*ntc oCoC tot_Rp_*.channel8Calibrated oCoC tot_*_TempAlcove oCoC tot_Rp_*_CoolRight*Calibration oCoC tot_Rp_*_CoolLeft*Calibration oCoC tot_Rp_*_Vacu*Calibration464347mbar tot_Rp_*_Vacu*.gradient umbar/sec tot_Rp_*_DssTemp* oCoC tot_Rp_*_Vacuum_Pirani464347mbar FwCaVPlant..Alarms.summaryTRUE tot_Rp_Cooling_IsOffTRUE

WARNING and ERROR LIMITS T1 tot_T1 LimitsAction aliaslow criticallow warningup warningup criticalunit Send WARNING and SMS to minutoli,erobutti. Switch OFF corresponding HV and LV channels. Send ERROR and SMS to minutoli,erobutti. tot_T1_*_DssTemp* oCoC tot_*_Gas_*InFlow*1278l/h tot_*_Gas_*OutFlow*1278l/h tot_*_Gas_*InputPressure*-246bar tot_*_Gas_*OutPressure* bar tot_*_Gas_*TotalFlow* l/h *Pressure* bar *Flow* l/h tot_T1_*_Fuse*TRUE tot_T1_*_Temp oCoC tot_T1_*_Temp oCoC tot_T1_*_Temp oCoC tot_*_Rad*ntc oCoC

WARNING and ERROR LIMITS T2 tot_T2 LimitsAction aliaslow criticallow warningup warningup criticalunit Send WARNING and SMS to nturini,160907,162474,jkop al, Switch OFF corresponding HV and LV channels. Send ERROR and SMS to nturini,160907,162474,jkopa l, tot_T1_*_DssTemp* oCoC tot_*_Gas_*InFlow*1278l/h tot_*_Gas_*OutFlow*1278l/h tot_*_Gas_*InputPressure*-246bar tot_*_Gas_*OutPressure* bar tot_*_Gas_*TotalFlow* l/h *Pressure* bar *Flow* l/h tot_T2_*_Temp*Hv oCoC tot_T2_*_*Temp* oCoC tot_*_Rad*ntc oCoC

Looking into the future… Validating all our systems and current functionality Integrate new RP (timing detectors) Provide support for RP, T1 and T2 reinstallation Help RP movement tests Commissioning of integration of the our projects and FSM with CMS DCS Commissioning of the our projects for the installed redundancy computers

Pending wishes Magnetic field sensors Improve VME crates integration Improve SMS alarms for not flooding with notifications Improve feedback from DSS An many more things within JIRA

?