Brian Drendel May 21, 2010. Stacking Pbars stacked: 3494.39 E10 Time stacking: 159.01 Hr Average stacking rate: 21.98 E10/Hr Uptime Number of pulses.

Slides:



Advertisements
Similar presentations
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Advertisements

Run 2 PMG 2/16/06 - McGinnis Run II PMG Stacking Rapid Response Team Report Dave McGinnis February 16, 2006.
All Experimenters’ Meeting January 09, Accelerator Operation Summary Calendar Week # 51 NuMI Weekly Integrated Intensity 8.81E18 protons BNB Weekly.
The Fermilab Antiproton Source Keith Gollwitzer Antiproton Source Department Accelerator Division Fermilab 3 December 2007.
Paul Derwent 30 Nov 00 1 The Fermilab Accelerator Complex o Series of presentations  Overview of FNAL Accelerator Complex  Antiprotons: Stochastic Cooling.
F UEC - 6 Oct 06 Recent FNAL Collider Operations Ron Moore Fermilab – Tevatron Dept.
F All Experimenters' Mtg - 9 Jun 03 Week in Review: 06/02/03 –06/09/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.
Antiproton Source Capabilities and Issues Keith Gollwitzer & Valeri Lebedev Accelerator Division Fermilab 1.
Storage Rings Group Meeting Steve Werkema 24 March 2010.
Mu2e WBS 2 Accelerator Progress Report Mu2e WGM 6/15/2011 Steve Werkema L2 Manager for the Accelerator Systems.
ANU Shutdown Status AEM meeting Cons Gattuso 7 May 2012.
Brian Drendel June 8, Pulses of 120GeV proton beam, with intensity of ~8E12, from the Main Injector travel through the P1, P2 and AP1 beam lines,
F Antiproton Source Apertures Steve Werkema DOE Tevatron Operations Review March 22, 2006.
What is an Antiproton? Keith Gollwitzer Antiproton Source Department Accelerator Division Fermilab 8 August 2009.
Run II PMG 2/16/06 Martens/Sims 1 Run II Upgrades Status February 2006.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
Antiproton source startup report Bill Ashmanskas Prevault sump water rerouted to Main Ring OTR installation in AP1. (Another OTR will go into.
F All Experimenters' Mtg - 28 Jul 03 Week in Review: 07/21/03 –07/28/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
F 19 August 2002 All Experimenters Meeting Beams Week in Review Continued to work on providing Luminosity L  N p N a /  –Stacking rate –Coalescing efficiency.
F 1 MW Proton Beam for Neutrinos Dave McGinnis AAC Meeting May 10, 2006.
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
Challenges of Dual Harmonic RF Systems ISIS Synchrotron Group John Thomason.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Run II Operational Status and Plans Run II Meeting October 28, 2004 Dave McGinnis.
Director’s Review 5/5/03 Spalding DRAFT RLS 1 Project Planning  Documentation to DOE June 1  DOE Review ~July 22 Documents Summary Project Overview,
Check lists to mouse clicks Automation Session : WAO The Fermi National Accelerator Laboratory is a U.S. Department of Energy (DOE) research laboratory,
Paul Derwent 14 Dec 00 1 Stochastic Cooling Paul Derwent 14 Dec 00
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
All Experimenters' Mtg - Aug. 04, 2003 Week in Review: 07/28/03 –08/03/03 Doug Moehs – FNAL Stores and Operations Summary Standard Plots.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
Accelerator Issues Fermilab Antiproton Experiment Keith Gollwitzer Antiproton Source Department Accelerator Division Fermilab.
Accumulator Stacktail Cooling Paul Derwent December 18, 2015.
F All Experimenters' Mtg - 03 Mar 03 Week in Review: 02/24/03 –03/02/03 Ron Moore – FNAL Store Summary / What went wrong Tev Studies Highlights Tev Ground.
AP2 Line & Debuncher Studies Status Keith Gollwitzer Antiproton Source January 9, 2006 Many people involved with providing the hardware and software that.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
Recent Work Towards Increasing the AP2 & Debuncher Aperture – Keith Gollwitzer – May 9, Recent Work Towards Increasing the AP2 & Debuncher Aperture.
Fermilab Run 2 Accelerator Status and Upgrades
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
Antiproton Acceptance Keith Gollwitzer Dept. of Energy Review March 30, 2005.
Run II PMG 1/19/06 Pushpa Bhat 1 Run II Upgrades Status January 2006 Pushpa Bhat.
ATF hardware status - Orbit Stabilization T.Naito(KEK) ATF2 Project meeting Laboratoire de l'Accélérateur Linéaire (LAL) 1.Orbit oscillation.
What we have now – the Pbar source 1 1/23/2013 J. Morgan.
Proton Plan PMG 2/22/07 E Prebys 1 Proton Plan Status January Eric Prebys.
Status of the Accelerator Complex Keith Gollwitzer Antiproton Source Accelerator Division Fermilab 2009 Fermilab Users’ Meeting.
Users' Mtg - 4 Jun 08 FNAL Accelerator Complex Status Ron Moore Fermilab – AD / Tevatron Dept.
Debuncher Stochastic Cooling Paul Derwent March 3, 2016.
All Experimenters’ Meeting September 23, Accelerator Operation Summary Calendar Week # 38 NuMI Weekly Integrated Intensity 4.57 E18 protons BNB.
F Record luminosities at the Tevatron & Future potentiality Steve Werkema Fermi National Accelerator Laboratory Batavia, Illinois USA Asian Particle Accelerator.
F All Experimenters' Mtg - 24 Feb 03 Week in Review: 02/17/03 –02/23/03 Ron Moore – FNAL Store Summary Failed Tev dipole disassembly Schedule for Week.
F Possible Proton Capabilities at Fermilab Dave McGinnis April 16, 2007.
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
F HCP 2007 Performance and Future of the Tevatron Ron Moore Fermilab - Tevatron Dept. Tevatron overview and performance Antiproton source + Recycler overview.
F All Experimenters' Mtg - 6 Jan 03 Week in Review: 12/30/02 –1/05/03 Ron Moore – FNAL Store Summary – Best week! > 7 pb -1 Machine Studies/Maintenance.
Pbar Production Status & Plans to get to 25mA/hr Keith Gollwitzer Antiproton Source August 31, 2006.
Run II Status Keith Gollwitzer Temple Review July 1, 2003.
Practical experience with the AD Stochastic Cooling Murphy’s Law R. Louwerse.
Muon Department Meeting Jerry Annala Staged Commissioning of Muon Campus 17 December 2015.
Weekly Pbar Report 10/2 → 10/9. Stacking This Week …
Antiproton Acceptance Steve Werkema DOE Review February 24, 2004.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
Weekly Pbar Report 10/26 → 11/2. Stacking This Week …
Cons Gattuso 2/23/10 Status/Changes to Pbar Transfer Program.
Linac Weekly Operational Report May 9 th – May 16 th 2008.
Beam Transport and Storage Rings Design Review November 17, 2010 J. Morgan.
Pre-Meeting Meeting Brian Drendel Accelerator Shift Plot.
Challenges of Dual Harmonic RF Systems
Stores and Operations Summary Standard Plots
SNS Commissioning Mike Plum
Presentation transcript:

Brian Drendel May 21, 2010

Stacking Pbars stacked: E10 Time stacking: Hr Average stacking rate: E10/Hr Uptime Number of pulses while in stacking mode: Number of pulses with beam: Fraction of up pulses was: 94.47% The uptime's effect on the stacking numbers Corrected time stacking: Hr Possible average stacking rate: E10/Hr Could have stacked: E10/Hr Recycler Transfers Pbars sent to the Recycler: E10 Number of transfers : 399 Number of transfer sets: 134 Average Number of transfer per set: 2.98 Time taken to shoot including reverse proton tuneup: Hr Transfer efficiency: 94.43% Other Info Average POT : 8.19 E12 Average production: pbars/E6 protons

A:IBEAM M:TR105B A:STCKRT A:PRDCTN A:EMT3HN A:EMT3VN FriSatSunMonTuWedThFri AVE POT 20.1e12 Stacked 3,494mA 25.7mA A:ISEP1V BRF18 & KRF2 MILLRF M:Q107 & M:Q105I I- communications M:Q105I Deb Mom Notch

A:IBEAM M:TR105B A:STCKRT A:PRDCTN A:EMT3HN A:EMT3VN FriSatSunMonTuWedThFri AVE POT 7.55e12 Stacked 2,160mA Unstacked 2,138mA Best Hr 25.35mA 161mA160mA 96mA Accelerator Startup ARF4 not ramping 86mA 154mA D:IKIK HVPS Pbar Access Booster/MI Access A1S10 Braze DRF1 AC 125mA 100mA Klystron Buncher $2B Studies LRF4 Work Day shift

Unstacked 3,399mA 400 transfers 131 sets 94.8% overall 7am Friday to 7am Friday

OK, for now A3B7 Running only on ARF1-1 until ARF1-2 can be repaired. ARF1 D:EKIK module #2 large timing drifts D:IKIK module #1 small timing drifts Kickers Six SCR firing boards replaced this week (M:Q107, M:Q105i). Bad batch of spares, or problems with supplies? Dynapower SCR Firing Boards Fire protection water leak valued out. No fire protection for AP0 and AP50 Repairs may mean no stacking time (leak by Pbar Transport berm) Fire Protection Occasionally 3 nsec drift in phase DRF1-1

Repair Debuncher Momentum filter #1 Regulator for horizontal band 1 amplifier shows voltage monitor fault. Debuncher Cooling Change gains since running lower power Increase trip limits by 10W per TWT 4-8GHz Momentum Pull thyratron and power supplies out of oil-filled tank for inspection. D:EKIK Timing ARF1-2 troubleshooting and repair RF Drain/Flush dump water system (6 hours) Target air blower maintenance (1 hour) Lens water flow meter replacement (3 hours) Target Station Pbar Dry engine flywheel and cold valve change (4 hours) Cryo

Try running TWTs at increased power levels. (tunnel work 1 st ) Will help determine the usefulness of Core momentum work during long shutdown. Core Momentum Power Test Measure stacktail heating one tank at a time 2-4 hours of greatly reduced stacking Stacktail Transverse Heating Initial Measurements Done Modifications needed to bypass Stacktail Equalizer Bypass Mu2e slow extraction measurements 4 hours of greatly reduced stacking Debuncher Tune/Stop band measurements Reverse Protons on Accumulator Injection Orbit Accumulator Impedance Measurements Anti-hydrogen Experiment foil A50 Halo Measurement