1 The HDM Approach to Multi- Year Programming Christopher R. Bennett University of Auckland Highway and Traffic Consultants Ltd.

Slides:



Advertisements
Similar presentations
Life-Cycle Cost Analysis
Advertisements

1 Luis Rodriguez, P.E. Federal Highway Administration Life Cycle Cost Analysis Virginia Concrete Conference March 6-7, 2014.
December 10, 2014 Highway Maintenance and Preservation Needs WSDOT Can Provide Reliable Long-Term Pavement Estimates, but Accuracy of Bridge Estimates.
Pavement Management Program Overview February 10, 2015 Presented By: Christopher J. Ott, E.I.
Why Pavement Maintenance and Preservation? Sponsored by: Minnesota T 2 Center Presented by: Michael Marti, P.E. SRF Consulting Group, Inc. Dan Wegman,
Pavement Management Keeping Good Roads Good, Making Poor Roads Better.
GASB#34 Asset Management TEAM Transportation Fair Presentation by: Charles J. Nemmers, P.E. Charles J. Nemmers, P.E. October 8, 2004St. Louis, Missouri.
OPTIMIZATION Lecture 24. Optimization Uses sophisticated mathematical modeling techniques for the analysis Multi-step process Provides improved benefit.
Spring INTRODUCTION There exists a lot of methods used for identifying high risk locations or sites that experience more crashes than one would.
CE577_Spring 2007 Pavement Management and Rehabilitation Dr. Fouad Bayomy, PE Professor of Civil Engineering
Life Cycle Cost Analysis
CS 501: Software Engineering
PAVEMENT MANAGEMENT SYSTEMS OVERVIEW Lecture 2. n Provide a historical perspective of the evolution of PMS over the last 20 years n Describe the basic.
PRIORITIZATION.
HDM-4 Calibration. 2 How well the available data represent the real conditions to HDM How well the model’s predictions fit the real behaviour and respond.
HDM-4 Applications. 2 Project Appraisal Project Formulation Maintenance Policy Optimization Road Works Programming Network Strategic Analysis Standards.
Transportation leadership you can trust. presented to the 2009 APTA Rail Conference presented by William Robert Cambridge Systematics, Inc. June 2009 State-of-the-Art.
8 th Road Pavements Forum 17 Nov 2004 SABITA PROJECT: Warrants for upgrading SuperSurf J Lea and P Paige-Green.
1 Ministry of Transport, Public Works and Water Management.
HDM-4 Inputs and Options
MnDOT-ACEC Annual Conference March 5,  Capital planning and programming at MnDOT  Major considerations  A more transparent and collaborative.
Developing a ‘Rapid’ Strategic Land-Use and Transport Policy Model using EMME/2 Marwan AL-Azzawi Senior Transport Planner PDC Consultants, UK Also at Napier.
National Highway Institute Federal Highway Administration
NETWORK LEVEL EXAMPLES OF PMS İNŞ.YÜK. MÜH. VEYSEL ARLI.
Asset Management Strategies: Moving from costs to outcomes Tyrone Toole, ARRB Group Ltd South East Australian Transport Strategy Inc, Ordinary General.
Henry Kerali Lead Transport Specialist The World Bank
PG Funding and Management Strategies Asset Management and task M7 4th meeting Thursday, 19 April 2007 Paris La Défense.
Roads Economic Decision Model (RED) January 2008 Rodrigo Archondo-Callao Senior Highway Engineer, ETWTR The World Bank.
Maintenance & Rehabilitation Strategies Lecture 5.
Network Life Cycle Analysis for Bridge Management Rebecca Curtis, P.E. Michigan Department of Transportation Bridge Management Engineer 2015 Transportation.
Data Palooza Workshop May 9, 2013 Rabinder Bains, FHWA – Office of Policy and Government Affairs.
PAVEMENT MAINTENANCE 1: Part 1: Pavement Preservation Idaho Roads Scholar Program.
Portfolio Committee on Transport 9 th March 2005 SANRAL 2005/2006 BUDGET DOCS_NRA-#
EMME Users’ Group Meeting Recent toll patronage forecasting using EMME 27 May 2011.
Capacity and Service to Road Users Task 05: To optimise the capacity of the road network Mike Wilson, Bristol 27 January 2006.
HDM-4 Institutionalization. 2 HDM is for decision-support tool; not decision- making Institutionalization process should ensure that outcome is:  sustainable,
BLOCK 4 SELECTION OF THE PREFERRED ALTERNATIVE Pavement Data Collection Project evaluation Select feasible alternatives Reconstruction Restoration Recycling.
HDM-4 Calibration Henry Kerali Lead Transport Specialist The World Bank.
Evaluation of Low Volume Roads Rodrigo Archondo-Callao Senior Highway Engineer, ETWTR January 10, 2008 The World Bank.
ECONOMIC EVALUATION. Economic evaluation: what is it?  Economic evaluation is the traditional tool for prioritizing road investment  It provides a monetarised.
1 Asset Management and Multi-Year Programming Christopher R. Bennett University of Auckland Highway and Traffic Consultants Ltd.
The World Road Association Development of HDM-4 Neil Robertson PIARC ISOHDM Project Coordinator.
1 THE HDM-4 TECHNICAL RELATIONSHIPS STUDY Asian Development Bank RETA 5549 Dr. Christopher R. Bennett Team Leader HDM-4 Technical Relationships Study ISOHDM.
HDM-4 Analysis Options The World Bank Christopher R. Bennett Director - Data Collection Ltd.
Pavement Management in Developing Countries Christopher R. Bennett Senior Transport Specialist East Asia Transport Unit
Finnish Road Enterprise HDM-4 TUTORIAL FOR THE 5 TH INTERNATIONAL CONFERENCE ON MANAGING PAVEMENTS Case Study: Network Level Strategy for Paved Roads in.
How safe are our highway structures? Optimised assessment of bridges Aleš Žnidarič Slovenian National Building and Civil Engineering Institute.
Insert the title of your presentation here Presented by Name Here Job Title - Date How can we make London’s transport network resilient to climate change?
Design and Rehabilitation Strategies for Sustainable Concrete Pavements H. Thomas Yu Federal Highway Administration Office of Pavement Technology.
Road Pavements and New Approaches! IPWEA CONFRENCE David Moloney Director Infrastructure - Southern Grampians Shire.
How does dTIMS work?.
Road Investment Decision Framework
Overview of dTIMS Input, Analysis and Reporting HTC INFRASTRUCTURE MANAGEMENT LTD.
The University of Birmingham Role of HDM-4 in Road Management Professor Henry Kerali The University of Birmingham England, UK.
Road Owners and PMS Christopher R. Bennett Senior Transport Specialist East Asia and Pacific Transport The World Bank Washington, D.C.
Deterioration models.
Optimisation Modelling for Roads through an Outsourced Service
City of Abilene Pavement Condition Survey 2017 Results and Discussion
Multi-Year Programming and Predictive Modelling
Introduction and Applications
Principles of Calibrating HDM-4
Paving a Gravel Road Case Study
Unsealed Road Deterioration
Pavement condition index calculation
Introduction and Applications
2018 Pavement Workshop May 23-24, 2018
Optimisation Modelling for Roads through an Outsourced Service
Implementation Challenges
Deterioration models.
NRRA Pavement Workshop 2019
Presentation transcript:

1 The HDM Approach to Multi- Year Programming Christopher R. Bennett University of Auckland Highway and Traffic Consultants Ltd.

2 Definitions Treatment –A maintenance activity e.g. reseal, shape correction Strategy –A treatment and when it is applied, e.g. reseal every 6 years; shape correct at 5 IRI m/km

3 HDM Approach

4

5 HDM - Summary Predicts pavement deterioration Predicts vehicle operating costs Predicts impact of maintenance on pavement condition Determines total transport costs for strategy

6 Example of HDM Analysis

7 Analysis Approaches HDM-III: –‘Life Cycle Cost’ analysis - also called ‘Total Transport Cost’ analysis HDM-4 –‘Life Cycle Cost’ analysis –‘Budget Period’ analysis

8 Life Cycle Costing Adopting higher engineering or maintenance standards reduces user and possible administration costs By considering the total costs over extended periods one can establish investment programme which minimises the total transport costs

9 Life Cycle Cost Analysis Consists of defining a series of strategies Have a ‘do minimum’ strategy e.g. routine maintenance and patching Applied as base case and the merit of different strategies assessed relative to base case Each section analysed over extended period under maintenance strategies

10 LCC Analysis - Disadvantages Can take a long time to run for large networks Optimising over long period difficult –How accurate are the traffic forecasts? –How accurate are the pavement deterioration predictions? –How certain are we that future maintenance will be performed when required?

11 Budget Period Analysis Simplification which uses shorter time period (typically 5 years) Work done in the budget period becomes ‘do something’; deferred until after the budget period ‘do minimum’ Need to account for residual value of investment after budget period and benefits accruing after budget period

12 Budget Period Analysis Benefits

13 BP Analysis - Assumptions Maintenance after budget period will be less effective than during budget period Pavement performance after budget period similar for both alternatives –No need to calculate VOC or deterioration past first year after budget period

14 Hierarchy of Applications Strategic –Macro Level Requirements and Standards Project –Detailed Study of Individual Road Programming –Combining Projects into Rolling Work Programme

15 Network Strategy Analysis... Long term budget forecasts Maintenance Rehabilitation Improvement Development Bridges TOTAL

16 Network Condition Forecasts

17 Analysis Procedure Segment network into homogeneous sections Should use dynamic sections and concurrent transformations

18 Fixed vs Dynamic Sections

19 Concurrent Transformations

20 Analysis Procedure... Define series of strategies For each section: –Predict pavement deterioration and maintenance effects –Predict VOC –Determine TTC

21 Evaluation For each section have costs and benefits for each strategy Combine strategies for network and optimise under budget constraints Review and adjust programme