WMS Meeting- February 13, 2013 Day-Ahead Market (DAM) Analysis of Feb. 6 Ancillary Service Prices ERCOT- Matt Mereness (DAM/CRR Manager) IMM- Dan Jones.

Slides:



Advertisements
Similar presentations
MISO Day 2: A Transmission Users (Marketers) Perspective Leon White August 8, 2007.
Advertisements

Winter 2013/2014 Reliability Solution Including LNG MWHs N. Jonathan Peress Conservation Law Foundation Greg Lander Skipping Stone NEPOOL Markets & Reliability.
Ancillary Services and SCED Jeff Gilbertson Market Analyst Congestion Management Working Group 9/4/2013.
QSE Managers Working Group Meeting Notes 9 April, 2010 Report to WMS 21 April, 2010 David Detelich - Chairperson.
March 13, 2013 Day-Ahead Market (DAM) Clearing Process follow-up from February WMS Matt Mereness, ERCOT Manager DAM & CRR.
DSWG Update to WMS May 17, DSWG Goals Update.
ERCOT Load Forecast Uncertainty V2 August 2, 2006.
Loads Acting as a Resource Relationships with QSEs and LSEs
Utility Regulation March 10, 2011 Raj Addepalli Deputy Director, Electric, Office of Electric,Gas and Water New York State Department of Public Service.
NPRR 336, Authorize ERCOT to Procure Additional RRS During Severe Cold Weather Consideration of Tenaska and Luminant Comments.
FAST Procurement and Pricing May 18, 2015 FAST Workshop 1.
Demand Response in MISO Markets NASUCA Panel on DR November 12, 2012.
John Dumas Director of Wholesale Market Operations ERCOT Operating Reserve Demand Curve.
FAST Procurement and Pricing May 28, 2015 TAC Meeting 1.
ERCOT RMR Deployment and Cost Proposals By: Matt Mereness and Ino Gonzalez.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Requirement Documents November 7, 2006 Sai Moorty MMS Project.
1 Dead Bus Pricing Issue/CRR Performance Issue TAC 3 February, 2010.
1 CRR Credit Policy Task Force Update TPTF July 21, 2008.
Storage Integration – Look Ahead SCED Issues for ETWG CAES Perspectives Brandon Whittle ETWG Storage Workshop.
August 17, 2011 Reliability Deployments Task Force Meeting Updated Analysis of Non-Spin Deployments and RUC John Dumas Director Wholesale Market Operations.
Demand Response Workshop September 15, Definitions are important Demand response –“Changes in electricity usage by end-use customers from their.
Market Evolution Program Day Ahead Market Project How the DSO Calculates Nodal Prices DAMWG October 20, 2003.
PRS - RPRS Task Force Status Summary - August 14, PRS RPRS Task Force Status Summary Prepared for WMS and PRS August 2006.
Review of Proposed Zonal Market Improvements ERCOT Board of Directors Meeting February 17, 2009 Dan L. Jones Potomac Economics Vice President Director,
August 2012 QMWG DAM Clearing Behavior for Fixed Quantity Blocks Carrie Tucker Supervisor, Day-Ahead Market.
PJM©2013www.pjm.com Economic DR participation in energy market ERCOT April 14, 2014 Pete Langbein.
Demand Side Working Group Chairman Slides June 27, 2008 Mary Anne Brelinsky Vice President 1.
Nodal Program Update and SEWG Update COPS 1/11/2011 Jim Galvin.
QMWG – Feb. 26, 2014 Discussion topic: NPRR585 Clarification of Administrative Pricing Requirements for Self-Committed Combined Cycle Combustion Turbines.
2007 ERCOT SOM Report Recommendations Dan L. Jones Vice President Director, ERCOT IMM Potomac Economics ERCOT Wholesale Market Subcommittee Austin, Texas.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
PJM © 2006 The Institute for Regulatory Policy Studies Illinois State University Conference May 12, 2006 Jeff Bladen PJM Interconnection.
Congestion Management and Ramp Rate for Delivering Ancillary Services Resmi Surendran.
Updated Cost/Benefit Analysis for PRR 567 Multi-Part A/S Bidding PRS January Meeting January 19, 2006.
PJM©2013www.pjm.com Demand Side Working Group Loads in SCED Angelo Marcino Real-Time Market Operations – PJM April 14, 2014.
Congestion Management Working Group WMS update 11/7/2012.
EILS Cost Comparison WMS Jan. 28, Background ERCOT procures Emergency Interruptible Load Service three times annually by Contract Period –February-May.
DAM Overview: Processes & Tools in the DAM Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) April 2, 2008.
October 02, 2009 Austin, Texas Quick Start Task Force Meeting 1.
Load Resources Negative RRS Bidding in the Nodal Market Credit Working Group January 30, 2008.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
ERCOT Public 1 Overview of ERCOT Concept Paper on Real-Time Co-optimization of Energy & Ancillary Services & Multi-Interval Real-Time Market.
Programs/Products that ERCOT Does Not Presently Offer ERCOT Demand Side Working Group New DR Product Options Subgroup Jay Zarnikau Frontier Associates.
“Managing the Integration of Energy Storage Technologies” Kenneth Ragsdale ERCOT.
November 27, 2012 NPRR322, Real-Time PTP Option Modeling Implementation Overview.
DAM Self-Commitment Issues & Solutions Shams Siddiqi, Ph.D. (512) March 3, 2008.
DAM Self-Commitment Issues & Solutions, Part 2 Shams Siddiqi, Ph.D. (512) April 21, 2008.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
Analysis of August 13, 2015: ORDC, RRS & PRC Changes Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) November 13, 2015.
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
ERCOT Public 1 AS Demand Curves for Real-Time Co-optimization of Energy & Ancillary Services.
ERCOT Update on Day-Ahead Extract and other PUCT Posting changes DEWG Meeting 10/29/07 Matt Mereness.
ERCOT Monthly Operational Overview (January 2015) ERCOT Public February 15, 2015.
OOMC and Local RPRS Settlement Alignment January 2007 WMS Meeting Ino Gonzalez ERCOT Settlements.
RDTF June 1, Purpose “The effect of the Shadow Price cap for the Power Balance Constraint is to limit the cost calculated by the SCED optimization.
NPRR 520 Resmi Surendran ERCOT. Current CCT Process Annual CCT (ACCT) is run every year to feed the results to Monthly CCT (MCCT) MCCT is run every month.
Day-Ahead Market Discussion/Clarification TPTF April 24, 2006.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Day-Ahead Mini Market Mini Market Walk Through for Day-Ahead.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
July 15, 2011 Reliability Deployments Task Force Meeting ERCOT Studies and Proposal on Reliability Energy Pricing John Dumas Director Wholesale Market.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Update on TPTF Comments on MMS Clarification Notes May 21,
Settlement of Ancillary Service Infeasibility ERCOT QMWG April 15, 2016.
1 February, 2012 QMWG S&B Protocol Clarifications QSE-Requested Decommitment of a DAM Commitment ERCOT Mandy Bauld.
IMM alternate framework for Look-Ahead SCED November 21, 2011.
Lead from the front Texas Nodal 1 Texas Nodal Energy & Market Management System EMS/MMS Projects Requirement Documents November.
Alerts & Reserves. December, Objectives Maintain reliability –Ensure that adequate reserves are available Market Clearing Price of Energy is synchronized.
“Look Ahead SCED” Sai Moorty ERCOT November 28, 2011.
Congestion Management and Ramp Rate for Delivering Ancillary Services
Real-Time Co-optimization of Energy & Ancillary Services
Presentation transcript:

WMS Meeting- February 13, 2013 Day-Ahead Market (DAM) Analysis of Feb. 6 Ancillary Service Prices ERCOT- Matt Mereness (DAM/CRR Manager) IMM- Dan Jones (Director Potomac Economics)

February 13, 2013 February 6, 2013, Hour Ending 1 - Overview On February 5, 2013, DAM published $3,000 prices each for RegUp, RRS, and Non-Spin, for February 6, Hour 1 –An offline non-spin offer at $3,000 was struck for 4.4 MW. –Less Non-Spin was available to the meet the AS requirement in Hour 1 than is typical. –This also set the price for RegUp and RRS (more discussion next) –Energy prices were in normal range While the prices were unusual, our investigation found that the DAM behaved as designed and there was no cause for correction HourRRSRegUpNon-SpinRegDnSys Lambda 1 $ 3, $ 3, $ 3, $ $ $ 4.60 $ 5.58 $ 1.00 $ 9.19 $ $ 4.60 $ 5.12 $ 1.00 $ $ $ 4.60 $ 5.51 $ 1.00 $ $

February 13, 2013 Why did it affect RRS and RegUp? RegUp, RRS, and Online Non-Spin are routinely offered as “linked” to the same capacity – one MW quantity is offered with three different prices for each service, allowing DAM to optimize among the online services. –DAM went near the top of the offer stack to clear Non-Spin –There were Resources that needed to be awarded RRS and/or RegUp in order to meet those AS requirements; however, those same Resources’ linked offers could have also provided Non-Spin with the same capacity and could have otherwise received the high Non-Spin price –Due to this opportunity cost, RRS and RegUp MCPCs are set by the same Non-Spin offer. On the energy side, there was no shortage of energy offers so energy prices were in normal range; 3

February 13, 2013 How does the optimization value AS Offers? When energy prices go up, AS prices are affected due to co- optimization (energy competes with AS), but not vice versa. Objective function for DAM is to maximize bid-based revenues while minimizing offer-based costs. For the AS side, there are no “bid-based revenues”, only an AS requirement as a fixed constraint –The optimization does not take into account the settlement impact on LSEs for high AS prices – not a voluntary purchase with an associated bid –As opposed to the energy side, where bid prices serve to constrain the offers 4

February 13, 2013 How does the optimization value AS Offers? (cont’d) The “offer-based cost” of the Non-Spin was only ~$13k since it was a small number of MWs procured from the $3k offer. –There were online Non-Spin offers much less than $3,000 that were not struck. For example, say a resource had $6,000 startup cost, $35 min energy offer, $3/MW online Non-Spin offer, and a min run time of 4 hours. The cost of starting up this hypothetical Resource to access the relatively low-priced offer to provide online Non-Spin in one hour, then having to keep it on uneconomically for hours, is >$13k. Recall that online Non-Spin awards are a daily commitment decision, rather than a simple marginal dispatch –Also offered as a reference, the total objective function for this DAM was $339million, with a MIP gap of $112k, where the MIP gap represents the area wherein multiple possible solutions that meet the constraint set become equivalent to the DAM engine 5

February 13, 2013 Why was less Non-Spin available? A portion of the offered Non-Spin capacity for Operating Day 2/6/13 was unavailable for award due to temporal constraints in the DAM –Resources will not be awarded in hours where temporal constraints are violated (e.g., min offline time, max online time, min online time). Reminder that DAM utilizes current day COP status at time of DAM Close to determine all Resource initial conditions for the next Operating Day. Thus the final hours of the current day COP affect the transition into the study period and the availability to the DAM optimization for the first hours of the Operating Day. 6