AAE 450 Spring 2010 AAE 450 2/11/2010 Kathy Brumbaugh 612-860-2465 Chris Spreen 610-888-9521

Slides:



Advertisements
Similar presentations
Unit 3, Chapter 9, Lesson 9: Space Systems Engineering 1 The Systems-engineering Process Trading Requirements We use the requirements loopa necessary and.
Advertisements

Lecture 10: Configurations Jason Mickey For AE 440 A/C Lecture September 2009.
Larry Phillips MAY 13th-17th, 2002 Micro Arcsecond Xray Imaging Mission: Pathfinder (MAXIM-PF) Launch Vehicle Information Final Version.
Presented by Marco Christov at the 11th Mars Society Annual Convention, 14 – 17 August 2008, Boulder Colorado. A Mars Heavy Transport.
Architecture Team Industry Day Briefing 17 January, 2002.
Understanding the Systems Engineering Process
1 Air Launch System Project Proposal February 11, 2008 Dan Poniatowski (Team Lead) Matt Campbell Dan Cipera Pierre Dumas Boris Kaganovich Jason LaDoucer.
Aug.19, 1999 George T. Roach Integration Mission Design Center NASA- GSFC Code 543 Greenbelt, MD FAX
Delta II –7920 Fitup Study Model TMA-56 f10 optics In-Line configuration Delta II Launch Vehicle 7920 H 10L Composite Fairing.
Design Goals Saturn V Ariane 4 Pegasus Vanguard Bellerophon ? ? ?
Minimalist Human Mars Mission Surface infrastructure discussion July 26 th, 2008.
AAE450 Spring 2009 Propellant Choice and Mass Estimates for the Translunar OTV Week 2 Presentation Thursday, Jan 22, 2009 Brad Appel Propulsion Group.
AAE450 Spring 2009 Final Presentation Draft Slides Description: Some draft slides and ideas 3/26/09 Kris Ezra Attitude 1.
The Lander is at a 25 km Lunar altitude and an orbital period of approximately 110 minutes. After separation occurs the Lander is completely self sufficient.
AAE450 Spring 2009 Analysis of Trans-Lunar Spiral Trajectory [Levi Brown] [Mission Ops] February 12,
AAE450 Spring 2009 Final Sizing and Trajectory Design for 100 g/10kg Payloads [Levi Brown] [Mission Ops] March 12,
AAE450 Spring 2009 Project X pedition Final slides outline for Orbital Transfer Vehicle Propulsion Week 11 Presentation Thursday, March 26, 2009 Brad Appel.
AAE450 Spring 2009 Lunar Descent Final Numbers Josh Lukasak Attitude Group Lead Lunar Decent Phase Lead 03/12/09 [Josh Lukasak] [Attitude] (1)
AAE450 Spring 2009 Translunar Orbit Transfer Vehicle (OTV): Propulsion System Setup for 100g & 10 kg Case Launch Vehicle Selection for Arbitrary Case Thermal.
AAE450 Spring 2009 Descent Trajectory Hover Trajectory LD Code Integration John Aitchison March 5 th, 2009 [John Aitchison] [Mission Ops]
AAE450 Spring 2009 Hopper Design Alternative Josh Lukasak Attitude Group Lead Lunar Decent Phase Lead 02/26/09 [Josh Lukasak] [Attitude] (1)
Choices: Some Considerations in Configuring Launch Systems Dr. John M. Jurist Adjunct Professor of Space Studies, Odegard School of Aerospace Sciences,
Spacecraft Design and Sizing Dr Andrew Ketsdever MAE 5595 Lesson 14.
AAE 450 Spring 2008 Justin M. Rhodes Avionics – Telecommunications Webmaster Telecommunications and Wiring.
NS5 Work Orders How to Create a Work Order for an Unplanned Event.
Aerospace Engineering By Patrick Ferrell. Aerospace Engineering is the main branch of engineering concerned with the research, design, development, construction,
The James Webb Space Telescope. Introduction The James Webb Space Telescope  The James Webb Space Telescope, also called Webb or JWST, is a large, space-based.
1 AAE 450 Spring 2008 Stephen Bluestone March 20, 2008 Propulsion Final Presentation Slides 1.
Jet Propulsion Laboratory California Institute of Technology National Aeronautics and Space Administration National Aeronautics and Space Administration.
The Pursuit for Efficient S/C Design The Stanford Small Sat Challenge: –Learn system engineering processes –Design, build, test, and fly a CubeSat project.
 The word "rocket" can mean different things. Most people think of a tall, thin, round vehicle. They think of a rocket that launches into space. "Rocket"
1 Project Name Solar Sail Project Proposal February 7, 2007 Megan Williams (Team Lead) Eric Blake Jon Braam Raymond Haremza Michael Hiti Kory Jenkins Daniel.
AAE 450 Spring 2008 Stephanie Morris 3/27/08 Propulsion Final Slides.
Titan Mariner Spacecraft Study Titan Team! IPPW-5 June 24, 2007.
© Lavochkin Association, 2013 Ganymede Lander mission overview.
Team PM8 Eventus Slide 1. Commercial spaceflight has seen increased activity as more privately owned companies invest in the venture. To avoid a catastrophic.
Space Engineering 2 © Dr. X Wu, Space Engineering 2 Lecture 1.
Structures and Mechanisms Subsystems AERSP 401A. Introduction to Structural Estimation Primary Structure: load-bearing structure of the spacecraft Secondary.
AAE450 Spring 2009 Support structure for Orbital Transfer Vehicle (OTV) Tim Rebold STRC [Tim Rebold] [STRC] [1]
STRATEGIES FOR MARS NETWORK MISSIONS VIA AN ALTERNATIVE ENTRY, DESCENT, AND LANDING ARCHITECTURE 10 TH INTERNATIONAL PLANETARY PROBE WORKSHOP June,
Minimalist Mars Mission Establishing a Human Toehold on the Red Planet Executive Summary DevelopSpace MinMars Team.
Mars Today 1 An immediate and inexpensive program for manned Mars visitation.
Introduction to the Altair Project
1 AAE 450 Spring 2008 Jerald A. Balta February 21, 2008 Propulsion Team / Cad Cost Modifier – Launch Site.
A&AE 450 – Senior Design Jeremy Davis Group A – Aerodynamics Preliminary Design Analysis January 23, 2001.
LEO Propellant Depot: A Commercial Opportunity? LEAG Private Sector Involvement October 1 - 5, 2007 Houston, Texas LEAG Private Sector Involvement October.
Review of Past and Proposed Mars EDL Systems. Past and Proposed Mars EDL Systems MinMars Mars entry body design is derived from JPL Austere Mars entry.
Flight Investigations TEXT BOOK CHAPTER 16 PAGE
AAE 450 Spring 2008 Stephanie Morris 3/6/08 Propulsion Final Propellant and Pressurant Cost Thanks to Nicole Wilcox!
Pawel Swica1 Entry/Integration Hours Worked: Team Member Pawel Swica.
ACE Science Workshop March 10 th, 2009 Armin T. Ellis, Deborah Vane, Mark Rokey Jet Propulsion Laboratory.
Micro Arcsecond X-ray Imaging Mission Pathfinder (MAXIM-PF) Mechanical George Roach Dave Peters 17 May 2002 “Technological progress is like an axe in the.
Wayfarer Ryan Stelzer Dr. David Gaylor April 16 th, 2016 Arizona Space Grant Symposium.
An Earth – Moon Transportation System Patrick Zeitouni Space Technology.
The Principles of Space Instrument Design Lauren Shea Based on research completed at MSSL Alton Convent School.
AAE 450 Spring 2010 AAE 450 2/25/2010 Kathy Brumbaugh Chris Spreen
AAE 450 Spring 2010 AAE 450 3/11/2010 Kathy Brumbaugh Chris Spreen
AAE 450 1/14/2010 Kathy Brumbaugh Chris Spreen AAE 450 Spring 2010.
AAE 450 3/30/2010 Kathy Brumbaugh Chris Spreen AAE 450 Spring 2010.
Technical Resource Allocations
Overview of the System Accommodation and Mission Design for a Fission Powered Titan Saturn System Mission (TSSM) Robert L. Cataldo1, Steve R. Oleson1,
COEUS UAV for Titan Brandon Adams Alex Hart Logan Sailer Ben Veenema.
Attitude, Lunar Transfer Phase
Matthew Prevallet 4/26/16 Arizona/NASA Space Grant Symposium
[Solomon Westerman] [PM]
Introduction to the Altair Project
[Solomon Westerman] [PM]
Team A Propulsion 1/16/01.
AAE 450 3/25/2010 Kathy Brumbaugh Chris Spreen AAE 450 Spring 2010.
Stephan Shurn 20 March 2008 Propulsion Final Slides Rail Guns and LITVC AAE 450 Spring 2008.
Presentation transcript:

AAE 450 Spring 2010 AAE 450 2/11/2010 Kathy Brumbaugh Chris Spreen

AAE 450 Spring 2010

Agenda AAE 450 Spring 2010 TimeTask 9:30am-9:55amPeer Review 1 9:55am-10:10amPDR Presentation 10:10am-10:15amReminders & Concerns

AAE 450 Spring 2010 Project timeline

AAE 450 Spring 2010

Design Stages - Description StageDescription Mission Design Requirements (MDR) Identification of all subsystems for each group’s tasks. Tasks and steps that need to be accomplished for the subsystems identified Preliminary Design Review (PDR) Exploring all the options for each aspect of the design Generating numbers for each option Communicating these numbers between groups **At end of PDR => Mission architecture possibilities have been identified. Critical Design Review (CDR) Project Managers and Group Leaders will meet to discuss all options and make decision based upon group input and calculations. Choose one option for each aspect of the design (ex. Lake Lander = sub or boat) Investigate and generate numbers for options on that design aspect (ex. What type of propulsion for the Lake Lander?) Work numbers in great detail Communicate between groups with detailed analysis and numbers for each option **At end of CDR => Mission architecture is chosen (ex. Specific engines, propellants, launch vehicle and numbers, fly-by or no fly-by, lake lander & airship configuration) Final Design Review (FDR) Project Managers and Group Leaders meet to incorporate all group discussions into choosing the best overall design including specifics for each category and aspect. Numbers and analysis are now completed in great detail. AAE 450 Spring 2010 Project Managers

Preliminary Design Review  Launch Vehicle = Atlas V Heavy  Launch configuration = all together  Titan Entry configuration = all together  Airship = Blimp  Lake Lander = Floater – raft/pontoon  Option for Ballute w/ Orbiter+Airship+Lake Lander configuration AAE 450 Spring 2010

Launch Vehicle Atlas V HLV  29400kg to LEO(185k m, 28.5deg)  21918kg remaining for 3 rd stage Group Name (i.e.Trajectory Optimization) Source: e/img_lau/atlas-5- hlv__1.jpg e/img_lau/atlas-5- hlv__1.jpg Source: ages/content/161979m ain_dIVhpad.jpg ages/content/161979m ain_dIVhpad.jpg Delta IV Heavy  22977kg to 407km, 28.7deg  15495kg remaining for 3 rd stage  Payload increase for lower orbit

Choices & Other Considerations Atlas V best option  2 nd stage engine has more flights  Has lower acceptable frequency – less s/c structure (Andrew), easier to attach 3 rd stage Group Name (i.e.Trajectory Optimization) AAE 450 Spring rd staging  P&W RL-10 engines  With current payload mass estimates, possible to reach v- inf of 4.7km/s with Atlas V HLV and a sized 3 rd stage

AAE 450 Spring 2010 Collin Morgan Launch Configurations  Single Launch –Pros Allows all vehicles to reach Titan together (good if using ballute) –Cons Payload mass too large to reach required trajectory with only two stages –Propellant mass: kg  Multiple Launches (Launch orbiter separately) –Pros Reduces amount of propellant (per vehicle) to leave LEO Requires only two stages –Cons Cost Unable to have vehicles enter Titan together –Propellant mass: 8785 kg, 7275 kg

Entry Configurations  All three vehicles together –Pros Most efficient way to utilize ballute Very little increase in mass for material and structure of airship (7 kg) –Cons Larger heat shield Possibly more demand on airship propulsion system  Separate Entry –Pros Airship not required to carry lake lander (saves approx. 110 kg from airship propulsion system) Less heat shield mass (only if ballute is not used) –Cons Unable to efficiently utilize ballute AAE 450 Spring 2010 Collin Morgan

Selections  Single Launch –Now must design third stage –Mass of third stage must be less than 20,000 kg  Single Entry –Benefits aerocapture maneuver with ballute and reduces total mass AAE 450 Spring 2010 Collin Morgan

AAE 450 Spring 2010 Adam Coulon Airship Vehicle Options  Hot Air Balloon –Standard Balloon Shape –Science Payload Stored beneath  Hybrid Ballon/Blimp –The Shape of a Blimp –Maintained like a Balloon  UAV type aircraft –Aircraft Design –Must Maintain Flight for 6 th Months

Hybrid Blimp/Balloon  Shaped like a blimp, but maintained like a hot air balloon  ASRG would heat incoming air which would be blown into the envelope  Equipment would be stored below  Considering a ducted fan for propulsion  Controlled mainly by control surfaces and not ballast adjustments Currently Working On… Time required to inflate and become able to fly freely Finalizing overall masses/power/dimensions Detailed design for CAD modeling Finalizing performance capabilities AAE 450 Spring 2010 Adam Coulon

Lake Lander Vehicle Choice  Floater Configuration of Pontoon/Raft Qualities –Failure Contingency –Compartmentalized Structure –Communications Availability –Undesirable Submersible Features Complex Ballast Control Autonomous Subsurface Vehicle Navigation Propulsive Failure AAE 450 Spring 2010 Brandon Kan

Next Objectives  Attitude Controls – Surface stability and probe control  Power – Electric and Thermal Power Output, Budgeting  Propulsion – Distance and Time Requirements  Hydrodynamics – Drag and Shape  Communication – Antenna Size, Storage, Location  Structures – Winch system, Hull and Spars  Trajectory – Airship and Lake Lander combined drop, reduced entry and descent complexities  Science – Probe design AAE 450 Spring 2010 Brandon Kan

Reminders & Concerns  Subgroup spreadsheet – UPDATE! PMW1nRzRrZ0E&hl=en  Presentation feedback: –Buffer/Margin = 20% (Detail numbers before and after including this margin) –Include your past weeks’ research on the title slide –Consider the end of the mission => what does that mean for your portion of the project? –If want to know what to work on…read feedback! Ask PM, GLs. –Make conclusions/recommendations –Use updated numbers (spreadsheet) – response is CRUCIAL! –USE OUR RESOURCES!!! –Ballute analysis; Aerocapture simulation (simulations in general)  Additional tasks – who needs more to do?  Section 1 – Critical Design slides due Sun. 5pm AAE 450 Spring 2010