OS 2015: Information Memorandum Proposal by TSOs 11th SG meeting

Slides:



Advertisements
Similar presentations
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Advertisements

Madrid, 29 th January th RCC Meeting South Gas Regional Initiative.
1 Madrid, 2 nd Nov th IG Meeting South Gas Regional Initiative VI. MIBGAS.
Open seasons in European Markets: Overview and initial lessons learned Dominique Jamme ERGEGs Gas Focus Group (GFG) XIV Madrid Forum, May 2008.
Madrid, 13 th November th SG Meeting South Gas Regional Initiative.
Paris, 14 th December th IG Meeting South Gas Regional Initiative.
VOORBLAD.
8 th IG-Meeting Coordinated Auctioning, Auction Office and Organisational Issues Christian Todem Vienna
15 November th SG meeting Enagás and REN Coordinated implementation of the Network Code on Capacity Allocation Mechanisms.
15 th September 2013 Enagás and TIGF Information to NRAs.
Madrid, 27 th October th IG Meeting South Gas Regional Initiative.
Madrid, 17 th February th IG Meeting South Gas Regional Initiative.
CMP PROPOSAL FOR HARMONISATION 17 th IG meeting Madrid 2 nd November 2011.
Lessons from open seasons between France and Spain Regulator’s perspective Benoît Esnault Commission de Régulation de l’Energie (CRE) North West region.
Madrid, September 23 rd th SG Meeting South Gas Regional Initiative Open Season for future capacity.
1 Open Season Development of new capacities between France and Luxembourg NW-GRI, September - 21 st, 2010.
Madrid, 6th February nd SG Meeting South Gas Regional Initiative.
Madrid, 7 th February th SG Meeting South Gas Regional Initiative.
9th SG Meeting South Gas Regional Initiative 15th July 2009, Madrid.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
25 seconds left…...
26 th IG meeting 23 th January 2014 Enagás, REN and TIGF Issues to be discussed.
15 November th SG meeting Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms.
Update Transparency project RCC The Hague, 12 May 2011 Konrad Keyserlingk - Ofgem -
1 Madrid, 27 th February st IG Meeting South Gas Regional Initiative.
PILOT PROJECT FOR CAM HARMONISATION 16 th SG meeting Madrid 31 st May 2012.
Allocation of capacities between Portugal and Spain Madrid 30 th April 2013.
1 Madrid, 07 th February th SG Meeting South Gas Regional Initiative.
Calendario 2008 MON TUE WED THU FRI SAT SUN January.
Weekly Attendance by Class w/e 6 th September 2013.
7 th IG meeting, South Gas Regional Initiative Madrid, 10 th July 2008 Consultation on Requirements for Gas Interconnection Capacity between Spain and.
Madrid 15 th July 2009 OS for the development of new gas interconnection capacity between Spain and France after th SG meeting.
Paris, 16 th March th SG Meeting South Gas Regional Initiative.
French transport structure SG meeting Madrid – 15 July 2009.
Madrid, April 1 st th SG Meeting South Gas Regional Initiative Working Group 4B : Open Seasons.
PROPOSAL CAM PROPOSAL FOR HARMONISATION 14 th SG meeting Madrid 11 th July 2011.
OS 2015: next steps Proposals and agreements by TSOs 12 th IG meeting Paris 14 th December 2009.
Madrid, 27 October 2009 South Gas Regional Initiative Open Season France-Spain Validation of the results.
Madrid, 7 th May th SG Meeting South Gas Regional Initiative.
CMP PROPOSAL FOR HARMONISATION 16 th IG meeting Madrid 6 th May 2011.
1 Open season th IG Meeting 26 th March 2010 Paris.
Madrid, 15th June rd SG Meeting South Gas Regional Initiative.
10 th SG meeting Madrid 13 th November Index Capacities – Results Capacities – Further steps Capacities – Further steps.
6th Stakeholder Group Meeting Stockholm - 26 November, 2009 Gas Regional Initiative – North West Region Experience with coordinated o pen seasons Dominique.
Gas Regional Initiative Region North-West Transparency Project Nicola Meheran, Ofgem.
25 th IG meeting 13 th December 2013 Enagás, REN and TIGF Issues to be discussed.
Madrid, 1 st April 2008 Proposal for the commercialisation of existing and committed capacity at the cross border point of Larrau between France and Spain.
Madrid, May 21 st th SG Meeting South Gas Regional Initiative Working Group 4B: Open Seasons.
OS 2015: Information Memorandum Draft proposal 12 th SG meeting Madrid 7 th May 2010.
Madrid 15 th June 2009 OS Agreement to Reserve Capacity 10 th IG meeting.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
OS 2015: Allocation Rules Proposal by TSOs 11 th SG meeting Paris 16 th March 2010.
Madrid, 15th June rd SG Meeting South Gas Regional Initiative TSOs’ report 2013/2015 – Main Findings.
Madrid 24 th March 2009 OS Working Progress 9 th IG meeting.
GRTgaz North  South Link Capacities Sales Organization Considering Future France – Spain Developments 5 th SG meeting of S-GRI in Madrid.
1 CRE proposal on how to allocate capacity according to the Joint Enagas, TIGF and GRTgaz investment plans: points that have been agreed / still need to.
CMP PROPOSAL FOR HARMONISATION Madrid 11 th July 2011.
Madrid 16 th February 2009 TSOs presentation 8 th IG meeting.
Madrid, 23rd Sep th SG Meeting South Gas Regional Initiative OSP and Interoperability.
Enagás and REN Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
25th IG meeting 13th December 2013
Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
26th IG meeting 23th January 2014
Results of the First Phase of the OS 11th IG meeting
26th February 2015 Teleconference
Presentation transcript:

OS 2015: Information Memorandum Proposal by TSOs 11th SG meeting Updated version (31/03/2010) with revised capacities Paris 16th March 2010

Index Introduction Capacities Infrastructures Schedule Requirements to participate Contact details

1 Introduction

Content of the Info Memo MAIN POINTS INCLUDED IN THE INFO MEMO Background. Capacities (market structure/capacities offered) / infrastructures. Allocation Process. Schedule. Tariff Visibility. Economic Test. Requirements to participate in the OS. Joint Allocation Office. Contact. NRAs 4

2 Capacities

MidCat and Biriatou capacities Biriatou capacities to be included in the 2nd Phase. Possible development scenarios for MidCat have been studied, maintaining in any case the same technical capacity from South to North (230 GWh/d). All capacity will be jointly offered, and, if the OS is totally successful, all capacity will be developed. However, only MidCat or Biriatou might be developed if the OS is partially successful, according to the result of the Economic Test. This might have implications for coordinated requests, which will be described in the Information Memorandum, since MidCat and Biriatou imply different probabilities of development of the North-South link in France. The possibility to decrease by 10% the amount of capacity reserved for short-term needs at the border has been discussed, in order to increase the probability of passing the Economic Test. Capacity split (80/20 or 90/10) to be clarified by NRAs 6

Capacity reserved for short-term needs in Spain According to Royal Decree 949/2001: “Las empresas transportistas destinarán a contratos de duración inferior a dos años al menos el 25 % de la suma de las capacidades de sus instalaciones de regasificación, almacenamiento y entrada al sistema de transporte y distribución. Cada comercializador no podrá acceder a más de un 50 % de las capacidades destinadas a este fin. Estos porcentajes podrán ser revisados por el Ministerio de Economía en función de la evolución del mercado.” According to Ministerial Order ITC/2607/2008, from 11th September 2008, which establishes the rules to be applied in the allocation of capacities at interconnection points with France: “La capacidad ofertada se dividirá, para su asignación, en capacidad a largo plazo y capacidad a corto plazo. Con carácter general, en cada convocatoria se determinará el reparto entre capacidad ofertada largo plazo y capacidad ofertada a corto plazo, con el objetivo de que se garantice que un mínimo del 20 por ciento de la capacidad total en el punto de interconexión quede destinada a contratos de capacidad a corto plazo, y teniendo en cuenta la viabilidad económica de las infraestructuras.” Although offering 90% of the capacity under long-term contracts is not in contradiction with Royal Decree 949/2001, it could be in conflict with Ministerial Order ITC/2607/2008. However, such order already takes into account infrastructures viability, and, if the 90/10 split was agreed, it should not be a mayor concern because the Order can be easily modified. 7

Market structure Capacity will be offered under the same market structure included in the 1st Phase, with three balancing zones in France and one in Spain: Although it was agreed to include IP 4 (known as IP H during the non-biding round) in the 2nd Phase, some stakeholders in France claim that such capacity should be allocated on a second round once the allocation at the other IPs (1-2-3-5-6) is known. Inclusion of IP 4 (IP H during the non-binding round) to be clarified by NRAs 8

Aggregated commercial capacities 9

Aggregated commercial capacities 10

Capacities associated to MidCat (full IP5) 11

Capacities associated to MidCat (int. IP5) 12

Capacities associated to Biriatou 13

3 Infrastructures

Infrastructures in France 15

Infrastructures in France 16

Infrastructures in Spain Information on infrastructure development in Spain was provided by Spanish TSOs at the 13th IG meeting: 17

Infrastructures in Spain Additional infrastructures in Spain triggered by the OS: MIDCAT+IRUN MIDCAT IRUN N --> S 240 180 60 290 230 Midcat (Spain) - Figueras-French border - CS Martorell 85 X Biriatou (Spain) - CS Border 35 120 Investment estimates based on Spanish standard unit costs approved by Order ITC/3520/2009 SPAIN's INVESTMENT (M€) Capacity (GWh /d) 18

4 Schedule

Proposed schedule TSOs propose the following schedule to proceed with the Second Phase of the OS (2015 capacities). This calendar is based on the assumption that capacities and infrastructures will be totally agreed by end-April. The proposed schedule has not been agreed with regulators and is presented for discussion.

Proposed schedule MARCH – APRIL 2010: MAY 2010: 16th March: S-GRI SG meeting 31st March: Deadline for comments from stakeholders 7th/12th April: S-GRI IG meeting (final decisions) MAY 2010: 3rd May: Publication of final documents Information Memorandum. Allocation Rules for 2015 capacities. Application forms and related letter of commitment for 2015 capacities. Non-Disclosure Agreements between each TSO and interested subscribers (to be signed only by new participants). Capacity booking contract between each TSO in France and subscribers interested in capacities between GRTgaz South-TIGF and/or TIGF-Spain. Transmission contract between each TSO in Spain and interested subscribers. Before 30th May: Signing of Confidentiality Agreements between each TSO and interested subscribers not participating in the First Phase.

Proposed schedule MAY – JUNE – JULY 2010: JANUARY 2011: SG required?. 10th-12th May: Information meetings for stakeholders organised by TSOs (Spain and France). 17th May/31st May: Starting date for submitting requests in the Second Phase of the OS. 31st May/14th June: Deadline for submitting requests in the Second Phase of the OS. 30th June/8th July: Publication of results of the Second Phase of the OS. 31st July: Deadline for the signing of contracts. JANUARY 2011: 31st January 2011: Approval of GRTgaz and TIGF global investment programs by their respective Boards of Directors. 31st January 2011: Approval of GRTgaz and TIGF global investment programs by CRE.

5 Requirements to participate in the OS

Requirements to participate in the OS NON-DISCLOSURE AGREEMENT Shippers willing to participate in the 2nd Phase of the Open Season must sign and submit the Non-Disclosure Agreement. This is identical to the one published for the 1st Phase. Shippers having already signed and submitted the NDA during the 1st Phase do not need to take any further action, since the NDA is valid. LICENSES In France, shippers are not require to obtain any license in advance in order to participate in the 2nd Phase of Open Season. In Spain, the Service Directive* has already been transposed by Law 25/2009. Article 80 of the Hydrocarbons Law has been modified, and thus, it is not necessary to go through the former authorisation process. However, a communication of the starting of activity, and a declaration that all duties are fulfilled, is still required. CNE / MITyC to clarify whether such communication will be required in advance to participate (this will be clarified in the Info Memo). * Directive 2006/123/EC of 12 December 2006 on services in the internal market 24

6 Joint Allocation Office and Contact details

Joint Allocation Office Applications forms together with the corresponding letter(s) of commitment should be sent to: Joint Allocation Office Enagás, DATR Paseo de los Olmos, 19, 3A 28005 Madrid Espagne/España e-mail: openseason@enagas.es

Contact Any requests for additional information should be sent to: Enagás, S.A. Dirección de Gestión ATR Att. Fernando Impuesto Nogueras Paseo de los Olmos, 19 28005 MADRID SPAIN e-mail: dgia.gestionatr@enagas.es GRTgaz Direction Commerciale Att. Carole Baron 2 rue Curnonsky 75017 PARIS France e-mail: acces-reseau-accueil@grtgaz.com TIGF Direction Developpement Commerce Att. M. MIGLIO 17 chemin de la Plaine 64140 BILLERE France e-mail: maximiliano.miglio@tigf.fr Naturgás Energía Grupo, S.A. Departamento de Regulación Pío Baroja Nº 3 48001 Bilbao, España e-mail: gestionatr@naturgasenergia.com

Thank you for your attention! 28