HISTORY OF SNS DESIGN AND TECHNOLOGY CHOICES PROJECT X WORKSHOP NOVEMBER 12-13, 2007 R. KUSTOM.

Slides:



Advertisements
Similar presentations
Laboratori Nazionali di Legnaro (Italy) DTL design status A. Pisent.
Advertisements

CLIC Energy Stages D. Schulte1 D. Schulte for the CLIC team.
ESS SPOKE LINAC (WP4) Sebastien BOUSSON Guillaume OLRY ESS/SPL Meeting - Lund – 2010/07/01.
Muon Collider 2011 Workshop Jun 27-July 1 in Telluride, CO Gollwitzer & Nagaitsev presented Attending: Ankenbrandt, Lebedev, Pasquinelli, Popovic, and.
Industry and the ILC B Barish 16-Aug May-05ILC Consultations - Washington DC2 Why e + e - Collisions? elementary particles well-defined –energy,
Design of Standing-Wave Accelerator Structure
Thomas Roser RHIC Open Planning Meeting December 3-4, 2003 RHIC II machine plans Electron cooling at RHIC Luminosity upgrade parameters.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Discussion on Studies at Test Stands Roger Ruber Uppsala University.
Introduction and Charge to the Review of ESS Target building and Instrument Hall design requirements Roland Garoby November 2014, Lund
1 Q3 Main linac starting gradient, upgrade gradient, and upgrade path Results of WG5 discussions.
Ajit Kurup, C. Bontoiu, M. Aslaninejad, J. Pozimski, Imperial College London. A.Bogacz, V. S. Morozov, Y.R. Roblin Jefferson Laboratory K. B. Beard, Muons,
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Positron Source Relocation 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Preliminary design of SPPC RF system Jianping DAI 2015/09/11 The CEPC-SppC Study Group Meeting, Sept. 11~12, IHEP.
Workshop on cryogenic and vacuum sectorisations of the SPL CERN, 9 th -10 th November 2009 Workshop Organisation and Goals Vittorio Parma TE-MSC.
ESS Design Options David McGinnis 4 March
F Project X Overview Dave McGinnis October 12, 2007.
Dave McGinnis Chief Engineer – Accelerator Division
Development of Dielectric PETS Chunguang Jing and Wei Gai ANL and Euclid CLIC workshop 2013.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
SRF Requirements and Challenges for ERL-Based Light Sources Ali Nassiri Advanced Photon Source Argonne National Laboratory 2 nd Argonne – Fermilab Collaboration.
Proton Driver Main Linac Parameter Optimization G. W. Foster Proton Driver General Meeting Jan 19, 2005.
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
CLARA Gun Cavity Optimisation NVEC 05/06/2014 P. Goudket G. Burt, L. Cowie, J. McKenzie, B. Militsyn.
Linac RF Source Recommendations for Items 22,23,24,46,47 Chris Adolphsen.
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
HWDB: Operations at the Spallation Neutron Source Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal.
Aug 23, 2006 Half Current Option: Impact on Linac Cost Chris Adolphsen With input from Mike Neubauer, Chris Nantista and Tom Peterson.
1 Update on Q2 Main linac starting gradient, upgrade gradient, and upgrade path Results of WG5 discussions after feedback from plenary on Tuesday New Option.
Fermilab Proton Driver and Muons David Johnson Fermilab Neutrino Factory Muon Collider Collaboration Meeting March 14, 2006.
Design Optimization of MEIC Ion Linac & Pre-Booster B. Mustapha, Z. Conway, B. Erdelyi and P. Ostroumov ANL & NIU MEIC Collaboration Meeting JLab, October.
1 Update on Q2 Main linac starting gradient, upgrade gradient, and upgrade path Results of WG5 discussions after feedback from plenary on Tuesday New Option.
O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY The Spallation Neutron Source Project: Update T. E. Mason Oak Ridge National Laboratory.
CLIC Energy Stages D. Schulte1 D. Schulte for the CLIC team.
Thomas Jefferson National Accelerator Facility Page 1 SPL Cryogenic and vacuum sectorisations 9-10 November, 2009 Joe Preble Workshop on cryogenic and.
CHARGES TO THE ESAC The External Scientific Advisory Committee for the HIPPI JRA inside CARE has been nominated to analyse the work done and planned in.
Power Upgrade Project SNS September 21-22, TBM Cost Estimate Cost Estimate Schedule Approach Tom Mann October 27, 2005.
June 3, 2004G.W.Foster - Proton Driver Proton Driver Project Development, Tactics & Strategy G. W. Foster Fermilab User’s Meeting June 3, 2004.
ESS Linac Modifications for ESSnuSB Dave McGinnis Chief Engineer / Accelerator Division August 27, 2014.
N. Walker, K. Yokoya LCWS ’11 Granada September TeV Upgrade Scenario: Straw man parameters.
CRYOGENICS FOR MLC Cryogenic Principle of the Module Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
SNuMI: WBS 1.1 Booster Upgrades Eric Prebys $642K FY06$ (no contingency, no G&A) xx% contingency Main Injector & Recycler BNB NuMI Tunnel Booster Ring.
The International Workshop on Thin Films. Padova 9-12 Oct of slides Present Status of the World- wide Fusion Programme and possible applications.
The SNS Power Upgrade Project Building on the Success of the SNS Accelerator Deployment Kevin Jones Research Accelerator Division Director.
ESS AD RETREAT 5 th December 2011, Lund “A walk down the Linac” SPOKES Sébastien Bousson IPN Orsay.
SNS linac beam commissioning By Michael Plum Spallation Neutron Source Oak Ridge National Laboratory ESS Workshop on beam commissioning April 8-9, 2014.
1 Project X Workshop November 21-22, 2008 Richard York Chris Compton Walter Hartung Xiaoyu Wu Michigan State University.
Beam dynamics and linac optics studies for medical proton accelerators
A. FaccoEURISOL DS Task 7GANIL, 30 Nov 2005 EURISOL DS 2° Meeting Task 7 - Primary Accelerator GANIL, November 30, 2005 Summary of the Task 7 status New.
PSI, Zurich February 29 – March Session classification : Accelerator Concepts Tuesday, March 1, 2016 Summary Vyacheslav Yakovlev Fermilab, USA.
Thomas Jefferson National Accelerator Facility Page 1 FNAL September 11, 2009 Design Considerations for CW SRF Linacs Claus H. Rode 12 GeV Project Manager.
The LEP Superconducting RF system has reached its maximum configuration of 288 four-cell cavities powered by 36 klystrons in In 2000, this system,
Present and possible future schemes for hadron therapy linacs Alberto Degiovanni for the ADAM team HG2017 Workshop , Valencia.
Summary of WG2 :CFS for staging
Physics design on Injector-1 RFQ
BriXS – MariX WG 8,9 LASA December 13, 2017.
SNS Fundamental Power Coupler History
Update of CLIC accelerating structure design
Accelerator Layout and Parameters
ERL Main-Linac Cryomodule
A Superconducting Proton/Electron Linac
ILC Cryogenics -- Technical Design Report Planning
Strategy for operation and recovery of performance at SNS -Background -History of performance -What is our operational strategy -Performance recovery.
Performance Recovery at CEBAF
SLHC-PP kick-off meeting, CERN 9 April 2008
SNS Commissioning Mike Plum
ERL Director’s Review Main Linac
SNS-PPU upgrades the existing accelerator structure
RF system for MEIC Ion Linac: SRF and Warm Options
Presentation transcript:

HISTORY OF SNS DESIGN AND TECHNOLOGY CHOICES PROJECT X WORKSHOP NOVEMBER 12-13, 2007 R. KUSTOM

BACKGROUND TO TECHNOLOGY CHOICE At time ANL/APS group came to SNS, the project had already started and a reasonably well developed RT Linac preliminary design existed to generate a 1-MW beam on target. The engineering details were still being developed. A construction contractor was on site preparing for the start of the conventional part of the project. A committee was formed to consider whether a different choice of technology offered greater scope and flexibility. The recommendation was to consider a SC Linac. A project management study determined that it was still possible to meet the cost and schedule milestones without serious breakage due to the technology switch.

Reasons for Choosing the Superconducting Option for the SNS Linac The higher gradient possible with SC cavities resulted in a general reduction of 140 meters in tunnel length (325m compared to 465m) The electrical power requirements were reduced by 12 Mw The SC option provided greater flexibility for future upgrades in power and for the future addition of a second target station.

Additional Considerations in the Choosing the SC Option for the SNS Linac Beam loss due to halo was less likely in the SC linac because of the larger beam aperture ( cm to 5.0 cm bore radius). There existed a significant industrial base for building superconducting cavities. There was not for RT cavities. Higher availability because cavity gradient was conservatively chosen allowing flexibility in operating parameters to adjust for weak or damaged cavities and still meet design energy.

REDUCED LENGTH AND HIGHER GRADIENT WITH SC LINAC RT LINAC Total linac tunnel length for RT Linac design was 465 meters Real-estate accelerating gradient was 2.28 MV/m for RT Linac design SC LINAC Total linac tunnel length is meters with free space for additional cryomodules Real-estate accelerating gradient is 3.9 MV/m for SC Linac

RF POWER REQUIREMENTS FOR RT LINAC DESIGN Peak Linac RF power MW, avg power 7.81 MW Peak DTL RF power 1.95 MW, avg 0.13 MW Peak DTL cu power loss 1.32 MW, avg 0.09 MW Peak CCDTL RF power 7.86 MW, avg 0.53 MW Peak CCDTL cu power loss 5.73 MW, avg 0.41 MW Peak CCL RF power MW, avg 7.15 MW Peak CCL cu loss 74.2 MW, avg 5.21 MW

POWER REQUIREMENTS FOR THE SC LINAC Peak Linac RF power 50.4 MW, avg 3.63 MW Peak DTL RF power 9.7 MW, avg 0.7 MW Peak DTL cu power loss 6.7 MW, avg 0.48 MW Peak CCL RF power 11.4 MW, avg 0.82 MW Peak CCL cu power loss 7.9 MW, avg 0.57 MW Peak SC RF power 29.3 MW, avg 2.11 MW

REDUCTION IN PHYSICAL PLANT REQUIREMENTS DUE TO SWITCH FROM RT TO SC LINAC Switch to SC Linac saved 140 meters of tunnel construction and still left space to increase the number of cavities in the future. Switch to SC Linac resulted in a reduction of about 12 MW in operating power. Much of it due to reduction in generation of RF power, but also power requirements for chiller and cooling water pumping are reduced more than offsetting the increase due to addition of the liquid helium plant.

UPGRADE PATH EASIER WITH SC LINAC One of the DOE design requirements was to include a path to upgrade the facility to higher power in the future. The original RT Linac upgrade path was 1->2->4 MW by changing the bridge couplers on the CCL and adding RF. Major funding and lengthy shutdowns would have been required at each upgrade step. The SC Linac upgrade path is to increase gradient, add some extra cryomodules, and increase the accumulator ring energy. The cavities are designed with conservative accelerating gradients, 9.3 MV/m for 0.61β and 11.9 MV/m for 0.81β cavities, making it relatively easy to achieve higher energies in the future. The ring is designed to go to higher energy, ~1.3 GeV, without a major shutdown. This built-in capability make it possible to increase the facility power on target without line item upgrade budgets and installation can be done in modular steps with no long shutdown of the user program.

DECISION ON TRANSITION ENERGY Project schedule strongly influenced the physics design because of late switch from RT to SC Linac Decision to keep RT CCL to 185 MeV was decided by inadequate time to develop a third cavity designed for low β. Transition energy was a trade-off between having an optimized match to the SC section and insurance against weak performing cavities.

SNS EXPERIENCE AND PROJECT X DESIGN RELATED Project X has the advantage to develop and test SC cavities prior to the start of the project allowing a more aggressive design with greater confidence that the design goals can be met. Starting with an SC linac in the conceptual stage of the project will also Project X to develop a better optimized design.

SNS EXPERIENCE AND PROJECT X OPERATIONS RELATED SNS has been very successful in operating around isolated cases of weak cavity performance. This has helped enormously with maintaining availability. This option is something that should be preserved in the Project X design. SNS has 3-4 cavities per cryomodule separated by warm sections. This allows removal of cryomodules in which cavity problems need to addressed (Field emission, multipactor, HOM damper heating, stuck tuners, input coupler problems), but this reduces the real- estate accelerating gradient. The Project X design needs to allow for relatively easy access and removal of individual cavities or small cavity groups for the purpose of improving performance, or replacement, while still achieving higher real-estate accelerating gradient.