Dagnabbit, this is good stuff !!! SURVEYING ENGINEERING SURVEYS USDA - NRCS Construction Inspection for Field Office Activities 1.

Slides:



Advertisements
Similar presentations
Unit 12 Construction Surveying
Advertisements

Construction Surveys
Culvert Inventory and Assessment Protocol 2015 Field Season.
Culvert Inventory and Assessment Protocol 2012 Field Season.
Applying Profiling Leveling Techniques
Surveying Chain Surveying
Maintaining Gage Datum: Levels at Gaging Stations.
Site and Highway Staking with Trimble SCS900
Micrometer Sizes range from 0 to 1 inch up to 12 inches.
Earthwork for Designers. What needs to get done first? Request Conventional/Photometric Survey Preliminary Plans - should be prepared once horizontal.
LEVELING (a most elevating passtime). The problem: I’m here standing on ground that’s metres above mean sea level I need to know the elevation.
Profile Leveling.
1 Automated Machine Guidance: Electronic Files and Design Data AASHTO Subcommittee on Construction Meeting August 18, 2010 – Burlington, VT Mark Taylor.
Layout a Project. OVERVIEW Familiarize you with techniques and procedures in staking / laying out a project using an Trimble S6 and R8 GPS – Controlled.
Chapter 13 Site Plan Layout.
ENGINEERING SURVEYING & PHOTOGRAMMETRY CVE 314
Land levelling design methods - plane method
ENGINEERING SURVEYS DEFINITION Surveying has to do with the determination of location of points on or near the surface of the earth. It is the art/science.
Differential Leveling Mr. Conrado Agm 230. Leveling Operations The basic function of the tripod level is to provide the operator with a level line of.
Harry Williams, Cartography1 Surveying Techniques I. The USGS supplies 1:24,000 scale maps for all the U.S. But detailed topography at larger scales is.
Indiana LICA Contractor Certification Training Workshop 2008 Basic Surveying Concepts.
Applying Differential Leveling Techniques. Next Generation Science /Common Core Standards Addressed! CCSS.ELA Literacy. RST.9 ‐ 10.2 Determine the central.
S.H.H.S Building Construction
Profile and Differential Leveling
Differential Leveling
1 Introduction to QA/QC Process. 2 CHECKLISTS SheetsItems to CheckGeneral Reference YesYes NoNo N/AN/A General General Plan Content DM=Design Manual General.
“We Bring Engineering to Life” 3-D Stream Restoration Design, Monitoring and Beyond David Bidelspach, PE - Stantec Consulting Greg Jennings, PE – NCSU.
Lesson Applying Profiling Leveling Techniques. Interest Approach Discuss with the students why producers sometimes put drainage ditches in their fields.
Water Quantity and Conservation #1 Use land according to its capability and treat it according to its needs  Use management to gain the most agricultural.
Wes Marshall, P.E. University of Connecticut March 2007
Site Investigation and Storage Structure Sizing CNMP Core Curriculum Section 4 – Manure Wastewater Storage and Handling.
Surveying Techniques I. The USGS supplies 1:24,000 scale maps for all the U.S. But detailed topography at larger scales is rare and/or.
Planning for Earthwork Construction
Chapter (5) Leveling Introduction:
Chapter 15 Site Plan Layout. Introduction Site plans can be drawn on media ranging in size from 8 ½" × 11" up to 34" × 44" –Depends on purpose –Many local.
COURSE 900 Day 2 - Property Descriptions Welcome to the International Right of Way Association’s R3.PPT
Chapter 16 Site Preparation. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify tasks required.
Mapping Chapter 16. Uses of Topographic Maps To determine the topography or relief of a tract of land. To determine hydrologic features such as drainage.
Chapter 7 Channel Excavation7 - 1 Chapter 7 Channel Excavation.
Chapter 4- Bench Checks1 Chapter 4 Bench Checks. Chapter 4- Bench Checks2 Before construction begins the BMs need to be checked. Why? From Design Phase.
Lesson Applying Differential Leveling Techniques.
4.0 Unit 4: BFE Considerations. 4.1 Objectives At the end of this unit, you should be able to:  List potential data sources for determining BFEs in A.
1 Applications Stream cross sections Highways Canals Sewers Water mains Sidewalks Retaining walls Fences Application of Differential Leveling Introduction.
How to Navigate a Set of Field Notes….. First the Jargon… Benchmark Backsight Foresight Height of Instrument Elevation Turning Point Station.
Field Office Construction, Technical Assistance and Quality Assurance NEDC Construction Inspection for Field Office Activities USDA is an equal opportunity.
Civil Engineering Surveying Roy Frank. Basic Route Survey and Design 1.Concept for Route 2.Reconnaissance Study 1.Small scale mapping of region (1”-500’
Civil Engineering Surveying Roy Frank. Planning A Survey  Planning requires a well rounded understanding of surveying practices  Process: 1. Choice.
Let’s Begin! Writing Manure Management Plans!. Manure Management Manual DEP Manure Management Manual can be divided into 3 Parts: Part I Requirements/Guidelines.
MANURE STORAGE FACILITIES Completing a Manure Management Plan Workshop v
Surveying 1 / Dr. Najeh Tamim
Riprap Installation Construction Inspection for Field Office Activities Will use Riprap Gradation and Riprap Subgrade Problems from Class Problem Section.
Construction Surveys. List of Figures Stages and Measurements of CS Design stages: topographic Surveying, and site maps Construction stage: Setting-out.
Applying Differential Leveling Techniques
DIFFERENTIAL – PROFILE LEVELING
Profile Leveling.
Surveying a Level Loop Surveying a Level Loop
Surveying a Level Loop Surveying a Level Loop
Surveying a Level Loop Surveying a Level Loop
Surveying a Level Loop Surveying a Level Loop
Engineering Surveying
Level Loop (or Closed Circuit)
Leveling.
Leveling.
Introduction Persons engaged in surveying are often called to determine volumes of various types of material. The most common unit of volume is cubic having.
Introduction Persons engaged in surveying are often called to determine volumes of various types of material. The most common unit of volume is cubic having.
Introduction Persons engaged in surveying are often called to determine volumes of various types of material. The most common unit of volume is cubic having.
Surveying a Level Loop Surveying a Level Loop
Introduction Persons engaged in surveying are often called to determine volumes of various types of material. The most common unit of volume is cubic having.
Leveling.
Stream Crossing Bootcamp
Presentation transcript:

Dagnabbit, this is good stuff !!! SURVEYING ENGINEERING SURVEYS USDA - NRCS Construction Inspection for Field Office Activities 1

Objectives u Review of policy and guidance for proper note keeping and surveying procedure u Understand proper note keeping requirements u Understand the different types of surveys and the requirements for each of them u Understand layout and checkout procedures for different conservation practices Objectives 2

NRCS Policy National Engineering Manual (NEM) –Part 540 – Field Surveys National Engineering Handbook (NEH) –Part 650 – Engineering Field Handbook (EFH) – Chapter 1, “Engineering Surveys” 3 NRCS Policy

NEM General 4 “ Concise, accurate, and legible engineering notes are necessary to document planning, design, and construction. They provide the basis for expenditure of Federal and other funds for conservation installations. The National Engineering Handbook (NEH), Part 650, Chapter 1, “Engineering Surveys” provide the recommended format for engineering notes and related staking. ” NRCS Policy

NEM Responsibility 5 B. “ The information from basic staking of earthwork normally becomes the basis for measurement of payment quantities. ” NRCS Policy

NEM Format 6 “Each State Conservation Engineer (SCE) is to establish the format and minimum requirements for engineering note keeping based on the NEH. Engineering records are to be uniform to simplify training, improve clarity and overall efficiency, and allow consistency if personnel change through the course of a project.” NRCS Policy

NEM Format - continued 7 “B. Loose-leaf notebooks, special forms, or hard copies of downloaded electronic data may be used for recording engineering surveys, notes, and design data for onfarm conservation practices (Class I - V jobs) such as ponds, terraces, diversions, waterways, and animal waste management facilities. The documentation for the engineering surveys for conservation practices must provide the minimum information as outlined in the NEH.” NRCS Policy

NEM Staking 8 “A. Basic Stakes.—Basic staking is defined as alignment and grade stakes for structures other than embankments and channels. For channels and embankments, basic staking includes alignment and grade stakes plus slope stakes at the normal interval for the work. Normal interval is 100-foot stations on tangents and may decrease to as little as 25 feet on sharp curves. When construction pay quantities are determined from basic staking, a fair and equitable description of the ground surface is needed for the calculation of performance quantities. NRCS Policy

EFH Chapter 1, Engineering Surveys u Defined for Federal Government in 1925 as –1 st, 2 nd, 3 rd, and 4 th order accuracy –Generally, 3 rd and 4 th order accuracy is required for conservation work u 3 rd order accuracy is generally required for “Ordinary Surveys” u 4 th order accuracy is generally required for “Rough Surveys”

EFH Chapter 1, “Engineering Surveys”

Surveying Accuracy u Ordinary survey accuracy –Establishing Bench marks –Level circuits with 6 or more set ups –Surveys for complex structures such as concrete manure tanks u Rough survey accuracy –Generally used for most conservation work u Reference is Table 1-1, EFH Part 650, Chapter 1, “Engineering Surveys”

EFH Chapter 1, “Engineering Surveys”

Surveying Accuracy Terms u Survey Accuracy – The allowable error of closure of your survey notes. u Closure – Closing the survey at its origin or a point of known elevation in reference to the point of origin. u Proving the Elevation –Mathematical

Engineering Surveys

Engineering Surveys

Total Length of Circuit = 1 mile Allowable Error = 0.10 feet

Classroom Exercise #1 BM # TP # TP # TP # TP #4 2.08TBM #1 Error of Closure = Total Length of Circuit = 1800 ft Allowable Error = Complete Construction Surveys – Exercise #1 “Bench Level Circuit Note Keeping” exercise in the class problems section of the workbook. Assumed elevation of BM #1 is Find first HI by adding BS on BM #1. Find elevation of TP #1 by subtracting FS BM #

Level Circuit Example showing closure

Objectives u Review of policy and guidance for proper note keeping and surveying procedure u Understand proper note keeping requirements u Understand the different types of surveys and the requirements for each of them u Understand layout and checkout procedures for different conservation practices Objectives 20

Survey Field Notes u REMEMBER THIS! –YOU ARE DEVELOPING FIELD NOTES SO THAT SOMEONE NOT INVOLVED IN THE SURVEY, CAN READ, UNDERSTAND, AND UTILIZE THE NOTES FOR DRAFTING, DESIGN OR THEIR INTENDED PURPOSE. u Reference – EFH , Page 1-5

Developing Field Notes u Fill out a cover page u Fill in the top right hand side of page 2 with: Who and What they are doing, When, Where, Why, Weather, and Page #. u Use a 2H or 3H pencil or pen u Letter NEATLY! write as small as is legible, SKIP SPACES! DO NOT CROWD NOTES! u Do NOT erase, STRIKE ONE LINE THROUGH AN ERROR AND CONTINUE u Your notes MAY become a legal document or evidence. Take Pride In Your Work And Do It Correctly.

Typical survey plan for a Waterway or Channel R L Centerline WW Always look at increasing Stations to determine Left and Right from centerline

Actual survey notes from FO survey for waterways Anything Missing??

Topographic Surveys and Notes u Use a grid survey for simple areas on flat topography u Use handheld GPS and laser level in combination to map contour lines u Use total station or RTK GPS u Other? (LIDAR)

Objectives u Review of policy and guidance for proper note keeping and surveying procedure u Understand proper note keeping requirements u Understand the different types of surveys and the requirements for each of them u Understand layout and checkout procedures for different conservation practices Objectives 29

Why do we survey? u Conservation Practices –Inventory and Evaluation –Design and Layout u Guide for Construction/Quality Control –Construction Inspection u Measure Quantities/Certify for Payment –As-Built Plans

Technical Release (TR) 62 u No longer mentioned in the NEM or EFH Chapter 1 as a reference, but other chapters still refer to it: –Good reference for note keeping and layout –May be referenced in SOW or Documentation Requirements for practices –Some information has been incorporated into EFH chapter 1

Objectives u Review of policy and guidance for proper note keeping and surveying procedure u Understand proper note keeping requirements u Understand the different types of surveys and the requirements for each of them u Understand layout and checkout procedures for different conservation practices Objectives 32

Technical Release (TR) 62 u Layout of conservation practices –Based on practice measurement –Location only – flag line –Location by slope stake at no cut/no fill requires a baseline and elevation readings –Grid layout –Boundary layout

Class Exercise Practice nameSurvey accuracy (R or O) Layout method Irrigation Pipeline Pipeline Sprinkler Irr Waste Storage Micro-irrigation Pond Water Control Structure OrdinaryLocation Ordinary Location Rough? Ordinary Rough Slope stake Slope stake? Hint: From NEH Chapter 1, Ordinary Survey accuracy should be attained in establishing benchmarks, level circuits involving six or more setups, and surveys for drainage, irrigation, large channels, and other major structural practices.

Checkout of Practices u Checkout of conservation practices –Based on practice measurement –Found in Statement of Work (SOW) or documentation requirements –Unit of measurement and how to measure are usually detailed in specifications –Surveys for quantities

Slope staking procedures u Grade rod or elevation difference –Grade rod is HI – planned elevation –Grade rod is positive or negative (Important) –Grade rod – rod reading = Fill or Cut (negative is fill and positive is cut) u Trial and error to find toe location based on rod reading –Take rod reading at centerline u RTK GPS and slope staking software

Grade Rod

Construction Surveys Stakeout Example u Slope staking for a small embankment u Reference EFH Chapter 1, pgs 1-74 thru 1-86 and NEH 645 Appendix D, pg D-4 –Toe Dist = tw/2 + hs where –tw is top width – h is height of fill and – s is side slope

Slope staking example – Friendly Farmer GSS

Slope staking problem Construction Surveys – Stakeout Exercise BM #2 = BS = 6.04 HI = , Use Station 0+50 DS RR = 4.6 Fill Ht = 1.7 – 4.6 = -2.9 Since negative it is a fill Fill 2.9’ Offset distance = TW/2 +(SS * Fill) = 8/2 + (3*2.9) = = 12.7’ Grade Rod = HI – TOD – =

Example of Notes for Embankment Stakeout

Summary u See if you can answer the following: –Name 2 reasons you may need a turning point. –Do you add or subtract back sites? –(T or F) You take a back site to establish the height of the turning point or benchmark. –(T or F) For turning points or BM’s, you read the rod to the hundredth. Ground shots are read to the tenth. –(T or F) You always go R or L of a BL or CL looking toward increasing stations.