Plan for 500 GeV Development Vadim, Mei. Goals 1.Explore polarization transmission to the 500 Gev CM energy. 2. Inspect the luminosity aspects (with 2.

Slides:



Advertisements
Similar presentations
1 Accelerator Physics Aspects LHCb Accelerator Physics Aspects LHCb CERN SL/AP n Layout n Crossing Scheme n Luminosity n Collision.
Advertisements

Note: most of the slides shown here are picked from CERN accelerator workshops. Please refer to those workshop for further understanding of the accelerator.
RHIC Status Haixin Huang Time Meeting 02/1/2011. Jan. 26 Ring access for six hours to fix jet and many other jobs. Difficulty to provide 28X28 store overnight.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 5 Apr 2011 Agenda: Open.
APEX Report: March 31 – April 1, 2009 Fulvia Pilat Time Meeting, April 7, 2009.
Internal target option for RHIC Drell-Yan experiment Wolfram Fischer and Dejan Trbojevic 31 October 2010 Santa Fe Polarized Drell-Yan Physics Workshop.
AGS pp Status Feb. 20, 2015 RSC Meeting Haixin Huang.
Beam Commissioning Workshop, 19th January Luminosity Optimization S. White, H. Burkhardt.
1 Near-term machine performance — The next 5 years, before e-cooling — Wolfram Fischer Run Coordinator for RHIC Run-4 Open Meeting on RHIC Planning Berkner.
S.J. Brooks RAL, Chilton, OX11 0QX, UK Options for a Multi-GeV Ring Ramping field synchrotron provides fixed tunes and small.
Beam-beam Observations in RHIC Y. Luo, W. Fischer Brookhaven National Laboratory, USA ICFA Mini-workshop on Beam-Beam Effects in Hadron Colliders, March.
Overview Run-6 - RHIC Vadim Ptitsyn C-AD, BNL. V.Ptitsyn RHIC Spin Workshop 2006 RHIC Run-6 Timeline  1 Feb – Start of the Run-6. Start of the cooldown.
RHIC Accelerator Capability: Present and Future Mei Bai Collider Accelerator Dept. BNL.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Polarized Proton Acceleration and Collisions Spin dynamics and Siberian Snakes Polarized proton acceleration.
Machine - Experiments January 12, 2005 Machine status.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
May 17, 2005Wednesday Experiment Meeting BNL, Upton Acceleration beyond 100 GeV  Goal To evaluate the spin dynamics beyond 100 GeV  What’s the impact.
RHIC Run14 Time Meeting. Run14 Status – Apr. 29 Operations running well, 11 full stores over the past 7 days; setting STAR ZDC rates to 50 khz is now.
ION COMMISSIONING REVISITED 1 Thanks to: John Jowett, Walter Venturini. Matteo Solfaroli.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
Friday to Saturday 02:00: Machine closed. 09:00: Cryogenics all OK. Preparing pre-cycle. 10:00: Pre-cycle started. 11:30: Pre-cycle finished. 14:00: Beam.
R. Assmann - LHCCWG Two Beam Operation R.W. Aßmann LHCCWG Acknowledgements to W. Herr, V. Previtali, A. Butterworth, P. Baudrenghien, J. Uythoven,
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
RHIC pp 500 GeV development M. Bai C-A Department.
Flat-beam IR optics José L. Abelleira, PhD candidate EPFL, CERN BE-ABP Supervised by F. Zimmermann, CERN Beams dep. Thanks to: O.Domínguez. S Russenchuck,
RHIC Run11 Summary May 6, 2011 RSC Meeting Haixin Huang Luminosity Availability Polarization RHIC setup issues.
Feb. 23, 2005Wednesday Experiment Meeting BNL, Upton Status on AGS cold snake  Cold mass is now in the cryostat. It is in the phase of wiring, and because.
SuperB with Two Interaction Regions Is it possible to obtain luminosity per each IP? P.Raimondi, D.N.Shatilov, A.Variola,M.Zobov.
APEX RUN-14 APEX Schedule April 1, :00am Store Elens commissioning Gu, Fischer, Luo, Simon 10:00am 4:30pm2:00pm AC dipole setup Bai Momentum Aperture.
Preparation Status of pp Run11 Haixin Huang Time Meeting 12/21/
J-PARC Spin Physics Workshop1 Polarized Proton Acceleration in J-PARC M. Bai Brookhaven National Laboratory.
POLARIZATION MEASUREMENTS AND ABSOLUTE POLARIZATION VALUES EVOLUTION DURING PROTON BEAM ACCELERATION IN THE RHIC ACCELERATOR COMPLEX A.Zelenski, T.Roser,
MD Wed – Sat DayTimeMD Wed06:00UPS repair, ATS optics checks w/o beam 12:00Cycle, test ATS optics w/o beam 16: TeV: BPM offset determination for.
09-21 Study of bunch length limits Goals: To identify and observe effects which put limits on the minimum bunch length in RHIC. Try to distiguish the limitation.
Beam-beam compensation at RHIC LARP Proposal Tanaji Sen, Wolfram Fischer Thanks to Jean-Pierre Koutchouk, Frank Zimmermann.
Beam Physics Issue in BEPCII Commisionning Xu Gang Accelerator physics group.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Proton Polarimetry Proton polarimeter reactions RHIC polarimeters.
Beam-Beam head-on Limit J. Barranco, X. Buffat, T. Pieloni, C. Tambasco, J. Qiang, K. Ohmi, M. Crouch for the Beam-Beam team BI BSRT Team George and Enrico.
1 RHIC II – Ion Operation Wolfram Fischer RHIC II Workshop, BNL – Working Group: Equation of State 27 April 2005.
Polarized Proton at RHIC: Status and Future Plan Mei Bai Collider Accelerator Dept. BNL A Special Beam Physics Symposium in Honor of Yaroslav Derbenev's.
Cryo back at 17:30 Beam back at 19:00 IR2 aperture until ~03:00 Since then no beam from the SPS:  Connector problem on MKD  Connector eroded, needs to.
RHIC 250 GeV Polarized Proton Run 2009 Mei Bai RUN website: 12/16/2008RHIC Spin Collaboration Meeting.
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
Run 10 Start-up Status
APEX Studies: Accelerating w. Near 3 rd Order Resonance Vincent, Al, Michiko, Steve, Don, Yun, Guillaume, Mei, Todd, Wolfram, Greg, …
Thomas Roser SPIN 2006 October 3, 2006 A Study of Polarized Proton Acceleration in J-PARC A.U.Luccio, M.Bai, T.Roser Brookhaven National Laboratory, Upton,
Status of RHIC Polarization Studies. Summary of Polarization Studies during Run09 Tune scans: – Nearby 0.7 – Near integer tune Polarization ramp measurement.
ApEx needs for CeC PoP Experiment December 11, 2015.
H-jet Run at Injection A. Dion, H. Huang, A. Poblaguev, A. Zelenski, and YM.
APEX Status and Plan Phil’s Meeting, March 20, 2012 M. Bai.
APEX RUN-11 APEX Schedule Planned Feb. 23, pm ~ 3 ramps 8am 12x12 store Physics store Beta* unsqueeze +s* adjustment GRD+team 6x6 store AC dipole.
RHIC Status Haixin Huang Time Meeting 01/25/2011.
Effect of high synchrotron tune on Beam- Beam interaction: simulation and experiment A.Temnykh for CESR operating group Cornell University, Ithaca, NY.
Polarized Proton Acceleration in the AGS with Two Helical Partial Snakes October 2, 2006 SPIN 2006 H. Huang, L.A. Ahrens, M. Bai, A. Bravar, K. Brown,
Fabio Follin Delphine Jacquet For the LHC operation team
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Status of LHC Operations
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Friday morning 10:30 Optics measurements and corrections.
Summary Thursday h21: Stable beams fill #1303.
HL-LHC operations with LHCb at high luminosity
Summary for LPC (March 7th, Ralph Assmann)
Low Energy Electron-Ion Collision
LHC Morning Meeting - G. Arduini
Another Immortal Fill….
100th FCC-ee Optics Design Meeting
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

Plan for 500 GeV Development Vadim, Mei

Goals 1.Explore polarization transmission to the 500 Gev CM energy. 2. Inspect the luminosity aspects (with 2 collisions): store lifetime, total intensity limits.

Machine configuration  Beta* (IP6,IP8): 2m  No crossing angles  Standard tune swing at 100Gev: (.72;.73) -> (0.69, 0.68)  No rotators

Plan (1) Day 1: –Ramp development with 6 bunches(3 shifts) Tune/decoupling feedback application Orbit correction below 0.5mm Machine protection at higher energies ( several quenches during 205Gev development last year) Day 2: –Finishing ramp development with 6 bunches (1 shift) –56 bunch development ( 2 shifts) Ramp improvement to deliver higher intensities Polarization measurements at the store. Store development and collision steering.

Plan (2) Day 3-4: –Polarization transmission development (2 shifts) Goal: to maximize injection-to-store polarization transmission. If the polarization loss is obvious: –polarization ramp measurement –tune/orbit corrections at the position of polarization loss. Polarization profile measurements at injection and store in both planes. –Polarization setup at store (1 shift) Goal: to measure the width of depolarizing resonances at the store Tune scans at store both Qx and Qy around 0.7. One at a time Profile measurements at store in both planes –Polarization studies on the ramp (2 shifts) Goal: to evaluate the tolerances for orbit and betatron tunes on the ramp Polarization ramp measurement Systematic measurement as function of closed orbit distortion at one of three major resonances above 100 GeV Systematic measurement as a function of tunes at the resonances.

Plan (3) Day 4-5: –Beam-beam limit (1 shift): Goal: to compare beam-beam limits at 100 and 250Gev Collisions with bunch intensities achieved during 100Gev run (6 bunch ramp) (1 shift) –Total intensity limit (1 shift): Goal: to check for possible total intensity limits 56 (110 bunch) acceleration with high bunch intensities (>1e11 p/bunch) –Stores (~4h) Goal: to evaluate beam lifetime and polarization lifetime (2 shifts) Varying the (vertical) tune distance from 0.7 from store to store Can be used by the experiments. ( Local polarimeters?)

Run layout Ramp and polarization development: 8 shifts Dedicated polarization studies: 3 shifts Dedicated luminosity studies: 4 shifts Contingency shifts: 3 shifts Total:18 shifts or 6 days