UK FEL R&D Plans Jim Clarke STFC Daresbury Laboratory & The Cockcroft Institute IoP PAB/STFC Workshop Towards a UK XFEL 16 th February 2016.

Slides:



Advertisements
Similar presentations
Jim Clarke ASTeC and Cockcroft Institute ALPHA-X Workshop, May 2013
Advertisements

Chris Tennant Jefferson Laboratory March 15, 2013 “Workshop to Explore Physics Opportunities with Intense, Polarized Electron Beams up to 300 MeV”
ERLP Overview Hywel Owen ASTeC Daresbury Laboratory.
FEL Considerations for CLARA: a UK Test Facility for Future Light Sources David Dunning On behalf of the CLARA team 8 th March 2012.
Hard X-ray FELs (Overview) Zhirong Huang March 6, 2012 FLS2012 Workshop, Jefferson Lab.
1 Enhancements to the Linac Coherent Light Source.
Does the short pulse mode need energy recovery? Rep. rateBeam 5GeV 100MHz 500MWAbsolutely 10MHz 50MW Maybe 1MHz 5MW 100kHz.
The BESSY Soft X-Ray SASE FEL (Free Electron Laser)
SLAC XFEL Short Bunch Measurement and Timing Workshop 1 Current status of the FERMI project (slides provided by Rene Bakker) Photoinjector laser system.
The CLARA FEL Test Facility on behalf of the CLARA Project Team
New Electron Beam Test Facility EBTF at Daresbury Laboratory B.L. Militsyn on behalf of the ASTeC team Accelerator Science and Technology Centre Science.
W.S. Graves, ASAC Review, Sept 18-19, 2003 Accelerator Overview Goals for proposal Description of technical components: injector, linac, compressors, etc.
Diamond and the UK new light source Chris Christou, X-band workshop, Cockcroft Institute, 1 st December 2008.
Jim Clarke STFC Daresbury Laboratory and The Cockcroft Institute on behalf of the CLARA & VELA Project Teams LCWS14, 9 th October 2014 The CLARA Project.
The impact of undulators in an ERL Jim Clarke ASTeC, STFC Daresbury Laboratory FLS 2012, March 2012.
Progress at the XFELs in Europe and Japan Hans-H. Braun, PSI 48 th ICFA Advanced Beam Dynamics Workshop on Future Light Sources March 1-5, 2010 SLAC National.
Jim Clarke ASTeC, Daresbury Laboratory on behalf of the CLARA & VELA teams CLIC Seminar, 24 th April 2014 CLARA & VELA: FEL R&D Activities at Daresbury.
Low Emittance RF Gun Developments for PAL-XFEL
F Project X Overview Dave McGinnis October 12, 2007.
Synchronisation Activities for 4GLS Supported by EUROFEL DS3 G J Hirst CCLRC Central Laser Facility.
Jim Clarke STFC Daresbury Laboratory and The Cockcroft Institute on behalf of the CLARA Project Team X-band FEL Face to Face Meeting, 29 th July 2015 CLARA:
LCLS Accelerator SLAC linac tunnel research yard Linac-0 L =6 m Linac-1 L  9 m  rf   25° Linac-2 L  330 m  rf   41° Linac-3 L  550 m  rf  0°
Pavel Karataev John Adams Institute for Accelerator Science At Royal Holloway, University of London oPAC Advanced School on Accelerator Optimisation 7-11.
W.S. Graves ASAC Review Sept 18-19, 2003 R&D at Bates William S. Graves MIT-Bates Laboratory Presentation to MIT X-ray laser Accelerator Science Advisory.
LCLS_II High Rep Rate Operation and Femtosecond Timing J. Frisch 7/22/15.
Free-Electron Laser at the TESLA Test Facility More than 50 institutes from 12 countries are involved in the TESLA Project The TESLA Collaboration: Three.
FLASH II. The results from FLASH II tests Sven Ackermann FEL seminar Hamburg, April 23 th, 2013.
SLAC ARD Test Facilities Tor Raubenheimer December 8 th, 2010.
Brief Introduction to (VUV/)Soft X-ray FELs R. P. Walker Diamond Light Source, UK ICFA Workshop on Future Light Sources March 5 th -9 th, 2012 Thomas Jefferson.
Accelerator Science and Technology Centre POST-LINAC BEAM TRANSPORT AND COLLIMATION FOR THE UK’S NEW LIGHT SOURCE PROJECT D. Angal-Kalinin,
Max Cornacchia, SLAC LCLS Project Overview BESAC, Feb , 2001 LCLS Project Overview What is the LCLS ? Transition from 3 rd generation light sources.
Accelerator Science and Technology Centre POST-LINAC BEAM TRANSPORT AND COLLIMATION FOR THE UK’S NEW LIGHT SOURCE PROJECT D. Angal-Kalinin,
Electron Sources for ERLs – Requirements and First Ideas Andrew Burrill FLS 2012 “The workshop is intended to discuss technologies appropriate for a next.
Velocity bunching from S-band photoinjectors Julian McKenzie 1 st July 2011 Ultra Bright Electron Sources Workshop Cockcroft Institute STFC Daresbury Laboratory,
Commissioning and Utilisation of ERLP David Holder ASTeC, Daresbury Laboratory.
The Next Generation Light Source Test Facility at Daresbury Jim Clarke ASTeC, STFC Daresbury Laboratory Ultra Bright Electron Sources Workshop, Daresbury,
Graeme Burt Lancaster University and The Cockcroft Institute on behalf of the CLARA & VELA Project Teams CLIC Workshop 2015 The CLARA Project - Rationale.
Lessons Learned From the First Operation of the LCLS for Users Presented by Josef Frisch For the LCLS March 14, 2010.
김 귀년 CHEP, KNU Accelerator Activities in Korea for ILC.
J. Corlett. June 16, 2006 A Future Light Source for LBNL Facility Vision and R&D plan John Corlett ALS Scientific Advisory Committee Meeting June 16, 2006.
UK X-FEL National Laboratory Perspective Susan Smith STFC ASTeC IoP PAB/STFC Workshop Towards a UK XFEL 16 th February 2016.
FEL R&D goals and potential in UK Institutes Brian McNeil, Department of Physics, University of Strathclyde For: Peter Ratoff, Director, Cockcroft Institute,
THE ANDRZEJ SOŁTAN INSTITUTE FOR NUCLEAR STUDIES INSTYTUT PROBLEMÓW JADROWYCH im. Andrzeja Sołtana
, Summary of Working Group 1 Linear Colliders and Light Sources C. Christou, M. Dehler.
X-band Based FEL proposal
Introduction to CLARA Jim Clarke ASTeC, Cockcroft Institute.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
Applications of transverse deflecting cavities in x-ray free-electron lasers Yuantao Ding SLAC National Accelerator Laboratory7/18/2012.
1 NGLS Outline and Needs in Superconducting RF Materials Development John Corlett SRFMW, July 16, 2012 Office of Science.
Capabilities and Programmes of STFC’s Accelerator Science & Technology Centre (ASTeC)
Free Electron Laser Studies
Dielectric Wakefield R&D programme at Daresbury Lab.
WP4 – Potential FEL Output Performance Enhancements
Beam dynamics for an X-band LINAC driving a 1 keV FEL
UK FEL development package WP6:
UK-XFEL WP1 – Electron Injector Development
LLRF'15 Workshop, Shanghai, Nov. 4, 2015
An X-band system for phase space linearisation on CLARA
Accelerators in a new light
WP11: electron and proton beam testing
Gu Qiang For the project team
Paul Scherrer Institut
Accelerator Layout and Parameters
Revised Commissioning Strategy
VUV/Soft X-ray Oscillators
WBS 5.0 LCLS Strategic Projects Division
Advanced Research Electron Accelerator Laboratory
Jim Clarke ASTeC Daresbury Laboratory March 2006
Brief Introduction to (VUV/)Soft X-ray FELs
Introduction to Free Electron Lasers Zhirong Huang
Presentation transcript:

UK FEL R&D Plans Jim Clarke STFC Daresbury Laboratory & The Cockcroft Institute IoP PAB/STFC Workshop Towards a UK XFEL 16 th February 2016

Contents UK Context & Selected FEL projects – 4GLS – ALICE – NLS – SwissFEL FEL R&D Planning & Goals CLARA Next Steps Summary

4GLS Key Features Superconducting RF based CW Energy recovery linac Three FELs –XUV: Single pass HHG seeded (750MeV, kHz) –VUV: High gain oscillator RAFEL (550MeV, MHz) –IR: Low gain oscillator (25 to 60MeV, MHz) Also several spontaneous synchrotron radiation beamlines THz to ~500eV 2000 Studies commence 2002 Science Case 2003 ALICE test facility funded 2006 CDR published 2008 Project stopped

ALICE Key Features Superconducting RF based Pulsed Energy recovery linac Prototype for 4GLS technology and beam dynamics FEL included to disrupt beam (4% energy spread) to test return arc design – IR: Low gain oscillator (~30MeV, MHz pulsed) THz and ~5 to 11  m Not used for accelerator R&D since 2014 Now operated for cancer research, funded by EPSRC Mid Range Facility proposal supported by 116 scientists from 59 departments in 33 UK universities, hospitals and companies Would expand science research to cover Quantum Technology, Electronic Materials, Catalysis, Dynamics of Non-Crystalline Systems, as well as ongoing cancer studies 2003 ALICE test facility funded 2010 First lasing of IR FEL 2011 First proof of principle experiments 2014 ScanCan grant awarded by EPSRC 2016 Mid Range Facility Proposal

NLS Key Features Superconducting RF based Linac, 2.25GeV Three FELs –Single pass HHG seeded cascade (50 – 300eV, MHz) –Single pass HHG seeded cascade (250 – 850eV, MHz) –Single pass HHG seeded cascade (430 – 1000eV, MHz) THz to 1keV (with harmonics to 5keV) 2008 Studies commence 2009 Science Case & Outline Facility Design 2010 CDR published 2010 Project put on hold

SwissFEL 2011 MoU Signed and Work Packages agreed – Collimator System for ARAMIS – Self-seeding and Afterburner for the hard X-ray FEL Aramis – EPICS Control Software – Construction of laser heater undulator – Two-colour FEL Modelling – Mode locked FEL Modelling 2016/17 Assistance with SwissFEL commissioning (accelerator and FEL)

FEL R&D Planning The accelerator community is generating a UK FEL R&D programme to develop the skills and technology required so that when we get the green light for the UK X-ray FEL facility we are ready to make well informed decisions on layout and have solutions to all major technical issues The plan has received input from ASTeC, CI, DLS, & JAI The goals identified will need to confirmed after the STFC FEL strategy is published and digested The heart of the R&D programme will be the detailed design, assembly, commissioning, development, and exploitation of the CLARA FEL Test Facility An important aspect of the programme will be strong connections to potential user community and working groups on lasers, optics, detectors, beamline & endstation layout, science case, UK-XFEL Hub etc.

#1: Gun development Optimised electron source: -designs for minimum emittance at low charge, minimum emittance at high charge etc. #2: RF -RF frequency choice -Low level and high level RF control and stability -RF structure design & optimisation -Economic optimisation of accelerating gradient - Multibunch operation #3: Electron Beam Transport Simulation and Optimization Delivering appropriate quality electron bunches at the entrance to the FEL and transporting through the FEL: -Start to end simulations from cathode to FEL, optimizing performance and stability -Understanding and mitigating (or potentially exploiting) collective effects such as space charge, wakefields, and CSR -Alignment and tuning strategies within the FEL -Beam switching between FELs (slow and fast) FEL R&D Goals (can map to work-packages) Common slide 1 of 3 Outcome of the meeting of accelerator experts 28 Jan 2016

#4: FEL Output Simulation and Optimization Critically examine potential FEL output performance enhancements over current generation of X-ray FELs: -Achieving the best FEL output stability shot to shot (intensity and wavelength). -Generation of flexible FEL output pulse structures (eg two colour, two pulse, …). -Generating ultra-short photon pulses (sub fs). -Generating transform limited FEL output (time-bandwidth product). - Other potential enhancements (higher peak power, generating useful high harmonics of fundamental, polarisation control, …) #5: Electron & Photon Diagnostics -Bunch (slice) measurements at all charge levels -Transverse and longitudinal profiles (e.g. cSPR, …) -Diagnostic for ultra-low charge operation, (cavity BPM) -Feedback systems (trajectory, optics, energy, charge, …) -FEL pulse wavelength, pulse length, profile, etc. Common slide 2 of 3 FEL R&D Goals Outcome of the meeting of accelerator experts 28 Jan 2016

#6: Synchronisation Achieving sub-10 fs synchronisation between the FEL output and an external laser: -Timing distribution and synchronisation of essential systems. -Measuring synchronisation level between FEL output and external laser. -Measuring electron bunch arrival time. -Minimising electron bunch jitter through passive or active schemes. Common slide 3 of 3 FEL R&D Goals Outcome of the meeting of accelerator experts 28 Jan 2016

CLARA CLARA will be a purpose built dedicated flexible FEL Test Facility –Capable of testing the most promising new schemes We have strategically decided to focus on stability, synchronisation, and new FEL capabilities –We are focussing on the longer term capabilities of FELs, not just short term incremental improvements –Taking FELs into a new regime –By demonstrating these goals we will have to tackle all the challenges currently faced by state of the art FELs so we will be very well placed to meet the needs of the UK users when we design and build a national X-ray FEL

CLARA C ompact L inear A ccelerator for R esearch and A pplications An upgrade of the existing VELA Photoinjector Facility at Daresbury Laboratory to a 250MeV Free-Electron Laser Test Facility Proof-of-principle demonstrations of novel FEL concepts and development of future accelerator technologies Emphasis on Stability, Synchronisation and new FEL capabilities

Do any other countries build test facilities? Japan built SCSS then SACLA Germany built FLASH then European XFEL Italy built SPARC then FERMI Switzerland built SwissFEL Injector then SwissFEL China has built SDUV-FEL and are planning SXFEL test facility SCSS & FLASH have now transitioned to user facilities, SwissFEL Injector has been decommissioned SPARC and SDUV-FEL are still running as test facilities NLCTA in the USA is a test facility that runs alongside LCLS and is informing the design of LCLS-2

What will CLARA be able to do? Example: Reducing the spread of wavelengths Prove that a new idea called HB-SASE actually works –Could then build it in from the start of the UK FEL Will work at any wavelength and any repetition rate, no fancy optics required! NORMAL FEL B.W.J. McNeil, N.R. Thompson & D.J. Dunning, PRL 110, (2013)

What will CLARA be able to do? Example: Generate few cycle pulses Prove that a new idea called Mode-locked afterburner actually works –Could then build it in from the start of the UK FEL –Able to probe ever faster processes (sub-attosecond) D.J. Dunning, B.W.J. McNeil, & N.R. Thompson PRL 110, (2013)

What will CLARA be able to do? Example: Prove performance of 400 Hz Photoinjector Prototype 1.5 cell S-band gun with RF probe designed and fabricated Maximum gradient of 120 Hz, or 100 Hz (10kW cooling capacity) Vacuum load lock system for easy replacement of cathode Will be installed April 2016

CLARA Schematic CLARA will be able to lase between 100nm and 400nm

CLARA Layout Linac 1 is 2m long, S-band from Research Instruments Linacs 2 to 4 are 4m long S-band devices provided by SwissFEL Can replace Linac 4 with X-band linac as test bed for this technology

Where is CLARA being built?~100mCLARA

CLARA in the Electron Hall

Engineering Technology Centre VELA CLARA build phase /16 Installation started November 2015 Accelerating Linac1 S-Band 35MeV Collimator & YAG diagnostics Accelerating Linac2 S-Band 70MeV Variable Bunch Compressor (VBC) Laser Heater Stage Photocathode loadlock High Rep Rate Gun CLARA Engineering Technology Centre Dump

CLARA Phase 1

The Electron Hall The biggest building on site (34m x 110m) –Big enough for CLARA (which is about 10m x 90m) But the Electron Hall was not fit for purpose so is being upgraded –Since we want to build a very stable FEL, we need the temperature of the facility to also be very stable –Currently the temperature within the building varies by at least 15 °C over the year –Refurbishment will reduce this to only ±1 °C within the building –Within the shielded enclosure it will be ±0.05 °C

CLARA Gantt Chart

#1: Gun development Optimised electron source: -designs for minimum emittance at low charge, minimum emittance at high charge etc. #2: RF -RF frequency choice -Low level and high level RF control and stability -RF structure design & optimisation -Economic optimisation of accelerating gradient - Multibunch operation #3: Electron Beam Transport Simulation and Optimization Delivering appropriate quality electron bunches at the entrance to the FEL and transporting through the FEL: -Start to end simulations from cathode to FEL, optimizing performance and stability -Understanding and mitigating (or potentially exploiting) collective effects such as space charge, wakefields, and CSR -Alignment and tuning strategies within the FEL -Beam switching between FELs (slow and fast) FEL R&D Goals Colour coded to highlight where CLARA is impacting on achieving these goals

#4: FEL Output Simulation and Optimization Critically examine potential FEL output performance enhancements over current generation of X-ray FELs: -Achieving the best FEL output stability shot to shot (intensity and wavelength). -Generation of flexible FEL output pulse structures (eg two colour, two pulse, …). -Generating ultra-short photon pulses (sub fs). -Generating transform limited FEL output (time-bandwidth product). - Other potential enhancements (higher peak power, generating useful high harmonics of fundamental, polarisation control, …) #5: Electron & Photon Diagnostics -Bunch (slice) measurements at all charge levels -Transverse and longitudinal profiles (e.g. cSPR, …) -Diagnostic for ultra-low charge operation, (cavity BPM) -Feedback systems (trajectory, optics, energy, charge, …) -FEL pulse wavelength, pulse length, profile, etc. FEL R&D Goals

#6: Synchronisation Achieving sub-10 fs synchronisation between the FEL output and an external laser: -Timing distribution and synchronisation of essential systems. -Measuring synchronisation level between FEL output and external laser. -Measuring electron bunch arrival time. -Minimising electron bunch jitter through passive or active schemes. FEL R&D Goals

FEL R&D Plan Next Steps Iterate the proposed plan once the STFC FEL Strategy is published Establish a management and coordination structure Scope out plan in detail (tasks, resources, timescales, people) Review and Implement

Summary The UK has experience of several FEL design studies and one operating oscillator FEL –The NLS design was established quickly due to the previous FEL design experience of the teams involved The accelerator and FEL community has generated a number of FEL R&D goals –Gun development –RF Issues –Electron Beam Transport Simulation and Optimization –FEL Output Simulation and Optimization –Electron & Photon Diagnostics –Synchronisation CLARA will be at the heart of the FEL R&D programme –Front End installation has started –Procurement of remaining items for CLARA is ongoing but not yet fully funded –Electron Hall refurbishment has started –First lasing in 2020 The proposed R&D programme will be iterated once the FEL Strategy becomes clear