T2 GEM Production in Helsinki Kari Kurvinen 31.1.2006 TOTEM T2 EDR meeting Radiation Detector Laboratory of Helsinki Institute of Physics (HIP) and Department.

Slides:



Advertisements
Similar presentations
Eija TuominenHIP Detector Laboratory October Helsinki Institute of Physics DETECTOR LABORATORY National infrastructure to support Finnish research.
Advertisements

Status of test beam data analysis … with emphasis on resistive coating studies Progress and questions 1Meeting at CEA Saclay, 25 Jan 2010Jörg Wotschack,
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Present Status of GEM Detector Development for Position Counter 1.Introduction 2.GEM 3.Readout Board 4.Fabrication Test 5.Large GEM 6.Readout Electronics.
GEM Detectors for AnDY Nilanga Liyanage University of Virginia 1 Outline GEM chamber concept Large area GEM chamber projects Proposed GEM configuration.
CMS GEM Workshop III, April 20, 2012
Workshop on Silicon Detector Systems, April at GSI Darmstadt 1 STAR silicon tracking detectors SVT and SSD.
LHCC referees meeting, 10 October 2005Børge Svane Nielsen, NBI1 Status of the FMD LHCC referees meeting, 10 October 2005 Børge Svane Nielsen Niels Bohr.
F. Murtas LNF/INFN 9 July 2002 GEM Chamber 20x24 cm 2 Status Report F.Murtas for the GEM group  20x24 Prototype  PSI Test Beam  Module 0 Progress 
Nilanga Liyanage University of Virginia UVa GEM Team Dr. Kondo Gnanvo, Dr. Vladimir Nelyubin, Kiadtisak Saenboonruang, Chao Gu, Xinzhan Bai, Jie Liu, Seth.
Atsuhiko Ochi Kobe University / MAMMA collaboration 24/04/2013 RD51 mini week, WG6.
Introduction to GEM detectors assembly Leszek Ropelewski CERN CompassTotem 33 cm NA61 30 cm 20 cm 66 cm Totem Upgrade 10 cm.
Design and Construction of a First Prototype Muon Tomography System with GEM Detectors for the Detection of Nuclear Contraband M. Hohlmann 1, K. Gnanvo.
1 SBS Spectrometer / GEP5 Conf.. 2 Tracking Requirements Requirements Tracking Technology DriftMPGDSilicon High Rate: MHz/cm 2 (Front Tracker)
G. Martellotti CERN 22/04/20021 Tooling / Test Stations for MWPC (Meeting LNF, Roma1/Pz ) Production rate : 408 chambers (Fe + LNF) :192 R4 M1.
Sept. 24, Status of GEM DHCAL Jae Yu For GEM-TGEM/DHCAL Group Sept. 24, 2010 CALICE Collaboration Meeting Univ. Hassan II, Casablanca Introduction.
1 HBD Construction status Itzhak Tserruya DC meeting, BNL, February, 2006 Plans for Run-6 Box construction GEM assembly and testing Status of urgent items.
1 July GEM R&D Activity in USTC Yi Zhou University of Science & Technology of China.
John LeRose March 12, A Program of three “projects” to assemble the Super BigBite Spectrometer for a series of experiments in Hall A There is a.
First results of an aging test of a full scale MWPC prototype for the LHCb muon system Workshop on “Aging Phenomena in Gaseous Detectors”, October 2-5.
The Bigbite second GEM tracker. SBS GEM Trackers Front Tracker Geometry x6 18 modules In Italy  50 cm x 40 cm Modules are assembled to form larger chambers.
EST-DEM R. De Oliveira 20 Dec., ‘04 Production of Gaseous Detector Elements  History of Gas Detectors in Workshop  Fabrication of GEM Detectors  Fabrication.
12/Dec/2012SBS-Meeting1 of 24 Status of the Front Tracker GEM and INFN Electronics 2012 – Dec – 12 SBS Weekly Meeting GEM Assembling SRS – INFN Electronics.
HallA/SBS – Front Tracker PARAMETERDESIGN VALUE Microstrip Silicon Detector Number of tiles/plane and size2 Number of planes2 Size of the single
The ALICE Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr Institute for the ALICE Collaboration.
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
Overview of Production for CMS GE1/1
Update on SBS Back Tracker UVa K. Gnanvo, N. Liyanage, V Nelyubin, K. Saenboonruang, Seth Saher, Nikolai Pillip (visiting from Univ. Tel Aviv, Israel)
GEM R&D Update Kondo Gnanvo. Outline  GEM R&D and assembly facilities at UVa  Cosmic test results  Update on the 40 × 50 cm 2 GEM prototype  Plans.
Performance of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger,
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
Status of GEM T2 assembly Outline Status of the GEM components Summary Tests TOTEM Collaboration meeting CERN / Risto Orava for Kari Kurvinen.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
1 TPC R&D proposal from the WIS group I. Ravinovich WIS I. Ravinovich12/15/2015.
PHENIX upgrade possibilities in Finland Detector Laboratory/Helsinki JYFL/Jyväskylä 1) Organisation 2) Detector Laboratory premises & equipment 3) Silicon.
Plans for MPGD Radiation hardness tests for full detectors and components Matteo Alfonsi,Gabriele Croci, Elena Rocco, Serge Duarte Pinto, Leszek Ropelewski.
M. Staib, M. Abercrombie, B. Benson, K. Gnanvo, M. Hohlmann Department of Physics and Space Sciences Florida Institute of Technology.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
 The zigzag readout board is divided into eight η-sectors; each sector has a length of ~12 cm and comprises 128 zigzag strips; zigzag strips run in radial.
Large-Area GEM Detector Development at CMS, RD51, and Fl. Tech – A brief overview – Marcus Hohlmann Florida Institute of Technology, Melbourne, FL PHENIX.
Chamber Quality Control Before the construction several checks are performed on:  Panels (cathode and pad PCB)  GEM foil Tests on assembled detector.
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
Front Tracker: main technical solutions 40x50 cm 2 module Front Tracker Chamber: 40x150 cm 2  Use COMPASS approach: 3xGEM, 2D readout - one significant.
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
Construction and beam test analysis of GE1/1 prototype III gaseous electron multiplier (GEM) detector V. BHOPATKAR, E. HANSEN, M. HOHLMANN, M. PHIPPS,
GEM R&D updates from Chinese groups Yuxiang Zhao University of Science and Technology of China May 24,
Construction and Characterization of a GEM G.Bencivenni, LNF-INFN The lesson is divided in two main parts: 1 - construction of a GEM detector (Marco Pistilli)
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
Results on a Large Area triple-GEM Detector at LNF 5 th RD51 Collaboration Meeting Freiburg, 25 May 2010 D. Domenici - LNF.
Uva GEM R&D Update –Part I Kondo Gnanvo, Nilanga Liyanage, Vladimir Nelyubin, Kiadtisak Saenboonruang, Taylor Scholz and Adarsh Ramakrishnan In Collaboration.
GEM activities at LZU Xiaodong Wang ( 王晓冬 ) 09,25,2013.
Eija Tuominen, coordinatorHIP/UH Detector Laboratory, October 2010 DETECTOR DEVELOPMENT at HELSINKI DETECTOR LABORATORY Detector Laboratory is a joint.
MPGD TECHNOLOGIES AND PRODUCTION GEMMicromegas Resistive MSGC (NEW!) Rui De Oliveira 7/12/20111Rui De Oliveira.
PIXEL 2000 P.Netchaeva INFN Genova 0 Results on 0.7% X0 thick Pixel Modules for the ATLAS Detector. INFN Genova: R.Beccherle, G.Darbo, G.Gagliardi, C.Gemme,
A High Eta Forward Muon Trigger & Tracking detector for CMS A High Eta Forward Muon Trigger & Tracking detector for CMS Archana Sharma For CMS High Eta.
(On Behalf of CMS Muon Group)
Dept. of Physics and Space Sciences, Florida Institute of Technology
Quality Control Chamber Production
Gas Detectors (GEM) The 6th Egyptian school for high energy physics
Helsinki T2 status Risto Orava/ on behalf of Kari Kurvinen
On behalf of the GEMs for CMS Collaboration
Development of GEM Detectors for Muon Tomography
Development of Gas Electron Multiplier Detectors for Muon Tomography
(On Behalf of CMS Muon Group)
A DLC μRWELL with 2-D Readout
Presentation transcript:

T2 GEM Production in Helsinki Kari Kurvinen TOTEM T2 EDR meeting Radiation Detector Laboratory of Helsinki Institute of Physics (HIP) and Department of Physical Sciences of University of Helsinki.

28 cm No bonding anymore HV resistor divider board Test Cards T2 GEM design triple GEM foils Ar/CO 2 70/30 gas mixture operating gas gain M = 8000 design by F.Sauli & L.Ropelewski based on COMPASS GEM design GEM foils manufactured by CERN readout boards by CERN and a commercial company

radial strip readout split asymmetric APV VFAT support rails asymmetric spacers HV READOUT STRUCTURE XXX fully digital readout (no analog information used) 512 strips (pitch of 400 microns) 1560 pads (2x2 -> 7x7 mm 2 ) readout via connectors

T2 GEM production in Helsinki construction of 40+ GEM detectors for TOTEM T2 is on responsibility of the Helsinki group. a ”GEM production line” has been constructed in the detector laboratory of HIP Compass GEM production as a guideline (ref. M.Capean, B.Ketzer, A.Placci,L.Ropelewski, F.Sauli, M.van Stenis; Construction of GEM Detectors for the Compass Experiment, Technical Note TA1/00-03, CERN- EP/TA1).

Facilities for large GEM production dryboxes for leakage current measurements and for storage large area probe station ultrasonic bath for large frames oven for large foils

Production in clean rooms almost all the manufacturing phases in clean rooms. >120 m 2 clean room (classes 100 & 1000) available. usage currently shared by TOTEM and ALICE groups.

Clean room monitoring Particles temperature and humidity is continuously recorded as well

Main tasks in the production I.cleaning and varnishing of the frames. II.glueing of the drift electrode. III.streching and glueing of the GEM foils. IV.testing the readout boards. V.assembling all the parts together. VI.assembling connectors (gas, HV). VII.checking gas tightness. VIII.electronic tests. Handling procedures of the separate detector components are registered into a database.

A lot of manual work!

GEM FOILS visual inspection (coordinates of the major defects recorded). optical scanning dried in a desiccator. 1. leakage current measurements of all the segments in the foils (criteria <0.5 nA). streching and glueing on the frames curing > 16 hours in oven cut out from the foil 2. leakage current measurements

Leakage current measurements of GEM foils the four segments of the GEM foils are measured separately by a picoamp meter. a foil approved if current stays < 0.5 nA for 30+ leakage currents measured three times during assembly (as a bare foil, after framing and after gluing into a stack). 36 measurement / detector in N 2 spark! B-segment > 5 min in N 2 C-segment HV ramp up 12 min Present status: 21 foils checked (incl. prototypes), 2 failed

READOUT BOARD visual inspection capacitance measurement A.probe station & LCR meter B.semiautomatic relay system connectors soldered short circuits burned

Assembling components together in clean room of class 100 all the three framed GEM foils are glued one after the other on the drift frame (a special press constructed). consumption of the glue measured. 3. leakage current of the GEM foils checked after gluing. GEM stack glued on the readout board.

Assembling connectors gas tightness by Araldite & Dow Corning assembling: i. the voltage divider PCB ii.the adapters for the gas connectors and blocking the holes on the backside. iii.HV cables

TESTS GAS LEAKAGE TEST ELECTRONIC TESTS a.HV test in CO 2 or N 2 b.Basic measurement (gas amplification, energy resolution) c.Stability measurement d.Gas gain scan over active area.

Gas tightness TOOLS AVAILABLE comparison of in- and outflow leak detector oxygen measurement from the outflow

Basic measurements of HG1 55 Fe

Gas gain scan of readout sectors The gas gain of the whole readout sectors (128 strips or 120 pads) are measured. Due to different capacitances of pad and strip sectors and a limitation of preamplifier used the measurement may not be compared between pad and strip sectors.

Gas gain scan with a point source Different areas of the second half of the HG1 GEM were irradiated by 55 Fe source (50 points) 128 strips or 120 pads readout Std.dev.: on inner strips 5.8% on outer strips 10% on pads 8.1%

Prototypes one for the beam test (Nov. 2004) two built in Helsinki during 2005 T2 GEMs two built in Helsinki during 2005 chambers for 3rd,4th and 5th GEMs finished STATUS Jan. 2006

Conclusions the radiation detector laboratory of Helsinki has unique facilities to assemble and test large area gaseous detectors. a production of TOTEM T2 GEMs has successfully started.