CERN MBHSM0101 and Plan for Future Models F. Savary on behalf of the 11T Dipole Project Team.

Slides:



Advertisements
Similar presentations
Mechanical Analysis of Dipole with Partial Keystone Cable for the SIS300 A finite element analysis has been performed to optimize the stresses in the dipole.
Advertisements

Mikko Karppinen Nb3Sn Coil Production for 11 T Dipole Model Magnets.
Fessia Paolo, David Smekens and the whole TE-MSC-MDT section Insulation strategies and materials for incoming SC magnets.
LHQ Coil 1 OL Curing LHQ Coil 1 Shipping Miao Yu 02/28/2013.
QXFSM1 Mirror Shim System R. Bossert Dec. 1, 2014 LARP Teleconference.
EuCARD-HFM ESAC review of the high field dipole design, 20/01/2011, Maria Durante, 1/40 EuCARD-HFM ESAC Review of the high field dipole design Fabrication.
COIL & ASSEMBLY READINESS REVIEW, SEPT 2013 D. Smekens.
Preliminary Design of Nb 3 Sn Quadrupoles for FCC-hh M. Karppinen CERN TE-MSC.
F. Savary on behalf of the WP11 team Input from V. Baglin, D. Ramos.
DS 11T Coil #110 – impregnation results CERN, Prevessin B Author / al.
Superconducting Large Bore Sextupole for ILC
LARP QXF 150mm Structure Mike Anerella / John Cozzolino / Jesse Schmalzle November 15, nd Joint HiLumi LHC-LARP Annual Meeting.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
Coil Design and Fabrication Miao Yu Outline Introduction Coil Design –Coil Pole –Coil End Parts –Coil Insulation Coil Fabrication –Winding.
Susana Izquierdo Bermudez. With many contributions from Juho Rysti, Gerard Willering and all the people involved in the manufacturing and test of the magnet.
J. García, F. Toral (CIEMAT) P. Fessia (CERN) January, 26 th 2015.
Fred Nobrega. 9 Dec 2014 Model Design & Fabrication – FNAL Fred Nobrega 2 Outline Background Mechanical Design Model Magnet Features Coil Technology and.
The construction of the model of the curved fast ramped superconducting dipole for FAIR SIS300 synchrotron P.Fabbricatore INFN-Genova The construction.
Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz.
SC magnet developments at CEA/Saclay Maria Durante Hélène Felice CEA Saclay DSM/DAPNIA/SACM/LEAS.
FNAL QXF Curing Mold Miao Yu, FNAL 05/07/2013. FNAL Short Curing Press 2 2 meter long Capacity (pump psi) Max. force/cylinder kN (ton) Spacing cm(inch)
DOE Review of LARP – February 17-18, 2014 Coil Design and Fabrication Miao Yu February 17,
First approaches J. García, F. Toral, J. Munilla – CIEMAT.
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
11 T Dipole Experience M. Karppinen CERN TE-MSC On behalf of CERN-FNAL project teams The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded.
11 T Dipole Status at FNAL Fred Nobrega January 21, 2014.
Fred Nobrega, Nikolai Andreev 21 September, 2015.
Helene Felice 11/16/2011 LARP Collaboration Meeting 17 1 st HiLumi Collaboration Meeting CERN Status on HQ Coil Design and Fabrication.
Review of Quench Limits FermilabAccelerator Physics Center Nikolai Mokhov Fermilab 1 st HiLumi LHC / LARP Collaboration Meeting CERN November 16-18, 2011.
Subscale quadrupole (SQ) series Paolo Ferracin LARP DoE Review FNAL June 12-14, 2006.
D. Smekens. 2 Coil ID  CableCu DUMMY Cu DUMMY WST DUMMY RRP 54/61 DUMMY RRP 108/127 RRP 108/127 RRP 108/127 RRP 132/169.
Magnet design, final parameters Paolo Ferracin and Attilio Milanese EuCARD ESAC review for the FRESCA2 dipole CERN March, 2012.
F. Savary Question 1 A. Magnet design criteria for the prototype and production magnet to be tested before the installation into the tunnel.
HIGH RAMP RATE SUPERCONDUCTING MAGNETS AT BNL Peter Wanderer BNL Archamps Workshop, March 2003.
LARP Collaboration Meeting Racetrack Coil Fabrication
11 T Dipole Project CERN Status M. Karppinen 11 T Management meeting 1 July 2013.
11 T Dipole Status May 2012 M. Karppinen CERN TE-MSC On behalf of CERN-FNAL collaboration.
1 BNL -FNAL - LBNL - SLAC P. Wanderer IR’07 - Frascati 7 November 2007 U.S. LARP Magnet Programme.
QXF Coil Insulation during Each Step QXF Coil WG Miao Yu 08/22/2013.
DOE Review of LARP – February 17-18, 2014 SQXF Coil Design and Fabrication Winding and Curing Miao Yu February 17,
J.C. Perez, S. Izquierdo Bermudez 11T Dipole models instrumentation.
QXF Winding/Curing Tooling and Curing Mold Miao Yu, FNAL 04/09/2013 CM20_Napa Valley, CA.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 LHQ Goals and Status Giorgio Ambrosio Fermilab 2 nd LARP / HiLumi.
Magnet Components and Assemblies F. Savary
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
1 Long QXF Mirror Fabrication (MQXFPM1) Rodger Bossert HiLumi-LARP Collaboration Meeting May 18-20, 2016 SLAC R. Bossert - HiLumi Collaboration Meeting.
1 MQXFS Mirror Fabrication R. Bossert, G. Chlachidze, S. Stoynev HiLumi-LARP Collaboration Meeting May 11-13, 2015 FNAL.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
Page 1 TQC Mechanical Model Igor Novitski / Rodger Bossert May 24, 2006 Results of MM#4 and MM#5.
Model magnet test results at FNAL
11 T Dipole Integration & Plans M. Karppinen
HQ Mirror Assembly R. Bossert
TQS Structure Design and Modeling
High Order correctors coil manufacturing
LARP Technology Quadrupole Review
11T Dipole – Single Aperture 2m Model
FCC 16 T dipole 4578 dipoles + 5 % spares : 4807 dipole magnets
J.C. Perez on behalf of SMC collaboration team J.C. Perez
11 T dipole coil features and dimensions
DS11 T Transfer function, integral field and coil length
Mechanical stability and QXF coil winding
MBHSP02 test STATUS and first results
the MDP High Field Dipole Demonstrator
Analytical Cost Model (16 T dipole)
Internal review of the 11T dipole reaction fixture and impregnation mould Outcome of the meeting F. Savary 19 October CERN.
MKQXF FEA Model Haris Kokkinos
MQXF updates P. Ferracin October 9th, 2014.
MQXF coil cross-section status
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
Presentation transcript:

CERN MBHSM0101 and Plan for Future Models F. Savary on behalf of the 11T Dipole Project Team

Click here to add footer 2

3 Main design features Single aperture, 6-bloc design 56 turns 22 on IL (4 blocs) 34 on OL (2 blocs) Aperture: 60 mm Coil length: 1.8 m Yoke OD: 510 mm Shell thickness: 12 mm [AISI 304L] One SC coil, ID105

Click here to add footer 4 Specific features Copper coil #101 End spacers CERN v0, longer coil Sc coil #105 Cable OST RRP 108/127 ODS alloy wedges (Oxide Dispersion Strengthening ) CERN V4 end spacers SLS (Selective Laser Sintering) with springy legs - hinge Metallic saddles and splice blocks External trace, glued on coil OD, carrying V-taps and quench heaters Collars and yoke laminations produced by EDM (Electrical Discharge Machining) Collars YUS130S Nippon Steel 3 mm thickness (LHC dipole) Yoke laminations Arcelor Magnetil Low C steel 5.8 mm thickness (LHC dipole)

Click here to add footer 5 Assembly conditions - Winding Winding tension: Coil #101: 300 N; insulation defects: >1 Coil #105: 250 N; insulation defects: 0 Cable insulation Coils #101 and #105: Outer sleeve: AGY S-2 Glass 11 Tex, direct braiding Inner dielectric: Cogebi Firox 80 µ m Mica – Fiber glass tape Winding monitoring during coil #105 production D. Smekens J. Mazet Coils longer than expected: ~20 mm

Click here to add footer 6 Binder curing Binder CTD 1202-X; qty: Coil #101 IL: in excess; OL: in excess; Coil #105 IL: 100 g; OL: 100 g; Shimming: nominal (shimming such that in the press the mid-plane of the cured coil is like in the magnet; 0.12 mm above center axis) This is different compared to FERMILAB where oversized shimming is used to compact the coil mid-plane beyond its nominal position in order to obtain a smaller coil size before entering into reaction With a load of 0.8 MN, the mold is nearly closed (< 0.1mm) Then, a load of 2 MN is used for IL, and 4.2 MN for the OL (complete pole) The stress in the coils may not exceed 37 MPa at that stage D. Smekens J. Mazet

Click here to add footer 7 Reaction treatment Cavity of the reaction fixture is radially bigger than the curing mold by 0.1 mm; and of similar dimension at coil mid-plane Thus, if the curing press can be closed before reaching 37 MPa, the coil cannot be subjected to higher stress when closing the fixture. However, the dry fiber glass, and the tight tolerances induce large friction; also, a possible dimensional problem with the sealing foils could have generated interference between the sealing foil and the baseplate, preventing correct closure of the fixture The tightening torque to close the fixture was of the order of 300 Nm (FNAL applies 110 Nm to 160 Nm) Not clear: no coil contraction after reaction, actually less that 1 mm, when 4.5 mm were expected D. Smekens N. Bourcey F. Lackner

Click here to add footer 8 Reaction treatment – Coil 105 Adjustment of dwell time to compensate the delay between the temperature and tooling temperature The homogeneity of T during ramp up was not very good, ± 9°C. However, it is OK during dwell time N. Bourcey F. Lackner

Click here to add footer 9 Impregnation Resin: CTD 101K Anhydride cured epoxy system with excellent performance at cryogenic temperature, and radiation resistance The resin is preheated, and the coil is impregnated at 60°C 110°C for 5 hours Post curing 125°C for 16 hours R. Gauthier D. Smekens Temperature [°C]Pot life [h] Viscosity [mm · Pa/s]

Click here to add footer 10 Coils size Both coils, 101 and 105, were oversized, only in the mid-plane Best-fit on the outer diameter and the loading plates (interface with pole)

Click here to add footer 11 Excess in mid-plane

Click here to add footer 12 Collaring steps With 8MN the mechanical stops of the collaring tool were in contact

Click here to add footer 13 Shimming plan Mid-plane is 650 µm beyond expectations. To compensate: One layer of Kapton was removed on the mid-plane Changed one layer of insulation to 0.05 µm thickness (in lieu of µm)

Click here to add footer 14 Yoking / welding of the shells F. Lackner Max. charge: 500 t/m on central section to close the welding gap

Click here to add footer 15 FEA Results Collar-nose Stress (MPa) Coil Min Stress (MPa) Coil Max Stress (MPa) Avg Shell Stress (MPa) Collaring Load Post-Collaring Collar in yoke Max Force in Welding Press Shell Weld + Press Force Shell Welded, no Press Force Cool Down (4.3K) Cool Down (1.9K) T

Click here to add footer 16 Bullet gauges loading M. Guinchard P. Grosclaude 8 to 9 kN per bullet

Click here to add footer 17

Click here to add footer 18

Click here to add footer 19 DesignationTypeStrand typeCoil IDStatusNext steps / Remark MBHSM01011 coilCu – 108/ DoneAnalysis MBHSP01011-in-1108/ / – 107 Collaring done 10 days ago Shell welding in early Sept., and cold tests as from middle of Sept. MBHSP01021-in-1132/ / – 109 Winding of 1 st coil done Finish assembly by end 2014, and do testing in Jan. 15 MBHSP01031-in-1PIT – 112 To be done, one cable unit length available Testing in April/May 15 MBHDP01012-in-1108/ /169106/107 – 108/109 To be done as soon as testing of MBHSP0102 is finished No new coil MBHDP01022-in-1108/127 – PIT114106/107 – 111/112 To be done as soon as testing of MBHSP0103 is finished No new coil MBHSP01041-in-1132/ / – 115 To be done as soon as MBHSP0103 is finished MBHDP01032-in-1132/ /169108/109 – 114/115 To be done as soon as testing of MBHSP0104 is finished No new coil