19 Jan 2005IEEE802.3aq Channel model ad hoc Task 2 & 4: Launch Study 1 IEEE802.3aq Channel model ad hoc Task 2 and 4 Launch study Summary of progress 19.

Slides:



Advertisements
Similar presentations
16 Sept 04IEEE802.3aq Channel model ad hoc Task 2: Time variation and modal noise 1 Task 2 update: Time variation and modal noise study.
Advertisements

IMT-Advanced Technical Requirements Summary of status after 22 nd Meeting of WP8F.
Proposed experiments on time- variation due to polarization and MMF shaking and initial results jonathan king 12-Oct-04.
14 Nov 04IEEE802.3aq Channel model ad hoc Task 2: Time variation and modal noise 1 Task 2, November update Time variation and modal noise study Participants.
Context(s)Updates Next Steps.   Task Force created to develop draft (C. Taylor & M. Lee chaired)  Faculty Senate recommends revision to President in.
PSU CS 106 Computing Fundamentals II Product Life Cycle & SW Product Life Cycle HM 9/3/2007.
GEOGLAM Phase-1 Analysis by the CEOS SEO Brian Killough CEOS SDCG-3 Meeting February 7-9, 2013 Sydney, Australia.
19 Jan 2005IEEE802.3aq Channel model ad hoc Task 2 & 4: Launch Study 1 IEEE802.3aq Channel model ad hoc Task 2 and 4 Launch study Summary of progress 19.
NANC Report Numbering Oversight Working Group (NOWG) January 19, 2005 Co-Chairs: Rosemary Emmer, Nextel Karen Riepenkroger, Sprint.
AICT5 – eProject Project Planning for ICT. Process Centre receives Scenario Group Work Scenario on website in October Assessment Window Individual Work.
Standards Report FOLS Meeting – February Overview TIA TR-42 update LAN application update.
ACSP Report – Review of Open Suggestions Nate Davis.
SiTEL LMS Focus Group Executive Summary Prepared: January 25, 2012.
EARTO – working group on quality issues – 2 nd session Anneli Karttunen, Quality Manager VTT Technical Research Centre of Finland This presentation.
15 Dec 2004IEEE802.3aq Channel model ad hoc Task 2: Time-varying study & modal noise 1 Teleconference notes, 5Jan, 2005.
18 Aug 2004IEEE802.3aq Channel model ad hoc Task 2: Time-varying study & modal noise 1 Teleconference notes, 18 August 2004 Jonathan King.
1 Experiments on time-variation due to polarization and MMF shaking and initial results jonathan king 27-Oct-04.
1 Experiments on time-variation due to polarization and MMF shaking and results jonathan king 5th-Nov-04.
17-Sept-041 Amplitude vs frequency for LRM vibration tests based on GR-63-CORE Jonathan King IEEE802.3aq Channel model ad hoc Task 2: Time-varying study.
© ABB Group November 12, 2015 | Slide 1 ICV Implementation in Region ERP- Status update March 2011 & Plan for Go-Live REMSC, 2011.
European Commission - DG Environment Workshop on P&P and NP, September 1-2, Brussels CAFE and the NECD review Stefan Jacobi European Commission, DG Environment,
GEtServices Purchasing Units & Materials Training For Suppliers Request.
15 July 2004IEEE802.3aq Channel model ad hoc Task 2: Time-varying study & modal noise Meeting notes, 15 July 2004 Jonathan King.
Jan, 2001CMS Tracker Electronics1 Hybrid stability studies Multi – chip hybrid stability problem when more then ~ 2 chips powered up -> common mode oscillation.
Slide: 1 CEOS SIT Technical Workshop |Caltech, Pasadena, California, USA| September 2013 CEOS Work Plan Section 6.1 G Dyke CEOS ad hoc Working Group.
Project management Topic 1 Project management principles.
Progress report from VTF Validation Phase 2 and Next Steps DTP-12, 16th January 2013, Geneva
Doc.: IEEE /1145r0 Submission September 2015 Intel CorporationSlide 1 SU-MIMO Configurations for IEEE ay Date: Authors:
Support for the coordination of activities TECHNOLOGY PLATFORMS Taking Account of Strategic Research Agendas in the Research Themes of the FP7 Co-operation.
Strategic Planning January Update. Steering Committee Eight meetings so far, with reviews of data on: O Student achievement O Finance and facilities O.
22 Sept 04IEEE802.3aq Channel model ad hoc Task 2: Time variation and modal noise 1 Task 2 update: Time variation and modal noise study Contributors and.
Update on the MA Task Force on Evaluation of Teachers and Administrators Presented to the Board of Elementary and Secondary Education Associate Commissioner.
25 Aug 2004IEEE802.3aq Channel model ad hoc Task 2: Time-varying study & modal noise 1 Teleconference notes, 25 August 2004 Jonathan King.
12 Jan 2005IEEE802.3aq Channel model ad hoc Task 2 & 4: Launch Study 1 IEEE802.3aq Channel model ad hoc Task 2 and 4 Launch study Teleconference notes,
1 Dec 2004IEEE802.3aq Channel model ad hoc Task 2: Time-varying study & modal noise 1 IEEE802.3aq Channel model ad hoc Task 2: Time-varying study & modal.
15 Dec 2004IEEE802.3aq Channel model ad hoc Task 2: Time-varying study & modal noise 1 Teleconference notes, 15 Dec 2004 Jonathan King.
3 Nov 2004IEEE802.3aq Channel model ad hoc Task 2: Time-varying study & modal noise 1 Teleconference notes, 3 Nov 2004 Jonathan King.
Retail Market Subcommittee Update to TAC May 6, 2004.
12 Aug 04 jonathan kingIEEE802.3aq Channel model ad hoc Task 2: Time variation and modal noise 1 Task 2 update: Time variation and modal noise study.
2 Feb 2005IEEE802.3aq Channel model ad hoc Task 2 & 4: Launch Study 1 IEEE802.3aq Channel model ad hoc Task 2 and 4 Launch study Teleconference notes,
Design and Manufacture and Graphic Communication.
8 Dec 2004IEEE802.3aq Channel model ad hoc Task 2: Time-varying study & modal noise 1 Teleconference notes, 8 Dec 2004 Jonathan King.
4 Aug 2004IEEE802.3aq Channel model ad hoc Task 2: Time-varying study & modal noise 1 Teleconference notes, 4 August 2004 Jonathan King.
Submission doc.: IEEE /0052r1 March 2016 Sho Furuichi, SonySlide 1 Supplemental document for text proposal on amendment to entity operations Date:
SEAD-funded APEC-CAST Project Proposal Solicitation Update 39 th Meeting of the APEC Expert Group on Energy Efficiency & Conservation 28 February 2012.
Fred Sugihwo, Jonathan King
Teleconference notes, 11 August 2004 Jonathan King
Teleconference notes, 21 July 2004 Jonathan King
PHY-CCA Indication doc.: IEEE yy/xxxxr0 Date:
TGba Initial Draft (D0.1) Development Process
Conducting the performance appraisal
Conducting the performance appraisal
Activities of the UNECE-UNODC Task Force on Victimization Surveys
WP7 – COMBINING BIG DATA - STATISTICAL DOMAINS
Further discussion for WLAN Radar
Dissemination Working Group (DWG)
SPDA-1-3-OBS Software Upgrade
Item 11 – Conclusions – ETS 2018 WG meeting
IMT-Advanced Technical Requirements
PHY-CCA Indication doc.: IEEE yy/xxxxr0 Date:
Task Force Household Budget Survey Innovative tools and sources
MU-MIMO Explicit Feedback Dimension Reduction Procedures
Summary: 38th JSTC Meeting Sep 15 & 17, 2010 Kobe, Japan
AICT5 – eProject Project Planning for ICT
Coex Ad Hoc January London Agenda and Report
Teleconference notes, 13 Oct 2004 Jonathan King
Summary of task 2 status following Nov meeting
Summary of GSC-13 IPR WG Meeting
Draft Launch Recommendations for insertion into Table 68-3 rev 0.3
Month Year doc.: IEEE yy/xxxxr0 January 2016
Presentation transcript:

19 Jan 2005IEEE802.3aq Channel model ad hoc Task 2 & 4: Launch Study 1 IEEE802.3aq Channel model ad hoc Task 2 and 4 Launch study Summary of progress 19 Jan 2005 draft revision 1

19 Jan 2005IEEE802.3aq Channel model ad hoc Task 2 & 4: Launch Study 2 Launch Study Participants David Cunningham Piers Dawe Joerg Kropp Jonathan King John Jaeger Sudeep Bhoja Yu Sun please if you wish your name to be added as participant

19 Jan 2005IEEE802.3aq Channel model ad hoc Task 2 & 4: Launch Study 3 Launch study goals Specific inputs to task force on launch conditions and launch testing –in time for January meeting Activities OM1 link simulations and experiments OM2 model development prompted (in task1) OM3 link simulations and experiments –Simulation and experimental results for centre launch and range of OSL (offset single mode) launches, and a universal launch candidate ('Vortex' launch)

19 Jan 2005IEEE802.3aq Channel model ad hoc Task 2 & 4: Launch Study 4 Findings: OM1 and OM3 With connectors - Center launch better for OM3, FDDI fiber slightly better with standard 62.5µm OSL (17µm – 23µm) No connectors - Center launch better for both OM3 and FDDI fiber Similar conclusions from simulation work from other groups (Joerg Kropp and S Botacchi) Supported by experimental data from many others (Joerg Kropp; F Sugihwo & J King; David Cunningham & Simon Meadowcroft; Yuri Vandyshev, Jim Mcvey, Hongyu Deng & Lew Aronson) Multiple launch options per fibre type improves coverage Results from Ewen_1_041215

19 Jan 2005IEEE802.3aq Channel model ad hoc Task 2 & 4: Launch Study 5 Preliminary findings: OM2 OM2 model is under development in task 1 –50µm OSL (10µm - 16µm offset) proposed for primary launch, centre launch as secondary launch, based on reported experience on TIA round robin fibres –to be confirmed with further experiments and simulations pending OM2 model 'Vortex' launch is being explored as a possible universal launch –described in Morris_1_0304 Experiments compared Vortex with CL and OSL on OM1 and OM3: (Yuri Vandyshev et al) –Varies less with connector offsets than CL, comparable to OSL –Compares favourably to OSL for OM1 –Worse than CL for OM3, but may be good enough Simulations of the Vortex launch are in progress and will be reported separately in this meeting (Morris_1_0105) Preliminary findings: 'Vortex' launch

19 Jan 2005IEEE802.3aq Channel model ad hoc Task 2 & 4: Launch Study 6 List of contributions to Launch Study Placeholder - to be completed later today

19 Jan 2005IEEE802.3aq Channel model ad hoc Task 2 & 4: Launch Study 7 Summary Simulation and experimental work on launch options for each fibre type has been carried out –Primary and secondary launch recommendations for each fibre type OM1: OSL, CL OM3: CL, OSL OM2: OSL, CL - to be confirmed with further work –In addition, experimental and simulation work on a potential example of a universal launch has been carried out. An update of simulation results will be given this meeting (Morris_1_0105) Other points of note –Multiple launch options can increase coverage need to understand how/if to specify dual launches in standard - seeking end customer input –Explicit modeling of IPR variation due to dynamic effects is not needed; details of this work will be presented in this meeting (Sun_1_0105) Three tables have been prepared to show the options for specifying launch in the Draft. Each table includes draft encircled flux launch test definitions (implementation non-specific) for primary and secondary launches, and for a 'universal' launch