F2:Management Accounting. Designed to give you knowledge and application of: Section D: Cost accounting techniques D1. Accounting for materials D2. Accounting.

Slides:



Advertisements
Similar presentations
Higher Business Management
Advertisements

Chapter 3 Accounting for Labor.
Piece-Rate System ECONOMIC OF LABOUR & SOCIO-LABOUR RELATIONS Demos of the discipline © Filippova I.H. Time Rate System Remuneration Vladimir Dahl East-Ukrainian.
ACTG 321 Agenda for Lecture 14
Chapter 6 Payroll Section 2 Gross Earnings: Piecework and Commissions © 2012 Pearson Education, Inc. All rights reserved.
COMPENSATION MANAGEMENT
Wage & Salary Administration
1 Productivity Measurement Operations Management.
WELCOME TO Our Presentation. Topic Labor Cost The Workforce Behind This Presentation NameID Sunayan Kanti PaulBBA MD. Mehedi AliBBA
Labour.
Compensation management
1 The Role of the Finance Department Higher Grade Business Management 2009.
Financial and non-Financial Rewards
Standard Costs and Balanced Scorecard
PROJECT ON COST ACCOUNTING TOPIC : LABOUR COST. INTRODUCTION Labour cost is a second major element of cost. Proper control and accounting for labour cost.
LABOUR COSTING.
LABOUR COST Dr Kamlesh Khosla, M. Com., M.A. Economics, Ph.D.
Presentation on Labour cost. Introduction  Labour cost represent the human contribution to production is an important cost factor which requires constant.
LABOUR COSTING Incentives Plans. JOIN KHALID AZIZ ICMAP STAGE 1,2,3,4 ICMAP STAGE 1,2,3,4 ICAP MODULE A,B,C,D ICAP MODULE A,B,C,D MA-ECONOMICS MA-ECONOMICS.
Standard Costs Budget for a single unit
8-1 Fundamental Managerial Accounting Concepts Thomas P. Edmonds Bor-Yi Tsay Philip R. Olds Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights.
CHAPTER 8 Performance Evaluation. The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin 8-2 Learning Objective LO1 To describe flexible and static budgets.
Incentives Session-13. What Is Incentive Pay? Incentive pay links pay (as a reward) to performance – The idea of incentive pay is to create incentives.
Business & Management Methods of Payment How a firms method of paying their workers can influence motivation.
Concept #7.  What do you think you need to know before your first day on the job?
Principles of Cost Accounting 15 th edition Edward J. VanDerbeck © 2011 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated,
INCENTIVE SCHEME FOR WORKSHOP WORKERS
Wages And Salaries What’s the difference?. Contents To answer the question “What’s the difference” the answer is simple… Wages are paid weekly, often.
Do other companies like BMW Group use manufacturing standards to guide performance at their plants? 1.Yes 2.No.
Needles Powers Crosson Principles of Accounting 12e Standard Costing and Variance Analysis 24 C H A P T E R © human/iStockphoto.
: Mrs. Kamlesh.  Standard cost is: A predetermined cost. Used for cost-control. And the technique is known as standard costing.
Cost Accounting (2 nd session) Prof. Amit De. BASIC CONCEPT OF COST ACCOUNTING:  Cost Accounting  Cost Accounting and Financial Accounting Accounting.
Ch 12: Payroll Accounting Ms. Alltucker Accounting II.
© Costing and Control of Labour.
WAGES AND SALARIES lc/pm1. 2 WAGES AND SALARIES It is important that employees are properly rewarded for the work they do. Employers’ ObjectivesEmployees’
AAT Level 3 Labour Overtime/Equivalent Units/Bookkeeping.
INCENTIVE SCHEMES FOR DIRECT & INDIRECT WORKERS
Fundamental Managerial Accounting Concepts Thomas P. Edmonds Bor-Yi Tsay Philip R. Olds Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights.
Incentive Plans.
Chapter 24 Human Resource Planning
Classification of costs Looks at the purpose and types of costs incurred by an organisation.
Labour costs Methods used to calculate costs. Labour costs Labour costs can be made up as: – Basic pay – Overtime – Bonuses Additional costs could be.
PROCESS COSTING CHAPTER - 1. Chapter outcomes  Meaning and nature of process costing  Application of process costing  Fundamental principles of process.
LABOUR AND WAGE ANALYSIS At the end of the unit you will be able to : 1. Explain the procedure of employment and retirement 2. State the causes of employees.
F2:Management Accounting. 2 Designed to give you knowledge and application of: Section D: Cost accounting techniques D1. Accounting for materials D2.
F2:Management Accounting. 2 Designed to give you knowledge and application of: Section D: Cost accounting techniques D1. Accounting for materials D2.
BUSINESS 12 AS MOTIVATION _ 2. REASONS WHY PEOPLE GO TO WORK money Achievement or job satisfaction Belonging to a group Security Self-worth.
Unit 17.  What is motivation?  Why is it important to a business?  What happens in the business if motivation is good?  What can happen in a business.
F2:Management Accounting. Designed to give you knowledge and application of: Section E: Budgeting & Standard Costing E2. Functional budgets E4. Basic.
Unit 19.  Understand the impact on staff of various payment strategies, including time, piece rate, commission, full time versus part-time, freelance.
CPE 3100 Industrial management Wage Payment Systems.
Chapter 3 Accounting for Labor. Learning Objectives  Distinguish between features of hourly rate and piece-rate plans.  Specify procedures for controlling.
Excel Books Human Resource Management (2nd Edition) Dipak Kumar Bhattacharyya Copyright © 2006, Dipak Kumar Bhattacharyya Wages and Salary Administration.
F2:Management Accounting. 2 Designed to give you knowledge and application of: Section D: Cost accounting techniques D1. Accounting for materials D2.
Incentives – Performance linked Pay Part 2. Types of incentive plans.
Variance analysis 1 、 Basic variances 2 、 The reasons for variances 3 、 Operating statements 4 、 Investing variances 5 、 Materials mix and yield variances.
Cost & Management Accounting
Chapter 3 Accounting for Labor.
WELCOME.
Performance Evaluation
LABOUR REMUNERATION & INCENTIVES
Principles of Cost Accounting 15th edition
COSTING & CONTROL OF LABOUR
Paper F2 management Accounting.
PAYMENT SYSTEMS SLIDE 7.
Process Costing The costing method applicable where goods result from a sequence of continuous or repetitive operations or process. Costs are arranged.
Paper F2 Management Accounting
Cost Accounting-I Labor Costs.
Standard Cost Accounting Materials, Labor, and Factory Overhead
Motivating Workers.
Presentation transcript:

F2:Management Accounting

Designed to give you knowledge and application of: Section D: Cost accounting techniques D1. Accounting for materials D2. Accounting for labour D3. Accounting for overheads D4. Marginal and absorption costing D5. Job and batch costing D6. Process costing D7. Service/operation costing

Learning outcomes D2: Accounting for labour  Describe the different remuneration methods: time-based systems, piecework systems and individual and group incentive schemes. [1]  Calculate the level, and analyse the costs and causes, of labour turnover. [1]  Explain and calculate labour efficiency, capacity and production volume ratios. [1]

Accounting for labour cost method Time cards, Time sheets and Job cards The timekeeping department is responsible for recording & maintaining time records, which help in preparing payrolls, control costs, analysis & determination of labour productivity Personnel department  Engagement, transfer & discharge of employee  Remuneration schemes offered to employees of different departments  Maintenance of personal records of employees  Issuing reports to management regarding employees performance, timekeeping, overtime, leave, disciplinary action taken, turnover etc Ways of recording Measuring the time each worker spends in the factory Measuring the time each worker spends on a job Accounting for labour cost method

Description of different remuneration methods Remuneration methods Time-based systems (TS) Piece work systems (PS) Combination of TS and PS

Time-based systems:payment on the basis of time spent on work. Minimum time wages are guaranteed under this system. Time based systems Example of straight time rate system Roger works for 8 hours a day and the wage rate per hour is $6. His daily wages under the time based system will be calculated as: 8 hours x $6 = $48 per day Differential time rate systems Basic time wages paid up to certain level of efficiency Hourly wage rates rise as efficiency increases Straight time rate systems Wages = Hours worked x Wage rate per hour Time-based systems of Remuneration

 Tory produces 100 units, which is more than 100% of the normal output (i.e. 100% of 80 = 80 units). His efficiency = number of units produced by him / normal output x 100 = 100/80 x 100 = 125%.  As a result, he will be paid at the higher wage rate of $11 since as per the policy of the company anyone who produces above 100% of normal output will be paid at a higher wage.  The wages for Tory for the week will be calculated as = $11 x 40 hours = $440 Example for Differential time rate system The normal standard output per week of 40 hours is 80 units. Tory produces 100 units in a week. Calculate his wages under the differential time wages system if the company’s policy is to pay a fixed time rate of $9 per hour if the normal output level is achieved and $11 per hour if output is above 100% of the normal output.

Question A time-based system of remuneration focuses on quality of output rather than quantity of output. A. True B. False Answer The correct option is A. Under a time-based system workmen are paid on the basis of time spent on the work and not on the basis of their output. Workers are not worried about the volume of output and hence quality is the focus.

Piecework systems pay employees based on the number of units they produce. The output level is measured by calculating the number of acceptable completed units produced by a worker. Differential Piecework systems Workers are given a chance to earn a bonus / incentive as their productivity increases Hourly wage rates rise as the efficiency increases Straight Piecework systems Wages = Number of acceptable units produced x Piece rate per unit Merrick differential piece rate system The Merrick differential or multiple piece rate system provides for three differential rates as follows: Wage rates under the Merrick differential piece rate system Up to 831/3% (83.33%) of efficiency Normal piece rate applicable Above 831/3% but up to 100% 10% above normal piece rate Above 100% 20% above normal piece rate Differential Piecework systems include Merrick system and Taylor system Piecework systems

An example of this type of system is the Gantt task bonus system. The remuneration under this method is calculated as follows: 120% of ordinary piece rateOutput above standard Bonus of 20% (usually) of time rateOutput at standard Time rate (guaranteed)If output is below standard PaymentOutput Combination of TS and PS Workers are generally guaranteed minimum time wages for the hours worked An additional amount is paid if the worker exceeds the minimum standard output  Both the time rate system and the piecework system have deficiencies.  These deficiencies are overcome by adopting schemes that are a combination of time rate and piecework systems. Combination of time and piece rate

Labour turnover Rate at which individuals move in & out of organisation Costs of labour turnover Preventive costs: Incurred to reduce labour turnover Replacement costs which arise due to high labour turnover Level, costs & causes of labour turnover Refer to Learning Outcome 5 on D2.20 Causes of labour turnover Unavoidable  Better prospects elsewhere  Early retirement due to ill health  Disciplinary action against employees  Business is seasonal Personal reasons Avoidable  Lack of job satisfaction  Low payment, not in line with industry standards

 Needs to be measured in every organisation in order to know if the available labour resources are being utilised efficiently  This happens when a higher number of units are manufactured in the same number of hours Productivity is of immense importance in any organisation since it is a tool for reducing cost. An increase in productivity alone could also reduce costs. Labour productivity

Labour ratios: Help compare actual performance with budgeted performance Labour ratios Labour efficiency ratio: Measures the efficiency level of employees Labour capacity ratio: Measures ratio of actual hours worked, compared to budgeted hours Production volume ratio: Measures standard hours of work produced, compared to budgeted

RECAP  Describe the different remuneration methods: time-based systems, piecework systems and individual and group incentive schemes?  Calculate the level, and analyse the costs and causes, of labour turnover?  Explain and calculate labour efficiency, capacity and production volume ratios?