Madrid 16 th February 2009 TSOs presentation 8 th IG meeting.

Slides:



Advertisements
Similar presentations
Madrid, 29 th January th RCC Meeting South Gas Regional Initiative.
Advertisements

1 In France, new capacity is developed and allocated via open season procedures The GGPOS establish how an open season should be conducted To compete with.
Madrid, 13 th November th SG Meeting South Gas Regional Initiative.
Paris, 14 th December th IG Meeting South Gas Regional Initiative.
15 th September 2013 Enagás and TIGF Information to NRAs.
Madrid, 27 th October th IG Meeting South Gas Regional Initiative.
Madrid, 17 th February th IG Meeting South Gas Regional Initiative.
CMP PROPOSAL FOR HARMONISATION 17 th IG meeting Madrid 2 nd November 2011.
Lessons from open seasons between France and Spain Regulator’s perspective Benoît Esnault Commission de Régulation de l’Energie (CRE) North West region.
Madrid, September 23 rd th SG Meeting South Gas Regional Initiative Open Season for future capacity.
1 Open Season Development of new capacities between France and Luxembourg NW-GRI, September - 21 st, 2010.
Madrid, 6th February nd SG Meeting South Gas Regional Initiative.
9th SG Meeting South Gas Regional Initiative 15th July 2009, Madrid.
French Working Group Evolution of the contractual structure of the gas transportation network South Gas Regional Initiative 8th IG Meeting – 16th February.
26 th IG meeting 23 th January 2014 Enagás, REN and TIGF Issues to be discussed.
15 November th SG meeting Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms.
7 th IG meeting, South Gas Regional Initiative Madrid, 10 th July 2008 Consultation on Requirements for Gas Interconnection Capacity between Spain and.
Madrid 15 th July 2009 OS for the development of new gas interconnection capacity between Spain and France after th SG meeting.
Madrid, 16th February th IG Meeting South Gas Regional Initiative.
Deliverable I.4 Cross-border balancing model among TSOs -BALIT project- (7 th SG SWE, Lisbon, December 3 rd 2013)
Paris, 18th May nd RCC Meeting South Gas Regional Initiative.
Madrid, 1 st April 2008 Offering of capacities under the OSP.
Paris, 16 th March th SG Meeting South Gas Regional Initiative.
France – Spain open season Results Lessons learned.
Madrid, 11th February th IG Meeting South Gas Regional Initiative.
XV Madrid Forum, 6-7 November 2008 Gas Regional Initiative Progress and challenges.
French transport structure SG meeting Madrid – 15 July 2009.
Gas Regional Initiative – North West Region IG meeting The Hague – 25th March, 2009 Open Seasons Coordination Marie-Claire AOUN – CRE
Madrid, April 1 st th SG Meeting South Gas Regional Initiative Working Group 4B : Open Seasons.
PROPOSAL CAM PROPOSAL FOR HARMONISATION 14 th SG meeting Madrid 11 th July 2011.
Madrid, 12 th April th IG Meeting South Gas Regional Initiative.
OS 2015: next steps Proposals and agreements by TSOs 12 th IG meeting Paris 14 th December 2009.
Madrid, 27 October 2009 South Gas Regional Initiative Open Season France-Spain Validation of the results.
Madrid, 7 th May th SG Meeting South Gas Regional Initiative.
CMP PROPOSAL FOR HARMONISATION 16 th IG meeting Madrid 6 th May 2011.
1 Open season th IG Meeting 26 th March 2010 Paris.
Madrid, 15th June rd SG Meeting South Gas Regional Initiative.
10 th SG meeting Madrid 13 th November Index Capacities – Results Capacities – Further steps Capacities – Further steps.
8th SG Meeting South Gas Regional Initiative 27th April 2009, Paris.
Madrid, 23rd July rd IG Meeting South Gas Regional Initiative.
6th Stakeholder Group Meeting Stockholm - 26 November, 2009 Gas Regional Initiative – North West Region Experience with coordinated o pen seasons Dominique.
Gas Regional Initiative Region North-West Transparency Project Nicola Meheran, Ofgem.
25 th IG meeting 13 th December 2013 Enagás, REN and TIGF Issues to be discussed.
Madrid, 1 st April 2008 Proposal for the commercialisation of existing and committed capacity at the cross border point of Larrau between France and Spain.
Madrid, May 21 st th SG Meeting South Gas Regional Initiative Working Group 4B: Open Seasons.
Madrid, 1st April th SG Meeting South Gas Regional Initiative.
OS 2015: Information Memorandum Draft proposal 12 th SG meeting Madrid 7 th May 2010.
Madrid 15 th June 2009 OS Agreement to Reserve Capacity 10 th IG meeting.
Capacity Allocation Mechanism Iberian overview 13 th SG meeting Madrid 7 th Feb 2011 DRAFT – Portugal / Spain.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
OS 2015: Allocation Rules Proposal by TSOs 11 th SG meeting Paris 16 th March 2010.
Madrid, 15th June rd SG Meeting South Gas Regional Initiative TSOs’ report 2013/2015 – Main Findings.
Madrid 24 th March 2009 OS Working Progress 9 th IG meeting.
GRTgaz North  South Link Capacities Sales Organization Considering Future France – Spain Developments 5 th SG meeting of S-GRI in Madrid.
1 CRE proposal on how to allocate capacity according to the Joint Enagas, TIGF and GRTgaz investment plans: points that have been agreed / still need to.
CMP PROPOSAL FOR HARMONISATION Madrid 11 th July 2011.
1 24 th November 2015 Videoconference 34 th IG Meeting South Gas Regional Initiative.
Madrid, 23rd Sep th SG Meeting South Gas Regional Initiative OSP and Interoperability.
Gas Regional Initiative – North West Region Stakeholders Group meeting - London 14 November, 2008 Capacity Workshop Coordinated Open Seasons Marie-Claire.
21st IG Meeting South Gas Regional Initiative
Capacity allocation in natural gas transmission networks Pilot framework guideline - Public consultation results and new content of guidelines - Dr.
25th IG meeting 13th December 2013
Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
26th IG meeting 23th January 2014
2nd SG Meeting South Gas Regional Initiative TSOs’ report 2010/11 – Main Findings Madrid, 6th February 2007.
Results of the First Phase of the OS 11th IG meeting
Gas Regional Initiative
26th February 2015 Teleconference
26th February 2015 Teleconference
Presentation transcript:

Madrid 16 th February 2009 TSOs presentation 8 th IG meeting

2 Public Consultation – CRE and CNE conclusions  Willingness of the TSOs to comply with the ambitious NRA’s Calendar.  The TSOs understanding of the NRA conclusions as follows: QUESTION CRE and CNE Conclusions Transportation scheme Eastern axis (EA) No majority either for the three-steps option or for the direct link Majority would agree with a solution based either on a mix between the two options or on an increased cooperation between TIGF and GRTgaz Tariff Structure Regulators will ensure that no undue distortions occur between the EA and the WA because of tariff differences. To enhance tariff visibility, tariff principles for the interconnections will be established on a basis of transparency, cost-reflectivity and non-discrimination between national transmission and transit. Tariff principles and setting rules will be published in advance. Open Season (OS) 2013/2015 The binding phase of the OS/WA (2013) and the non-binding phase of the OS/EA (2015) should be launched at the same time. For the non-biding phase OS/EA (2015), shippers will have the possibility of making conditional bids, subject to results in OS/WA (2013). Capacity allocation methodology Best priority will be given to commitments > 10 years Part of the available capacity will be reserved for short term contracts Two allocation rounds in the binding phase (allowing shippers to partially/totally renounce the capacity allocated)

3 Work to be done by April 22nd  In order to comply with the NRAs calendar : NRAs decisions required:  Definition of tariffs principles (visibility) before launching the OS 2013 and OS 2015  French OSP’s to be redesigned  Resolution by the Ministry in Spain TSOs have to produce a set of documents:  Information Memorandum detailing:  Capacity products proposed by the TSOs in each OS  Amounts on offer and availability date for each product  Precise calendar for each phase of the OSs  Submission forms and Commercial contracts:  Confidentially agreement between TSOs and Shippers  Request letter and Request forms (binding, non-binding)  Priority and allocations rules  Booking contract for the capacities to be developed / Transmission contract  Memorandum of understanding between TSO (decisions and investments projects) Shippers’ views in line with procedures proposed on April SG  Feedback from previous open-seasons in the NW-GRI  Joint Fluxys-GRTgaz open-season

4 Work under progress  Capacity type and amount  Only firm available capacities will be sold in the OSs  All (long term) firm capacities to be made available will be sold though the OSs procedure  The marketable capacity sold in the OS will be sum of the existing, available capacity and the OSP capacity  Multi-annual and multi-seasonal capacities will be sold separately in the same OS  The amount of capacity offered on a long term basis will be constant  The Multi-annual capacity will start in April of each year  Duration of contracts  Split Long/Short term capacity (80-20%). There is a trade off between the amount of capacity sold at short term and the term required to pass the economical test  Priority will be given to commitments for 10 years and more  Maximum duration of the contract?  Requests and Allocations rules  One single request for all TSOs per point  Same procedure as the OSP Larrau  Pro-rata between requests with same priority (starting date and duration)  Priority will depend on the starting date and duration  Priority of request for Energy corridors / independents Interconnection points?  Different contracts will be signed with each TSO involved

Madrid 16 th February 2009 FRANCE-SPAIN Interconnection Infrastructures & Capacities Development Overview

6 Background This report summarizes the contents of documents agreed by TSO´s: “Addendum to TSO report dated 6 th Feb 2008” refer to LARRAU IP and Artère de GUYENNE “Development of a new interconnection between France and Spain by 2013/15: MidCat Project” (May 16th 2007) Review EUSKADOUR Capacity South SG/DD/5. Addendum to TSO report dated 6th_february_2007 ERGEG.ppt regulators.eu/portal/page/portal/EER_HOME/EER_INITIATIVES/GRI/South/Meetings1/IG_meetings/7supthsup%20South%20IG/DD/2.1.2.%207th%20IG% 20South%20GRI_TSOs%20presentation_OS.ppt regulators.eu/portal/page/portal/EER_HOME/EER_INITIATIVES/GRI/South/Meetings1/SG_meetings/3rd_South_SG/DD/3rd%20SG%20South%20GRI% %20TSOs%20Report.pdf

7 Western Corridor Eastern Corridor Projects

8 WESTERN CORRIDOR: Evolution Technical CAPACITY after OS 2013 EUSKADOUR LARRAU Artère GUYENNE

9 WESTERN CORRIDOR: Capacities to be Marketed (1)Currently, from 1st April 2013, the total technical capacity (230GWh/d) is not booked but dedicated to be marketed by short (1 year) to medium (2, 3 or 4 years) term OSP procedures, fixed by CRE. According to these rules, capacities will be marketed 6 months before the beginning of the period in question. The figures here suppose that CRE would adapt this rule in order to allow marketing of a part of existing capacity in coordination with OS. (2)Currently, from 1st April 2013, 142GWh/d is not booked but dedicated to be marketed by short (1year) to medium (2, 3, or 4 years) term OSP procedures, fixed by CRE. According to these rules, capacities will be marketed 6 months before the beginning of the period in question. The figure here supposes that CRE maintains these rules because of congestion North >South.

10 FULL DEVELOPMENT: Evolution Technical CAPACITY after OS 2013 after OS 2015

11 FULL DEVELOPMENT: Capacities to be Marketed (3)Depending on level of short term capacity decided by CRE, capacity proposed to the market would vary between 210 and 380GWh/d. (4)Capacity at the GRTgazNorth-GRTgazSouth link might be impacted by other entry points to the GRTgazSouth zone, in particular Fos. A detailed description of the different development options should be presented in the Info Memo. No capacity at the GRTgazNorth-GRTgazSouth link should be dedicated to any entry or exit point. Every procedure, OS or OSP, will be open for every shipper and every need.