Introduction to Procurement for Public Housing Authorities Competitive Proposals.

Slides:



Advertisements
Similar presentations
Office of Purchasing and Contracts Research Funded Procurement Outreach Training Level III Procurements $50,000 and Above.
Advertisements

Procurement Management
GSA Public Buildings Service How to Submit a Proposal.
Request for Proposal - Best Value Generally RFP’s are created for large dollar technical purchases, services and consultants.  Consideration in addition.
November 19, 2013 Preparing a Successful RFP to get Desired Results.
Presented by: Kathryn Hodges, NH
Gene Shawcroft, P.E. Central Utah Water Conservancy District April 29-30, 2013.
Multi-Stage Bidding.
Source Selection and Contract Award
1 Basics of Government Contracting. Federal Procurement Background The U.S. Government is the world’s largest purchaser of goods and services 2.
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
1 Last update: February 12, 2009 Is Your Selection Process Attracting the Right Consultants? Best Practices, Benefits and Insights to Using a Qualifications.
RFP PROCESSES Contracts for Professional Services.
Getting Certified In Consultant Selection Steps and Processes Diana Foster.
Procurement of Consultancy Services. 2 Differences between.
Marcy Mealy Procurement Specialist CDBG Program
Vendor Engagement Tips. Pre-solicitation Discussion 2  Review Federal Acquisition Regulation Subpart ” Exchanges with industry before receipt of.
The Threshold Has Changed: Now What Should I do? Presented by Jan Giffin, CPPO, CPPB, VCO Procurement Management Account Executive, DGS/DPS.
PROCEDURES FOR SELECTING THE CONTRACTOR
THE EVALUATION PROCESS FOR RFP’S: THE DIFFERENCE BETWEEN THE ARCHITECTURAL RFP AND A GENERAL SERVICE RFP TREENA BRADLEY, ROOSEVELT ELEMENTARY SCHOOL DISTRICT.
Office of Business Development Training
Partnership Agreements Delegation of SBA’s Contract Execution Authority to other Federal Government Agencies.
1 CDBG Procurement Requirements For Local Officials.
WELCOME TO THE PROCUREMENT SEMINAR Procurement and Contracts An Overview of Contract Administration.
Washington Metropolitan Area Transit Authority Pre-Proposal Conference Sourcing and Contracts Management System (CMS) Solution Request for Proposal FQ
Using QBS A Qualifications-Based Selection Process Presenters: Ron Brenke, PE - QBS Manager.
A SOUND INVESTMENT IN SUCCESSFUL VR OUTCOMES FINANCIAL MANAGEMENT FINANCIAL MANAGEMENT.
School District Purchasing. Purchasing Authority Arizona Statutes Arizona Statutes Arizona Administrative Code Arizona Administrative Code  Primary source.
The Importance of the Qualifications Based Selection (QBS) Process
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
Design Build, Job Contracting, or Construction Manager at Risk In early 2000 the legislators added an alternate way to accelerate construction project.
Purchasing Overview. Fundamentals of Purchasing Procedures.
Developing and Issuing the RFP. Why should qualifications be your procurement focus? n Having the necessary range of capabilities is more important than.
United Nations Procurement Division
Consultants' Competitive Negotiation Act Acquisition of professional architectural, engineering, landscape architectural, or surveying and mapping.
Advanced Project Management Project Procurement/Contract Management Ghazala Amin.
1 Procurement. 2 Overview Every municipality should keep procurement records that allow an auditor or other interested party to track the specific nature.
PUBLIC PURCHASING IN FLORIDA ROLES IN THE PURCHASING PROCESS (rev. 05/27/2008)
UNDP Bangladesh Procurement Fair Objectives of the Fair; - UNDP Procurement principles; - Procurement plan ; - UNDP Procurement Roadmap;
Elevating the Quality of Life in the District Contracting and Procurement Division Information Session 2 Request for Proposal November 5, 2015.
College of Engineering CIVE 4750 Using QBS A Qualifications-Based Selection Process Adapted from a presentation by QBS, Inc. 215 N. Walnut St. Lansing,
Contracting Process Overview Agenda Item #12 July 2007.
JEOPARDY PROCUREMENT EDITION Methods StandardsMystery ProceduresRegulations Q $100 Q $200 Q $300 Q $400 Q $500 Q $100 Q $200 Q $300 Q $400 Q $500 FINAL.
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
Introduction to Procurement for Public Housing Authorities Sealed Bids Unit 5.
Introduction to Procurement for Public Housing Authorities Independent Cost Estimates and Cost/Price Analyses Unit 3.
Introduction to Procurement for Public Housing Authorities NonCompetitive Awards Unit 7.
1 Timothy Sullivan Thompson Coburn LLP 1909 K Street, N.W., Suite 600 Washington, DC (202)
Introduction to Procurement for Public Housing Authorities Procurement Planning: Choosing a Contracting Method Unit 2.
Introduction to Procurement for Public Housing Authorities Getting Started: Basic Administrative Requirements Unit 1.
Introduction to Procurement for Public Housing Authorities Cooperative Purchasing, Intergovernmental Agreements and Joint Ventures Unit 8.
Introduction to Procurement for Public Housing Authorities Small Purchase Procedures Unit 4.
Elevating the Quality of Life in the District. Debriefing Procedures Department of General Services Contracting and Procurement Division Policy, Research,
Solicitation VA69D-16-R-0583 Rehab Renovation Pre-Proposal Conference June 22, :00am CDT NCO 12 Great Lakes Acquisition Center.
1 Office of Procurement Presents Request for Proposal (RFP) Process.
Processes and Procedures for Contracting at UO
Light Rail Transit Project
Processes and Procedures for Contracting at UO
Award Management Services
CDBG Procurement Date of Session, 2017 Washington, DC Brian Delvaux
Request for Proposal - Best Value
Department of Community Development
Contracting by Negotiation Process Map – Part 15 (1 of 3)
What PIs working on federally sponsored projects need to know.
“How We Do Business”.
THE OFFICE OF PROCUREMENT CONTRACT TRAINING MAY 2018
What PIs working on federally sponsored projects need to know.
Request for Proposal - Best Value
Procurement.
OCPS CCNA SELECTION COMMITTEE TRAINING
Presentation transcript:

Introduction to Procurement for Public Housing Authorities Competitive Proposals

Learning Objectives Understand when to use the competitive proposal method of procurement Understand the basic process and requirements for awarding contracts under the competitive proposal method Understand the difference between the two types of competitive proposals: Requests for Proposals and Requests for Qualifications 2

Proposals Competitive Proposals ▫The market supports adequate competition  Allows for negotiated procurement that considers factors other than price using proposals solicited from multiple offerors 3 Noncompetitive Proposals ▫The market does not support competition  Single or sole source items/services  Emergencies and Public Exigencies  HUD authorizes &

Competitive and Noncompetitive Proposals 4

When to use Competitive Proposals… 1.Conditions require the use of the method, such as unclear or incomplete specifications 2.The nature of the work requires evaluation of technical merits in addition to price 3.Cannot award a firm fixed-price contract (e.g., Sealed Bid) 4.The work lends itself to different approaches 5.There are 2 or more qualified offerors in the market 6.The cost estimate is more than the $100,000 Federal regulatory threshold or a lower dollar limit specified in the PHA’s Procurement Policy 5

The Competitive Proposal Process 1.Advertise & receive proposals (RFP/RFQ) 2.Evaluate proposals, with or without price as a factor 3.Negotiate the price, if applicable 4.Award the contract to the top ranked entity, price considered! 6 SolicitEvaluateNegotiateAward

Two Types of Competitive Proposals Qualifications-Based Proposals  Identified as Request for Qualifications (RFQ)  Procedure can only be used for the selection of Architecture/Engineering professional services or Mixed-Finance Developers  Price is not considered as a selection factor! 7 Competitive-Based Proposals  Identified as Request for Proposals (RFP)  Used for procuring professional and consulting services, including Architecture/ Engineering (A/E) professional services  Price is considered as a selection factor!

Issuing Requests for Proposals (RFP) Develop a detailed Statement of Work Develop/reassess the Independent Cost Estimate Develop the applicable Evaluation Factors, including price, and the award criteria Publicly advertise the RFP ▫Local, state and national newspapers, trade periodicals, etc. ▫Mail advertisement to potential entities or firms Hold a pre-proposal conference, if deemed necessary Issue addenda, if necessary Receive proposals ▫Time-date stamp and safeguard ▫Do not open publicly! 8

Evaluating RFPs: Rating and Ranking Draft evaluation factors and scoring range - customized to proposal - before solicitation is advertized Develop rating and ranking forms to summarize criteria Identify evaluation committee and chairperson Hold meeting to discuss procedures to follow Use whole numerals for scoring range ▫Example for 20 point scale:  15 to 20 points: Excellent  10 to14 points: Good  0 to 9 points: Poor 9

More on Rating and Ranking Sample Evaluation Factors 1.Evidence of experience and ability to perform task specified under solicitation 2.Capability to provide service in a timely manner 3.Knowledge of applicable Federal, State and local laws, and regulations 4.Fee schedule for task 5.Licensing requirements 6.Other rating criteria, as necessary Final Ranking Identification ▫Acceptable ▫Capable of being made acceptable ▫Unacceptable 10

Evaluating RFPs: Technical Evaluation Committee/Panel Sample Procedures for Evaluation Committees (See Appendix 8 in the PHA Procurement Handbook) ▫Made up of at least 3 members (or a greater odd number) ▫Members identified by Contracting Officer ▫Panel members must identify any conflict of interest related to RFP/RFQ and, if necessary, recuse themselves ▫Independent panel ▫Confidential decisions  See Appendix 9 in the PHA Procurement Handbook – Certification of Nondisclosure 11

Evaluating RFPs Based on the method identified in the advertised RFP, the Evaluation Committee evaluates and ranks proposals using one of two methods: ▫Price is part of the initial evaluation factors – 1 step process  Points are assigned to price based on its relative importance to the points assigned to the other technical factors. ▫Price is secondary and part of final evaluation – 2 step process  A technical evaluation of the qualification factors, excluding price, is done first.  A final evaluation considering price is completed last. The Evaluation Committee issues the Evaluation Report ▫Lists the final ranking of the offerors by technical merit, including price. 12

More on Evaluating RFPs: Negotiation Evaluation Committee develops the negotiation objectives to be used by the Contracting Officer in the reassessment of proposals. Contracting Officer determines the limit of the competitive range (the “cut-off”) and either… ▫Proceeds to negotiate with the best ranked offerors, or ▫Awards contract to top ranked offeror without negotiations – provided such procedure is clearly outlined in the RFP, and the contract file contains the rationale for such action. Negotiation: exchanges between the PHA and offeror(s) which allow clarification of unclear issues, improvement of weaknesses, correction of deficiencies, etc., and an opportunity to revise the proposal. 13

Evaluating RFPs: Round 2 – After Initial Negotiations After initial negotiations are complete, the Contracting Officer (CO) notifies the entities within the competitive range to submit best and final offers …a second round! CO receives best and final proposals. Evaluation Committee performs a second technical evaluation of re-submitted final proposals and makes a final recommendation via an Evaluation Report. CO either selects the top-ranked provider or, if needed, performs second round of negotiations/discussions with selected offerors in the final competitive range. CO accepts the most advantageous proposal. CO must justify the determination in writing and ensure that the successful offeror is responsible. 14

A bidder/offeror that has the ability to perform successfully under the terms and conditions of the proposed contract/agreement ▫Per §85.36(d)(3)(iv), Awards will be made to the responsible firm whose proposal is most advantageous … In determining responsibility, the PHA’s Contracting Officer shall consider the bidder’s ▫Satisfactory record of integrity & business ethics ▫Compliance with public policy ▫Performance record & experience ▫Financial & technical resources 15 Responsible Contractors

Issuing the Award  Obtain Board of Commissioner approval, if required  Conduct pre-award conference, if required  Obtain Contracting Officer’s approval of the contract award  Execute contract –all parties  Notify unsuccessful offerors  Administer and manage the contract per established procedures 16

Issuing Requests for Qualifications - RFQs Used only for the selection of Architecture/Engineering firms or Mixed-Finance Developers or when authorized by HUD ▫Includes joint venture partnerships for development purposes The RFQ includes only technical qualification statements related to the project being procured The evaluation process is similar to the one outlined for RFPs except there is no factor for price ▫Price is negotiated after the best qualified entity has been selected! 17

Once a competitive range is established based on technical factors, the Contracting Officer negotiates with the top- ranked firm to reach a fair and reasonable price. If an agreement cannot be reached, negotiations are terminated with that entity and the Contracting Officer starts negotiations with the next highest ranked entity. ▫This process is repeated as necessary until a contract is awarded. ▫Once negotiations have been terminated with a firm, the PHA cannot reopen negotiations with that firm even if the next lower ranked offeror is higher in price! More on Issuing RFQs 18

If a PHA receives less than 3 proposals, it must first evaluate them before deciding what to do: ▫If 2 proposals—either proceed to award or reject all and start over. ▫If only 1 proposal—HUD approval must be obtained before award since it becomes a noncompetitive (e.g., sole source) procurement. More on Issuing RFQs 19

General requirements for Competitive Proposals Evaluation Factors and their relative weight must be included in the RFP/RFQ and referenced in the advertisement. The PHA must establish an Evaluation Committee to review technical factors. Price is always a factor but it may or may not be a weighted evaluation factor. Where price is part of the scoring process, a Price or Cost Analysis must be part of the evaluation report issued by the Evaluation Committee. Profit must be negotiated as a separate element of the contract. 20

21 Required Forms for Competitive Proposals Attachments to Solicitation (Non-Construction and A/Es) ▫HUD-5369-B, Instructions to Offerors Non-Construction ▫HUD 5369-C, Certifications and Representations of Offerors Non-Construction Contract Attachment to Contracts for Non-Construction: ▫HUD-5370-C, General Conditions for Non-Construction Contracts (either Section I or both Sections I and II) HUD A/E Agreement Form ▫HUD-51915, Model Form of Agreement Between Owner and Design Professional Attachment to AIA B model A/E contract ▫HUD A, Contract Provisions Required by Federal Law or Owner Contract with the U.S. Department of Housing and Urban Development

Competitive Range Example (RFP) Independent Cost Estimate = $325,000 22

23 Competitive Range Example (RFP) Independent Cost Estimate = $325,000

24 Competitive Range Example—Final Selection Independent Cost Estimate = $325,000

Remember… RFQ method only used for A/E services, Mixed-Finance Developers or when HUD authorizes Price is not a selection factor when using RFQ method ▫Negotiate price after ranking respondents based on technical factors Include evaluation factors and relative weight in RFP/RFQ advertisement Negotiate! 25

References and Resources 24 CFR 85.36(d)(3) PHA Procurement Handbook REV 2 - Chapter 7 For HUD’s Limited Denial of Participation List, visit 26