The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jan 25, 2016.

Slides:



Advertisements
Similar presentations
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Aug 6, 2012.
Advertisements

CALICE WHCAL testbeam at SPS H8 27 sep – 03 oct: 6 days for energies up to 180 GeV (+ polarity)
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Analysis of chip with 100 events, July 2001 Variation in pixel to pixel average ADC values (fixed pattern noise) Pixel ADC value event to event repeatability.
MOM Summary 19/01/10 Water Now the ice has cleared I am able to get on the roof again. Could do with getting the conductivity readings fed back similarly.
Far Detector Data Quality Andy Blake Cambridge University.
SpillServer and FD neutrino events As part of my CC analysis studies, I have been attempting to isolate beam neutrino candidates in the FD using both scanning.
Y. Karadzhov MICE MICO First EMR Plots 1.EMR detector has been successfully incorporated in the MICE DAQ system. 2.First 3 days of data taking in MICE.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 14 September, 2009.
The Design of MINER  A Howard Budd University of Rochester August, 2004.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jun 20, 2011.
Antiproton Lens Replacement (Unfortunately Part 2) Keith Gollwitzer Antiproton Source Department for the Experts and Mechanical Support Department Target.
Deadlocks in Distributed Systems Deadlocks in distributed systems are similar to deadlocks in single processor systems, only worse. –They are harder to.
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jun 4, 2012.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester April 1, 2013.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
Run Coordinator Weekly Report EG6 Commissioning October Raffaella De Vita.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Aug 5, 2013.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 17, 2013.
All Experimenters’ Meeting February 09, Accelerator Operation Summary Calendar Week # 06 NuMI Weekly Integrated Intensity 6.69 E18 protons Beam.
The Design and Performance of the MINER A Detector Howard Budd, University of Rochester Technology and Instrumentation in Particle Physics 2011.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
06/04/2012Steve Hahn — AEM Meeting1 MINOS Status Report Rack cleanup –All racks vacuumed –All filters cleaned –Wiener power supply/chassis checked for.
Muon Identification in the MINOS Calibration Detector Anna Holin 05 December 2005 University College London.
Dmitri Denisov D0 Weekly Summary: August 18 to August 24  Delivered Luminosity and operating efficiency u Delivered 6.9pb -1 u Recorded 6.0pb -1 (87%)
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Sep 26, 2011.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Mar
The Meson Test Beam Facility Erik Ramberg LRP Meeting – Oct. 30,2003 Delivering MI beam to MTBF User area layout Operational characteristics Detectors.
17 February All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 February Dedicated some.
CAL SHIFT MARCH 2004 Thomas Schörner-Sadenius Hamburg University CAL Meeting DESY 24 March 2004 Think carefully whether you consider being on shift.
PDT’s  Control Board DSP Software (Sten,HH) u Updated so as to include the wire-length in the module data  Readout u All 6 crates in global run. u 90/94.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Oct 17, 2011.
NuMI/MINOS Status All Exp. Mtg. June 2, 2008 Jim Hylen/FNAL Page 1 FAR DETECTOR: 98.0% live time (wall clock) There was a power outage on the morning of.
7 Feb 2005T. Yasuda, Fermilab D0 Status Report 2/7/2005 Taka Yasuda Fermilab.
UCLA group meeting1/11 CSC update – a 2-week summary Status of CMS at LHC: L=2*10 32 reached 25-Oct-2010 (=the original goal for 2011) and 42 pb -1 collected.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
First Look at Data and MC Comparisons for Cedar and Birch ● Comparisons of physics quantities for CC events with permutations of Cedar, Birch, Data and.
All Exp Mtg Apr 21, 2008 NuMI-MINOS Status Report – Alec Habig FAR DETECTOR: 99.7% live time (wall clock) 99.9% (pot weighted) Annual hoist inspection.
March 18, 2008 TJRMICE Beamline Status1 MICE Beamline Status (March 18, 2008) Tom Roberts Muons, Inc. Illinois Institute of Technology.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 24, 2013.
MINER A Operations Report All Experimenters’ Meeting Steve Hahn, FNAL July 1, 2013.
1/5 ECAL/HCAL Front-end status Calorimeter Meeting Frédéric Machefert Wednesday February 9 th, 2011.
All Experimenters’ Meeting January 26, Accelerator Operation Summary Calendar Week # 03 NuMI Weekly Integrated Intensity 2.74 E18 protons Beam.
FNAL All Experimenters Meeting January 7, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Progress Dec 17, 2001 – Jan 7, 2002  Reasonably.
All Experimenters MeetingDmitri Denisov Week of September 9 to September 16 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 4.0pb.
All Experimenters MeetingDmitri Denisov Week of September 2 to September 8 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.9pb.
Tracker Cosmic Ray Test 2011 Linda R. Coney UC Riverside CM 29 - February 16, 2011.
Detector Summary Tracker. Well, as far as the tracker hardware is concerned, we are done. – Need to do the system test to make sure nothing has degraded.
1 Status of the T2K long baseline neutrino oscillation experiment Atsuko K. Ichikawa (Kyoto univeristy) For the T2K Collaboration.
Summary of User Requirements for Calibration and Alignment Database Magali Gruwé CERN PH/AIP ALICE Offline Week Alignment and Calibration Workshop February.
MINOS Coll Meet. Oxford, Jan CC/NC Data Cross Checks Thomas Osiecki University of Texas at Austin.
NUMI NUMI/MINOS Status J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
All Experimenters MeetingDmitri Denisov Week of July 22 to July 29 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.1pb -1 u Live:
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
1M. Ellis - MICE Tracker PC - 1st October 2007 Station QA Analysis (G4MICE)  Looking at the same data as Hideyuki, but using G4MICE.  Have not yet had.
Piquet report (07/Aug/ /Aug/2012) D. Pinci.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Mar 30, 2015.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Feb 24, 2014.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Sep14, 2015.
HB2008 – WG F: 27 Aug. S. Childress – Diagnostics_2MW 1 NuMI Beam Diagnostics and Control Steps to 2 MW S. Childress Fermilab.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Oct 14, 2013.
Minerva Test Beam 2 Status Geoff Savage for the Test Beam 2 Team March 23, /23/2015AEM - Minerva Test Beam 2 Status1.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Feb 8, 2016.
Doubling the Target Insertion Rate P J Smith for MICE VC 163.
TAB-To-L3(Tape) ● At the L1Cal2b sidewalk test stand we have a setup to transmit the data coming from detector to tape using the new system. ● We installed.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 3, 2013.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Dec 9, 2013.
Presentation transcript:

The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jan 25, 2016

Data Live Time – Jan 7, 2016 to Jan 20, ×10 19 POT MINERvA 73.7% MINERvA*MINOS 72.6% As will be described later some, ~7%, of the data for Jan is bad although it is included in this plot. It is flagged as “dummy bit error” for later removal from the unpacking. 2

Jan Power Outage The power panel which supplies power to MINERvA and the electronics for MINOS tripped ~ 8 AM on Jan 13. –The breaker was reset The power tripped again at 5 PM on Jan 14. –2 cables (2 phases) had connections to ground, probably to the conduit that runs from the MINOS Surface Building to MINOS Hall. Through quick work from the Lab, power was restored to the power panel by using 4 of the 8 cables in the power panel at 4:30 PM on Jan 15. –The trip of the panel was reduced from 600 amps to ~ 350 amps. The panel is drawing roughly 70 amps on each of the 3 phases at 480 V so the power levels are now fine. 3

Recovering from the Outage The outage created 3 problems. During the summer we downloaded FEB firmware v95. We did not have a beam trigger, which gates the DAQ on the neutrino spill, during this time. –In general to get the DAQ working, we work on the detector so that our diagnostic program, slowcontrol, returns no errors. –The DAQ ran without any problem from the end of the shutdown to the power outage, hence we did not have to debug the DAQ until the power outage. –In trying to recover from the outage, Slowcontrol gave errors due to the beam triggers, although we did not know they were from beam triggers. These errors appeared over the entire detector. The beam triggers would disrupt communications in the chains. –We determined we could ignore the errors from the beam triggers. Also we had to modify the parameter file to account for this. –It took 2 days to figure this out. 4

Recovering from the Outage After the FEB firmware v95 upgrade, the DAQ has been difficult to recover from a power outage. Using Slowcontrol we would see errors on specific chains. We would try to clear these errors by either one or more chain resets and/or power cycles. Eventually the detector would settle down. Once the recovery was compete the errors did not appear. 5

Recovering from the Outage After we could run the DAQ, we looked at the data –We got 2 kinds of data bank header errors. 1 st caused the unpacking to give up trying to unpack the rest of the data in the subrun after it appeared, called “RAM2” error (from the message in the nearline.). 2nd caused the ADC data to be bad, called the “dummy bit” error. –Replacing 4 CROC-Es out the 15 CROC-Es caused these data bank errors to go away. The last CROC-E was replaced ~11 PM on Jan 18 After that the data has been fine. About 93% the data from runs with “dummy bit” error can be recovered. We do not know how to recover from the RAM2 errors. We are still getting errors, 1-2 times a day, which sometimes stops the DAQ. It can be restarted fairly easily. The last CROC-E that we replaced has these errors. There are no data errors. 6

Recovering from the Outage On Jan 19 the lower live time, 93.7%, was caused by this problem. We would like to thank Cristian Gingu, Paul Rubinov, & Boris Baldin of EED and Donatella Torretta & Geoff Savage of the Neutrino Division. 7

Rock Muons/POT 8 POT/Pulse Rock Muons/POT The ~10% loss is caused by the bad ADC data caused by the “dummy bit” error. As CROC-Es got replaced the error rate went down. The higher proton power from 4+6 slipstacking beam causes ~ 2% decrease in rock muon tracking efficiency

Event Display 9 Tracker neutral current X ViewV View U View

NuMI Beam Plots Jan 4-10, xx

Protons for the Week 11 xx 1.16×10 19 POT Jan 18-24, ×10 19 POT Jan 11-17, 2016

Protons for ME Run ×10 19 POT - Sep 6, 2013 – Jan 24, 2016 xx