26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.

Slides:



Advertisements
Similar presentations
Overview of SMTF RF Systems Brian Chase. Overview Scope of RF Systems RF & LLRF Collaboration LLRF Specifications for SMTF Progress So Far Status of progress.
Advertisements

SRF Beam Test Facility at NML Jerry Leibfritz April 26, 2010.
Progress and Plan for Superconducting RF Cavity RF Group.
SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
Cryo Capture Cavity II Progress Mike McGee April 6, 2005.
ANL HWR Cryomodule Status Update 27 January 2015 Zachary Conway On behalf of the ANL Linac Development Group Argonne National Laboratory Physics Division.
LCLS-II Cryomodules Production Plans at Fermilab
RF Unit Test Facility at NML & CM1 Test Plan Bob Kephart Fermilab IWLC-10 October 20, 2010.
Overview of LCLS-II Cryomodule Plans
SRF_BizPlan_31Oct2010_Rev_14 Production Preparations at JLAB JLab SRF Team EDMS – PLM DESY TeamCenter Meeting at SLAC 31 MAR 2014.
Dr. Michael Peiniger Superconducting RF activities at RI Research Instruments with a focus on EXFEL cavity production.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
STF plan overview H. Hayano, KEK LCPAC 02/25/2005.
Type IV Cryomodule Proposal (T4CM) Don Mitchell, 16 JAN 2006.
STF status Mar.22,2005 H. Hayano, KEK. STF Phase 1 Test Accelerator DC gun : 200kV CsTe photocathode for quick start UV(262nm) Laser (337ns spacing, 2820bunches)
July LEReC Review July 2014 Low Energy RHIC electron Cooling Sergey Belomestnykh SRF and RF systems.
Cryomodule Development at Fermilab Don Mitchell Representing the SRF engineering community at Fermilab April 20, 2009 Tsukuba, Japan TILC09.
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
FNAL efforts on LHC Crab Cavity R&D (Proposals for R&D sub-tasks, resources and schedule) Nikolay Solyak.
Thomas Jefferson National Accelerator Facility Page 1 SPL Cryogenic and vacuum sectorisations 9-10 November, 2009 Joe Preble Workshop on cryogenic and.
Accelerator/ Medium Beta Cavities Paolo Michelato INFN Milano - LASA April 21, 2015.
Medium Beta Cavities Paolo Michelato, Paolo Pierini, and Carlo Pagani INFN Milano - LASA.
Medium beta cavities Paolo Michelato, Paolo Pierini, Carlo Pagani INFN Milano - LASA.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
FNAL Cryomodule Assembly and Installation Plans Tug Arkan LCLS-II Production Cryomodule Final Design Review May 12-14, 2015.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
LCLS-II Cryomodules Production at Fermilab Tug Arkan, 7/17/2014.
Cryomodule Assembly Facility (CAF) at Fermilab Tug Arkan (FNAL) FNAL-LBNL joint meeting on SRF Cavities and Cryomodules March 15, 2012.
LCLS-II Prototype Cryomodule Vacuum Vessel and HGRP Tom Peterson 4 December 2014 Design Review.
CMTF Cryogenics (status and plans) SRF program and AD/Cryogenics work presented by Arkadiy Klebaner May 21, 2013.
Final Design Review (90-100%) Production 1.3 GHz CryoModule Marc Ross, Systems Manager for Cryogenic Systems, LCLS-II May 2015 Fermilab ICB.
LCLS-II Cryoplant Overview
CMTF Cryogenics Arkadiy Klebaner May 6, Outline CMTF cryogenic system scope Goals Key functional requirements Conceptual layout Cryoplant Current.
LCLS-II Prototype Cryomodule FDR J. Blowers, C.M. Ginsburg, T. Peterson, R. Stanek, J. Theilacker (FNAL) 21 – 22 January 2015 Homework Responses.
All Metal Gate Valve from VAT
FNAL Cryomodule Assembly and Installation Plans Tug Arkan May 22, 2015.
Jefferson Lab Cryomodule Cost and Optimization. Based Jlab energy upgrade Cryomodule design and produced to increase the energy gain of CEBAF to 12 GeV.
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
Wish list from ESS Christine Darve H-ECCTD Kick-off meeting 16 March
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Horizontal Test Stand – 2 (HTS-2) Joe Ozelis PIP-II Collaboration Meeting 9-10 November, 2015.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
Cryomodule Safety Approvals Jay Theilacker LCLS-II Production Cryomodule Final Design Review May 12-14, 2015.
JLAB Cryomodule Assembly Facilities Visit Report Tug Arkan, Yuriy Orlov March 26, 2012.
3.9 GHz Cryomodule Design Tom Peterson, Yun He, Matt Kramp 20 November 2015 Preliminary Design Review.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Jefferson.
LCLS-II SC Linac Concept Marc Ross September 13, 2013 (input from Chris Adolphsen)
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
LCLS-II Prototype Cryomodule Darryl Orris 21 January 2015 Final Design Review: Instrumentation.
LCLS-II Technical Requirements
Cryoplant Controls Installation
RF Systems and Controls for the LERF CM Tests
LCLS-II For LCLS-II Cryomodule Testing at JLab
CERN – Zanon discussions
2K Cold Box FDR Introduction
Field Emission Minimization for LCLS-II
Cryomodule test stand at ESS site
WP5 Elliptical cavities
LCLS-II Cavity Production and Vertical Testing
LERF as Cryomodule Testing Facility Set-Up and Installation Logistics
FRIB Cryogenic Support
Chris Adolphsen Sergei Nagaitsev
BriXS – MariX WG 8,9 LASA December 13, 2017.
IHEP Cryomodule Status
QCM and C50-12 Status Update
SNS PPU Cryomodule Design Overview
Presentation transcript:

26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status Facilities for LCLS-II Cavity Treatment & Test Facilities for Cryomodule Assembly & Test Cryoplant overview – Dana Arenius will cover

LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status Facilities for LCLS-II Cavity Treatment & Test Facilities for Cryomodule Assembly & Test Cryoplant overview – (to be confirmed)

3 Electron source, linac and transport 186 MHz CW gun, Cs 2 Te photocathode 4 GeV linac: 1.3 GHz: 35 cryomodules, 8 cavities/module, 9 cells/cavity 3.9 GHz: 2 cryomodules, 8 cavities/module, 9 cells/cavity

Closely based on the European XFEL / ILC / TESLA Design – 20 year old design with > 1000 cavities built – SC Cavities use Nitrogen Doping CEBAF-12 GeV Upgrade Cryoplant adapted 4 Cryogenic Systems Scope: ComponentCountParameters Linac4 cold - segments 35 each 8 cavity Cryomodules (1.3 GHz) 2 each 8 cavity Cryomodules (3.9 GHz) 1.3 GHz Cryomodule8 cavities/CM 13 m long. Cavities + SC Magnet package + BPM 1.3 GHz 9-cell cavity280 each16 MV/m; Q_0 ~ 2.7e10 (avg); 2.0 K; bulk niobium sheet - metal Cryoplant2 each4.5 K / 2.0 K cold box system; K equivalent Cryo Distribution260 m vacuum-jacketed line, 2 each distribution boxes, 6 each feedcap / 2 each endcap

5 Cryogenic System CP2CP1 U-tube TL Jumper Connections

LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status Facilities for LCLS-II Cavity Treatment & Test Facilities for Cryomodule Assembly & Test Cryoplant overview – (to be confirmed)

JLab Org Chart 7

JLab Scope - Cryomodule Production of ~½ the 1.3 GHz cryomodules (1 Prototype, 17 production, 1 spare) – Modify JLab infrastructure to support production – Procure ~ ½ components for both FNAL and JLab Production Major procurement in place including SRF cavities – Support design effort with reviews, etc. Supported various design reviews, workshops, and collaboration meetings Provide QA and fabrication documentation SQAP signed off, QA/QC plans part of every procurement 8

JLab Scope – Cryo Plant, LLRF Design and Procurement of Cryogenic Refrigerators – Specification of all cryoplant components First major procurement is 4.5K Coldbox – contract placed, kick off meeting with vendor held in October Warm compressor – contract placed, kick off meeting with vendor held in October Cold compressor specification review complete cryo plant building requirements complete – Procurement of plant and performance verification at SLAC – Support SLAC and FNAL with requirements and analyses – Safety support and analyses LLRF design, R&D, prototyping, design verification 9

JLab Schedule 10

LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status Facilities for LCLS-II Cavity Treatment & Test Facilities for Cryomodule Assembly & Test

Cryomodule Scope PL Management and Integration JLAB Cryomodule Management Cryomodule Integration and QA Engineering and Design Engineering and Design 1.3 GHz Design Verification Tuner Accelerated Life Testing Microphonics Studies Shipping Test Prototype 1.3 GHz Cryomodule Prototype Procurements Prototype Cavity Preparation and Test Prototype Cavity String Assembly Prototype Cryomodule Assembly Prototype Cryomodule Test

Cryomodule Scope GHz Cryomodule Procurements Cavities HOM&FP Feedthroughs Cavity Flange Hardware Cavity String Bellows Gate Valves Cavity Tuners HOM Absorbers

Cryomodule Scope GHz Cavity Preparation and Test GHz CMs GHz Cavity String Assembly GHz CMs GHz Cryomodule Assembly GHz CMs GHz Cryomodule Test GHz CMs

Cryomodule Scope Infrastructure Design Cleanroom Fixtures CM Assembly Fixtures CMTF High and Low Power RF Cryo interface Installation Support and Shipping Shipping 18 CMs Support for installation and commissioning 3 CMs

16 Integration: LCLS-II 1.3 GHz CM procurement model Procurements distributed, deliveries split JLab/FNAL (SOTR) LCLSII-4.1-PM-229

Infrastructure Required assembly modifications & upgrades are complete VTA for production cavity testing HTB for horizontal cavity testing Cleanroom for cavity string assembly Assembly tooling for CM assembly Required testing modifications/upgrades are in progress – End caps for CM testing – CMTF for completed CM acceptance testing – Ready in Jan/Feb 2015 – Shipping fixture design is complete; procurements begin in FY2016 to support shipping tests after prototype acceptance tests are completed 17

JLab Layout for LCLS-II CM Production Clean Room String Assembly Vacuum Vessel Installation 18 Final Assembly / Prep for Testing CM Testing Phase II CM Assembly (2X) Phase I CM Assembly (2X)

19 LCLS-II Cavity String Components & Tooling

LCLS-II Cold Mass Spreader Bar Installed (Phase II Assembly) 20

Cantilever Fixture Installed 21

CM Assembly Tools Installed 22

23 Processes, Procedures and Travelers Developed list of procedures and travelers for CM production based on CM assembly processes – Leveraged C100 experience Implementing receiving and inspection travelers for the prototype cavity string components – FNAL & JLab SOTRs are collaborating Procedures are based on C100 experience and fold in XFEL techniques in use at Saclay – Assembly travelers for pCM cavity string assembly – Assembly travelers for pCM assembly in progress – Plan to refine production procedures and travelers based on pCM experience Cold Coupler Assembly for HTB Vertical Testing Preparation

Facilities Improvements : Testing in CMTF End Cans (2 sets to support CM production rate) In-house fabrication in progress for prototype cryomodule testing Ready December 2015 – Connects CM to CTF valve box via u-tubes – Interfaces for valves, LL and diodes to monitor and control helium flow/inventory – Provides reliefs for primary circuit, shield circuit and insulating vacuum space HPRF Ready January/February 2016 Will be returned to SLAC – Receive 1.3 GHz 3.8 kW Solid-State Amplifiers (SSAs - 8 from SLAC) – Procure and Install Isolators – Install Coax Waveguide and Modify Interlocks – Run line power to SSA/Circulators – Provide controls in CMTF Control Room LLRF Ready December 2015 – RF Instrumentation (arc detectors, IR sensors, etc.) – Provide digital controls in CMTF Control Room – Software development 24