Manoa Elementary School Amanda Cronauer Faculty Advisor: Dr. William Bahnfleth 14 April 2010.

Slides:



Advertisements
Similar presentations
DOUG BOSWELL MECHANICAL OPTION APRIL 16, 2008 Temple University Tyler School of Art.
Advertisements

Kevin Edstrom Mechanical Option 2011 Senior Thesis April 12 th, 2011 Georgetown University New Science Center Washington, DC.
pae consulting engineers, inc. Nick Collins, P.E., LEED™ AP
STEM Center Delaware County Community College – Media, PA Thesis Final Presentation Dan Saxton Mechanical Option.
West Virginia University Alumni Center Gregory Smithmyer | Mechanical Option | Penn State University | April 15, 2009 | Advisor: Dr. Srebric.
Jacksonville, FL The Pennsylvania State University Department of Architectural Engineering Zachary Polovchik Mechanical Option Advisor – Dustin Eplee Duval.
WESTINGHOUSE ELECTRIC NUCLEAR ENGINEERING HEADQUARTERS DANIEL AUGHENBAUGH - MECHANICAL OPTION Westinghouse Nuclear Engineering Headquarters Daniel Aughenbaugh.
ENERGY SOURCES. ALTERNATIVE ENERGY SOURCES Geothermal Energy comfort… savings... environment.
Coppin State University Physical Education Complex Kaylee Damico – Mechanical Option April 12 th, 2011 Presentation Outline Project Team Project Overview.
Presentation Outline Introduction CHP Analysis Electrical Analysis Acoustical Analysis Thermal Storage Analysis System Optimization Analysis Conclusion.
Integration of Mechanical System Redesign Geothermal Heat Pump Redesign Wesley S. Lawson Architectural Engineering Mechanical Option Pennsylvania State.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
Bowie State University Fine and Performing Arts Center Zachary Lippert Faculty Advisor: Dr. Stephen Treado.
The Edward St. John Student Center Zachary Haupt Faculty Advisor: Dr. William Bahnfleth 11 April 2011.
BENTLEYVILLE, PENNSYLVANIA KYLE COURTNEY | MECHANICAL OPTION | DUSTIN EPLEE.
North Pocono High School
DEA Clandestine Laboratory Training Center Penn State University Architectural Engineering Mechanical Option David M. Potchak.
Technology and Engineering Development (TED) Building Thomas Jefferson National Accelerator Facility Newport News, VA David Blum | Mechanical Option Dustin.
CENTRAL HIGH SCHOOL Central High School MID-ATLANTIC REGION ADAM BROWN MECHANICAL OPTION SPRING 2014 Introduction Existing Mechanical System Thesis Proposal.
Presentation Outline Introduction System Optimization Analysis Acoustical Breadth Conclusion Acknowledgements Questions Thesis Final Presentation Army.
The New RLPS Architects Office Building Lancaster, PA Brice Ohl – Mechanical Option Presented on 4/10/13.
SENIOR THESIS PRESENTATION
Berks Classroom and Lab Building Reading, Pennsylvania Julia Broskey Mechanical Option AE 482 – Senior Thesis Faculty Advisor :Dr. William P. Bahnfleth.
Architectural Engineering Mechanical Option Ft. Detrick Defense Medical Logistics Center Building Systems Redesign April 16, 2008 Senior Thesis Presentation.
Ray & Joan Kroc Corps Community Center Mathias Kehoe | Mechanical Option April 09, 2012.
NRUCFC Headquarters Building Sterling, VA Architectural Engineering Senior Thesis Margaret McNamara | Mechanical Option Advisor | Dr. Stephen Treado.
University Ridge at E ast Stroudsburg University Matthew Carr Spring 2007 Mechanical Option Faculty Advisor: Dr. Freihaut.
Hilton Hotel at BWI Airport Nathan Patrick The Pennsylvania State University Architectural Engineering – Mechanical Option.
Army Reserve Center Newport, Rhode Island Alexander Hosko Mechanical Option.
UNIFIED SCIENCE CENTER THE UNIVERSITY OF SCRANTON SCRANTON, PA DALE E. HOUCK MECHANICAL OPTION.
VIMS Seawater Research Laboratory Dan DiCriscio AE Senior Thesis Mechanical Option 2007.
The Medical Office Building Kale Mullikin Mechanical Option Advisor: Donghyun Rim.
Bronx School for Law Government & Justice Yulien Wong Mechanical Option 2006 Senior Thesis Bronx, New York.
Tri-Valley Jr./Sr. High School Hegins, PA Senior Thesis, Spring 2004 Studying The Feasibility of a Dedicated Outdoor Air System.
Glen Burnie High School Glen Burnie, MD Wade Myers Mechanical Option.
Architectural Engineering Senior Thesis Mechanical System Redesign Saint Joseph Medical Center Chris Nicolais.
Hilton Baltimore Convention Center Hotel Andrew Rhodes Spring 2007 Faculty Advisor: Dr. Bahnfleth.
APPELL LIFE SCIENCES York College of Pennsylvania Joshua Martz | Dr. Srebric | April 11, 2011 Image Courtesy of RLPS, Ltd.
University of Maryland’s Gossett Field House College Park, MD Jason Borowski Architectural Engineering Mechanical Option Pennsylvania State University.
Kevin Angle April 17, 2003 Mechanical Option Faculty Consultant – Mr. Freihaut ALLEGIS GROUP HEADQUARTERS.
The Sunshine Elementary School Redesign Proposal Pennsylvania State University AE Senior Thesis Nicholas Scheib Mechanical Option- IP.
Jonathon Gridley Senior Thesis – Spring 2007 Mechanical Option Energy Efficient Mechanical System Alternatives South Jefferson High School S OUTH J EFFERSON.
Greenbriar East Elementary School Fairfax, Virginia Michelle L. Siano Mechanical Option Spring 2005 Senior Thesis.
Straumann USA 60 Minuteman Road Andover, MA Kevin Kaufman Mechanical Option The Pennsylvania State University Architectural Engineering.
IMPROVING THE EFFICIENCY GEOTHERMAL or GROUND SOURCE HEAT PUMPS.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
INOVA Fairfax Hospital South Patient Tower Falls Church, VA Senior Thesis 2012 Mike Morder Mechanical Option Advisor: Dr. William Bahnfleth.
Flood Athletic Center Woong June Chung Penn State University Mechanical Option Thesis Advisor : DR. Willam Bahnfleth, P.E.
Malory J. Faust ∙ Mechanical Option ∙ Senior Thesis 2007.
Twin Rivers Elementary/Intermediate of McKeesport Area School District Tessa Bauman Mechanical Option Technical Consultant: Laura Miller 1600 Cornell St.,
Britt Kern Mechanical Option Advisor: Dr. Treado Hunter’s Point South School Queens, New York.
BUILDING: LOCATION: SIZE: OCCUPANT: ARCHITECT: ENGINEERS: St. Francis Friary Hanceville, Alabama 59,900 square feet, 2 floors above grade Archdiocese.
Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah.
Hamot Women’s Hospital Erie, PA Michael Galleher Mechanical Option l AE-Senior Thesis l April 12, 2011 l Advisor Dr. Jelena Srebric.
The New Student Housing Building at The Mount St. Mary’s University Emmitsburg, Maryland Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007.
Alexander Radkoff Mechanical Option | Spring 2014 Advisor: Dr. Stephen Treado 123 Alpha Drive Pittsburgh, Pennsylvania
New Castle Center for Delaware Hospice, Inc Zachary Klixbull Penn State University – Architectural Engineering Mechanical Option Advisor: Professor Bahnfleth.
NOLAN JAMES AMOS Dr. William Bahnfleth, Faculty Consultant architectural engineering senior thesis mechanical option PHOENIXVILLE EARLY LEARNING CENTER.
Michael Reilly, Jr. – Mechanical Option Advisor – James Freihaut, PhD & Dustin Eplee The Pennsylvania State University Nassau Community College Life Sciences.
Oak Ridge National Laboratory
Harley-Davidson Museum
ENVIROCENTER PHASE II JESSUP, MD
David Anderson Mechanical Option
Grunenwald Science and Technology Building
Biobehavioral Health Building, University Park, PA
LONGWOOD AT OAKMONT HEALTHCARE CENTER
Senior Thesis Presentation
Abbas Shirian, PE Certified GeoExchange Designer
Virtua Replacement Hospital -Voorhees NJ
Tri-Valley Jr./Sr. High School Hegins, PA
Presentation transcript:

Manoa Elementary School Amanda Cronauer Faculty Advisor: Dr. William Bahnfleth 14 April 2010

 Project Background  Existing Mechanical Summary  Design Objectives  Alternative Descriptions  Ground Source Heat Pumps  Air Source Heat Pumps  System Comparison  Final Recommendations Presentation Overview Amanda Cronauer │ Mechanical Option Spring 2010

 Project Background  Existing Mechanical Summary  Design Objectives  Alternative Descriptions  Ground Source Heat Pumps  Air Source Heat Pumps  System Comparison  Final Recommendations Project Background Project Information: Project Size: 85,355 sf Location: Havertown, PA Cost: $21.2 million Stories: Classroom [3], Administration [1] Construction Dates: May 2007-November 2008 Delivery Method: Design-Bid-Build Amanda Cronauer │ Mechanical Option Spring 2010 Project Team: Owner: Haverford School District Architect: McKissick Associates Architects General Contractor: John S. McManus, Inc. Structural Engineer: Baker Ingram & Associates, Inc. MEP Engineer: H.F. Lenz Company

Building Layout Amanda Cronauer │ Mechanical Option Spring 2010  Project Background  Existing Mechanical Summary  Design Objectives  Alternative Descriptions  Ground Source Heat Pumps  Air Source Heat Pumps  System Comparison  Final Recommendations

Building Layout Amanda Cronauer │ Mechanical Option Spring 2010  Project Background  Existing Mechanical Summary  Design Objectives  Alternative Descriptions  Ground Source Heat Pumps  Air Source Heat Pumps  System Comparison  Final Recommendations

Building Layout Amanda Cronauer │ Mechanical Option Spring 2010  Project Background  Existing Mechanical Summary  Design Objectives  Alternative Descriptions  Ground Source Heat Pumps  Air Source Heat Pumps  System Comparison  Final Recommendations

Building Layout Amanda Cronauer │ Mechanical Option Spring 2010  Project Background  Existing Mechanical Summary  Design Objectives  Alternative Descriptions  Ground Source Heat Pumps  Air Source Heat Pumps  System Comparison  Final Recommendations

Building Layout Amanda Cronauer │ Mechanical Option Spring 2010  Project Background  Existing Mechanical Summary  Design Objectives  Alternative Descriptions  Ground Source Heat Pumps  Air Source Heat Pumps  System Comparison  Final Recommendations

Building Layout Amanda Cronauer │ Mechanical Option Spring 2010  Project Background  Existing Mechanical Summary  Design Objectives  Alternative Descriptions  Ground Source Heat Pumps  Air Source Heat Pumps  System Comparison  Final Recommendations

Existing Mechanical System Amanda Cronauer │ Mechanical Option Spring 2010 Third Floor Second Floor FirstFloor AHU-1AHU-2 Classroom Wing:  [2] Rooftop Variable Air Volume Units  Direct Expansion Cooling  Hot Water Perimeter Heating  Energy Recovery Ventilators  [2] Air Cooled Condensing Units Administration Wing:  Rooftop VAV Unit with Energy Recovery Ventilator [AHU-3]  [2] Rooftop Constant Volume Units  Direct Expansion Cooling  Hot Water Heating  [3] Air Cooled Condensing Units AHU-3 AHU-4 AHU-5  Project Background  Existing Mechanical Summary  Design Objectives  Alternative Descriptions  Ground Source Heat Pumps  Air Source Heat Pumps  System Comparison  Final Recommendations

Design Objectives Amanda Cronauer │ Mechanical Option Spring 2010  Project Background  Existing Mechanical Summary  Design Objectives  Alternative Descriptions  Ground Source Heat Pumps  Air Source Heat Pumps  System Comparison  Final Recommendations  Improve System Performance  Energy Consumption  Emissions  Total System Cost  Comparison of Proposed System Performance

Alternatives Amanda Cronauer │ Mechanical Option Spring 2010  Project Background  Existing Mechanical Summary  Design Objectives  Alternative Descriptions  Ground Source Heat Pumps  Air Source Heat Pumps  System Comparison  Final Recommendations Ground Source Heat Pumps: [+] Decentralized System [+] Higher System Efficiencies [+] Lower Greenhouse Gas Emissions [-] Increased Construction Costs [-] Impact of Loop on Ecosystem Air Source Heat Pumps: [+] Decentralized System [+] Higher System Efficiencies [+] Lower Greenhouse Gas Emissions [+] No Extensive Excavation [-] Utilizes Electricity Dedicated Outdoor Air: [+] Reduce Load on Heat Pumps [+] Smaller [-] Utilizes Electricity

Vertical Loop Analysis Amanda Cronauer │ Mechanical Option Spring 2010  Project Background  Existing Mechanical Summary  Design Objectives  Alternative Descriptions  Ground Source Heat Pumps  Air Source Heat Pumps  System Comparison  Final Recommendations Systems to be Replaced:  Series Fan Powered Boxes  Heat Pump  Rooftop Air Handling Units  Dedicated Outdoor Air Unit  Vertical Loop Analysis  Systems to be Replaced  Assumptions  Loop Sizing  Loop Optimization [Construction Management Breadth]  Results  Horizontal Loop Analysis  Systems to be Replaced  Assumptions  Loop Sizing  Results

Vertical Loop Analysis Amanda Cronauer │ Mechanical Option Spring 2010  Project Background  Existing Mechanical Summary  Design Objectives  Alternative Descriptions  Ground Source Heat Pumps  Air Source Heat Pumps  System Comparison  Final Recommendations Assumptions:  Zoning  Heat Pumps  DOAS Units  Vertical Loop Analysis  Systems to be Replaced  Assumptions  Loop Sizing  Loop Optimization [Construction Management Breadth]  Results  Horizontal Loop Analysis  Systems to be Replaced  Assumptions  Loop Sizing  Results

Vertical Loop Analysis Amanda Cronauer │ Mechanical Option Spring 2010  Project Background  Existing Mechanical Summary  Design Objectives  Alternative Descriptions  Ground Source Heat Pumps  Air Source Heat Pumps  System Comparison  Final Recommendations Loop Sizing:  Vertical Loop Analysis  Systems to be Replaced  Assumptions  Loop Sizing  Loop Optimization [Construction Management Breadth]  Results  Horizontal Loop Analysis  Systems to be Replaced  Assumptions  Loop Sizing  Results

Vertical Loop Analysis Amanda Cronauer │ Mechanical Option Spring 2010  Project Background  Existing Mechanical Summary  Design Objectives  Alternative Descriptions  Ground Source Heat Pumps  Air Source Heat Pumps  System Comparison  Final Recommendations Loop Sizing:  Vertical Loop Analysis  Systems to be Replaced  Assumptions  Loop Sizing  Loop Optimization [Construction Management Breadth]  Results  Horizontal Loop Analysis  Systems to be Replaced  Assumptions  Loop Sizing  Results

Vertical Loop Analysis Amanda Cronauer │ Mechanical Option Spring 2010  Project Background  Existing Mechanical Summary  Design Objectives  Alternative Descriptions  Ground Source Heat Pumps  Air Source Heat Pumps  System Comparison  Final Recommendations Loop Sizing:  Vertical Loop Analysis  Systems to be Replaced  Assumptions  Loop Sizing  Loop Optimization [Construction Management Breadth]  Results  Horizontal Loop Analysis  Systems to be Replaced  Assumptions  Loop Sizing  Results

Vertical Loop Analysis Amanda Cronauer │ Mechanical Option Spring 2010  Project Background  Existing Mechanical Summary  Design Objectives  Alternative Descriptions  Ground Source Heat Pumps  Air Source Heat Pumps  System Comparison  Final Recommendations Goals:  Meet Mechanical Load  Minimize Construction Cost  Vertical Loop Analysis  Systems to be Replaced  Assumptions  Loop Sizing  Loop Optimization [Construction Management Breadth]  Results  Horizontal Loop Analysis  Systems to be Replaced  Assumptions  Loop Sizing  Results

Vertical Loop Analysis Amanda Cronauer │ Mechanical Option Spring 2010  Project Background  Existing Mechanical Summary  Design Objectives  Alternative Descriptions  Ground Source Heat Pumps  Air Source Heat Pumps  System Comparison  Final Recommendations Assumptions:  Piping  1” High Density Polyethylene [HDPE]  $0.53 per linear foot  40 foot lengths  $4.79 per weld  $40.25 per day for welding machine  Grout  Constant Price of $5,937 regardless  Miscellaneous Site Costs  Specified by Number of Boreholes  Borehole Driller  Vertical Loop Analysis  Systems to be Replaced  Assumptions  Loop Sizing  Loop Optimization [Construction Management Breadth]  Results  Horizontal Loop Analysis  Systems to be Replaced  Assumptions  Loop Sizing  Results

Vertical Loop Analysis Amanda Cronauer │ Mechanical Option Spring 2010  Project Background  Existing Mechanical Summary  Design Objectives  Alternative Descriptions  Ground Source Heat Pumps  Air Source Heat Pumps  System Comparison  Final Recommendations Results:  Vertical Loop Analysis  Systems to be Replaced  Assumptions  Loop Sizing  Loop Optimization [Construction Management Breadth]  Results  Horizontal Loop Analysis  Systems to be Replaced  Assumptions  Loop Sizing  Results

Vertical Loop Analysis Amanda Cronauer │ Mechanical Option Spring 2010  Project Background  Existing Mechanical Summary  Design Objectives  Alternative Descriptions  Ground Source Heat Pumps  Air Source Heat Pumps  System Comparison  Final Recommendations Results:  Vertical Loop Analysis  Systems to be Replaced  Assumptions  Loop Sizing  Loop Optimization [Construction Management Breadth]  Results  Horizontal Loop Analysis  Systems to be Replaced  Assumptions  Loop Sizing  Results

Vertical Loop Analysis Amanda Cronauer │ Mechanical Option Spring 2010  Project Background  Existing Mechanical Summary  Design Objectives  Alternative Descriptions  Ground Source Heat Pumps  Air Source Heat Pumps  System Comparison  Final Recommendations Results:  [115] Boreholes  [218] feet per borehole  $86,889 Total Installed Cost  Vertical Loop Analysis  Systems to be Replaced  Assumptions  Loop Sizing  Loop Optimization [Construction Management Breadth]  Results  Horizontal Loop Analysis  Systems to be Replaced  Assumptions  Loop Sizing  Results

Vertical Loop Analysis Amanda Cronauer │ Mechanical Option Spring 2010  Project Background  Existing Mechanical Summary  Design Objectives  Alternative Descriptions  Ground Source Heat Pumps  Air Source Heat Pumps  System Comparison  Final Recommendations  Vertical Loop Analysis  Systems to be Replaced  Assumptions  Loop Sizing  Loop Optimization [Construction Management Breadth]  Results  Horizontal Loop Analysis  Systems to be Replaced  Assumptions  Loop Sizing  Results

Vertical Loop Analysis Amanda Cronauer │ Mechanical Option Spring 2010  Project Background  Existing Mechanical Summary  Design Objectives  Alternative Descriptions  Ground Source Heat Pumps  Air Source Heat Pumps  System Comparison  Final Recommendations  Vertical Loop Analysis  Systems to be Replaced  Assumptions  Loop Sizing  Loop Optimization [Construction Management Breadth]  Results  Horizontal Loop Analysis  Systems to be Replaced  Assumptions  Loop Sizing  Results

Vertical Loop Analysis Amanda Cronauer │ Mechanical Option Spring 2010  Project Background  Existing Mechanical Summary  Design Objectives  Alternative Descriptions  Ground Source Heat Pumps  Air Source Heat Pumps  System Comparison  Final Recommendations  Vertical Loop Analysis  Systems to be Replaced  Assumptions  Loop Sizing  Loop Optimization [Construction Management Breadth]  Results  Horizontal Loop Analysis  Systems to be Replaced  Assumptions  Loop Sizing  Results

Vertical Loop Analysis Amanda Cronauer │ Mechanical Option Spring 2010  Project Background  Existing Mechanical Summary  Design Objectives  Alternative Descriptions  Ground Source Heat Pumps  Air Source Heat Pumps  System Comparison  Final Recommendations  Vertical Loop Analysis  Systems to be Replaced  Assumptions  Loop Sizing  Loop Optimization [Construction Management Breadth]  Results  Horizontal Loop Analysis  Systems to be Replaced  Assumptions  Loop Sizing  Results 25% Reduction = 7 /19 LEED Points [EA Credit 1]

Vertical Loop Analysis Amanda Cronauer │ Mechanical Option Spring 2010  Project Background  Existing Mechanical Summary  Design Objectives  Alternative Descriptions  Ground Source Heat Pumps  Air Source Heat Pumps  System Comparison  Final Recommendations  Vertical Loop Analysis  Systems to be Replaced  Assumptions  Loop Sizing  Loop Optimization [Construction Management Breadth]  Results  Horizontal Loop Analysis  Systems to be Replaced  Assumptions  Loop Sizing  Results Simple Payback Period: Redesign: [67] Heat Pumps= $420,050 [5] DOAS Units= $82,042 Vertical Loop= $86,889 Utility=$94,129 Design:  [5] Rooftop AHU’s =$280,000  [5] ACCU’s= $12,000  Utility= $112,893 Simple Payback Period: years

Vertical Loop Analysis Amanda Cronauer │ Mechanical Option Spring 2010  Project Background  Existing Mechanical Summary  Design Objectives  Alternative Descriptions  Ground Source Heat Pumps  Air Source Heat Pumps  System Comparison  Final Recommendations  Vertical Loop Analysis  Systems to be Replaced  Assumptions  Loop Sizing  Loop Optimization [Construction Management Breadth]  Results  Horizontal Loop Analysis  Systems to be Replaced  Assumptions  Loop Sizing  Results Simple Payback Period: Redesign: [67] Heat Pumps= $420,050 [5] DOAS Units= $82,042 Vertical Loop= $86,889 Ductwork= $74,531 Utility= $94,129 Design:  [5] Rooftop AHU’s =$280,000  [5] ACCU’s= $12,000  Utility= $112,893  Ductwork= $319,850 Simple Payback Period: 1.2 years

Horizontal Loop Analysis Amanda Cronauer │ Mechanical Option Spring 2010  Project Background  Existing Mechanical Summary  Design Objectives  Alternative Descriptions  Ground Source Heat Pumps  Air Source Heat Pumps  System Comparison  Final Recommendations  Vertical Loop Analysis  Systems to be Replaced  Assumptions  Loop Sizing  Loop Optimization [Construction Management Breadth]  Results  Horizontal Loop Analysis  Systems to be Replaced  Assumptions  Loop Sizing  Results Systems to be Replaced:  Series Fan Powered Boxes  Heat Pump  Rooftop Air Handling Units  Dedicated Outdoor Air Unit

Horizontal Loop Analysis Amanda Cronauer │ Mechanical Option Spring 2010  Project Background  Existing Mechanical Summary  Design Objectives  Alternative Descriptions  Ground Source Heat Pumps  Air Source Heat Pumps  System Comparison  Final Recommendations  Vertical Loop Analysis  Systems to be Replaced  Assumptions  Loop Sizing  Loop Optimization [Construction Management Breadth]  Results  Horizontal Loop Analysis  Systems to be Replaced  Assumptions  Loop Sizing  Results Assumptions:  Zoning  Heat Pumps  DOAS Units

Horizontal Loop Analysis Amanda Cronauer │ Mechanical Option Spring 2010  Project Background  Existing Mechanical Summary  Design Objectives  Alternative Descriptions  Ground Source Heat Pumps  Air Source Heat Pumps  System Comparison  Final Recommendations  Vertical Loop Analysis  Systems to be Replaced  Assumptions  Loop Sizing  Loop Optimization [Construction Management Breadth]  Results  Horizontal Loop Analysis  Systems to be Replaced  Assumptions  Loop Sizing  Results Assumptions:  Sizing Method Applicable  Horizontal, 6-Pipe Coil  Ground Temperature

Horizontal Loop Analysis Amanda Cronauer │ Mechanical Option Spring 2010  Project Background  Existing Mechanical Summary  Design Objectives  Alternative Descriptions  Ground Source Heat Pumps  Air Source Heat Pumps  System Comparison  Final Recommendations  Vertical Loop Analysis  Systems to be Replaced  Assumptions  Loop Sizing  Loop Optimization [Construction Management Breadth]  Results  Horizontal Loop Analysis  Systems to be Replaced  Assumptions  Loop Sizing  Results Results: [150] foot per ton loop recommended [17,925] feet of length required

Horizontal Loop Analysis Amanda Cronauer │ Mechanical Option Spring 2010  Project Background  Existing Mechanical Summary  Design Objectives  Alternative Descriptions  Ground Source Heat Pumps  Air Source Heat Pumps  System Comparison  Final Recommendations  Vertical Loop Analysis  Systems to be Replaced  Assumptions  Loop Sizing  Loop Optimization [Construction Management Breadth]  Results  Horizontal Loop Analysis  Systems to be Replaced  Assumptions  Loop Sizing  Results

Horizontal Loop Analysis Amanda Cronauer │ Mechanical Option Spring 2010  Project Background  Existing Mechanical Summary  Design Objectives  Alternative Descriptions  Ground Source Heat Pumps  Air Source Heat Pumps  System Comparison  Final Recommendations  Vertical Loop Analysis  Systems to be Replaced  Assumptions  Loop Sizing  Loop Optimization [Construction Management Breadth]  Results  Horizontal Loop Analysis  Systems to be Replaced  Assumptions  Loop Sizing  Results

Horizontal Loop Analysis Amanda Cronauer │ Mechanical Option Spring 2010  Project Background  Existing Mechanical Summary  Design Objectives  Alternative Descriptions  Ground Source Heat Pumps  Air Source Heat Pumps  System Comparison  Final Recommendations  Vertical Loop Analysis  Systems to be Replaced  Assumptions  Loop Sizing  Loop Optimization [Construction Management Breadth]  Results  Horizontal Loop Analysis  Systems to be Replaced  Assumptions  Loop Sizing  Results 12% Reduction = 1 /19 LEED Point [EA Credit 1]

Horizontal Loop Analysis Amanda Cronauer │ Mechanical Option Spring 2010  Project Background  Existing Mechanical Summary  Design Objectives  Alternative Descriptions  Ground Source Heat Pumps  Air Source Heat Pumps  System Comparison  Final Recommendations  Vertical Loop Analysis  Systems to be Replaced  Assumptions  Loop Sizing  Loop Optimization [Construction Management Breadth]  Results  Horizontal Loop Analysis  Systems to be Replaced  Assumptions  Loop Sizing  Results Simple Payback Period: Redesign: [67] Heat Pumps= $420,050 [5] DOAS Units= $82,042 Horizontal Loop= $76,898 Ductwork= $74,531 Utility= $109,764 Design:  [5] Rooftop AHU’s =$280,000  [5] ACCU’s= $12,000  Utility= $112,893  Ductwork= $319,850 Simple Payback Period: 0.95 years

Air Source Heat Pumps Amanda Cronauer │ Mechanical Option Spring 2010  Project Background  Existing Mechanical Summary  Design Objectives  Alternative Descriptions  Ground Source Heat Pumps  Air Source Heat Pumps  System Comparison  Final Recommendations  Analysis  Systems to be Replaced  Assumptions  Results Systems to be Replaced:  Series Fan Powered Boxes  Heat Pump  Rooftop Air Handling Units  Dedicated Outdoor Air Unit

Air Source Heat Pumps Amanda Cronauer │ Mechanical Option Spring 2010  Project Background  Existing Mechanical Summary  Design Objectives  Alternative Descriptions  Ground Source Heat Pumps  Air Source Heat Pumps  System Comparison  Final Recommendations  Analysis  Systems to be Replaced  Assumptions  Results Assumptions:  Zoning  Heat Pumps  DOAS Units

Air Source Heat Pumps Amanda Cronauer │ Mechanical Option Spring 2010  Project Background  Existing Mechanical Summary  Design Objectives  Alternative Descriptions  Ground Source Heat Pumps  Air Source Heat Pumps  System Comparison  Final Recommendations  Analysis  Systems to be Replaced  Assumptions  Results

Air Source Heat Pumps Amanda Cronauer │ Mechanical Option Spring 2010  Project Background  Existing Mechanical Summary  Design Objectives  Alternative Descriptions  Ground Source Heat Pumps  Air Source Heat Pumps  System Comparison  Final Recommendations  Analysis  Systems to be Replaced  Assumptions  Results

Air Source Heat Pumps Amanda Cronauer │ Mechanical Option Spring 2010  Project Background  Existing Mechanical Summary  Design Objectives  Alternative Descriptions  Ground Source Heat Pumps  Air Source Heat Pumps  System Comparison  Final Recommendations  Analysis  Systems to be Replaced  Assumptions  Results 17% Reduction = 3 /19 LEED Points [EA Credit 1]

Air Source Heat Pumps Amanda Cronauer │ Mechanical Option Spring 2010  Project Background  Existing Mechanical Summary  Design Objectives  Alternative Descriptions  Ground Source Heat Pumps  Air Source Heat Pumps  System Comparison  Final Recommendations  Analysis  Systems to be Replaced  Assumptions  Results Simple Payback Period: Redesign: [67] Heat Pumps= $211,403 [5] DOAS Units= $83,042 Ductwork= $74,531 Utility= $103,384 Design:  [5] Rooftop AHU’s =$280,000  [5] ACCU’s= $12,000  Utility= $112,893  Ductwork= $319,850 Simple Payback Period: 0.65 years

System Comparison Amanda Cronauer │ Mechanical Option Spring 2010  Project Background  Existing Mechanical Summary  Design Objectives  Alternative Descriptions  Ground Source Heat Pumps  Air Source Heat Pumps  System Comparison  Final Recommendations

System Comparison Amanda Cronauer │ Mechanical Option Spring 2010  Project Background  Existing Mechanical Summary  Design Objectives  Alternative Descriptions  Ground Source Heat Pumps  Air Source Heat Pumps  System Comparison  Final Recommendations

System Comparison Amanda Cronauer │ Mechanical Option Spring 2010  Project Background  Existing Mechanical Summary  Design Objectives  Alternative Descriptions  Ground Source Heat Pumps  Air Source Heat Pumps  System Comparison  Final Recommendations Simple Payback Period: Vertical Loop GSHP = [1.2] years Horizontal Loop GSHP = [0.95] years Air Source Heat Pump= [0.65] years

Final Recommendations Amanda Cronauer │ Mechanical Option Spring 2010  Project Background  Existing Mechanical Summary  Design Objectives  Alternative Descriptions  Ground Source Heat Pumps  Air Source Heat Pumps  System Comparison  Final Recommendations Emissions and Fuel Consumption:  Vertical Ground Source Heat Pump Lowest First Cost:  Air Source Heat Pump Fastest Potential Payback:  Air Source Heat Pump LEED Points:  Vertical Ground Source Heat Pump

Questions Special Thanks To: Paul Cronauer, H.F. Lenz Contact Verne McKissick, McKissick Architects Contact Dr. Bahnfleth, Faculty Advisor Penn State Architectural Engineering Mechanical Faculty Family and Friends for all their support Fellow AE Students Jonah, moral support Amanda Cronauer │ Mechanical Option Spring 2010