APA Customer Bubble Charts Work in Progress Updated January 25, 2016 (a.m.) (Contact: John Underhill 602-368-4265) 1.

Slides:



Advertisements
Similar presentations
Cohort Review in Arizona
Advertisements

Arizona Independent Redistricting Commission Analysis of Round Two of Public Hearings 11/29/11.
Western Interconnection Subregions for PSA Layne Brown Manager, Reliability Assessments.
State of the Arizona Energy System Examining the current state of Arizona’s energy mix in the context of the Clean Power Plan.
Think-Pair-Share What are some limited natural resources that you use on a regular basis?: 1.
* County Seat is Back to Map End Answer * County Seat is Back to Map End Answer.
Status of Arizona Coordinated Resource Management Efforts.
U.S. Energy Information Administration Independent Statistics & Analysis Balancing Authority Related Proposals for EIA Surveys EIA Stakeholder.
National Water Quality Monitoring Council. TRIBAL TOPICS  What is ITCA  Water Quality – Tribes  SW Water Issues  Need for Involvement  Lack of Funding.
2/16/2001ACC Energy Workshop – Summer Preparedness 2001 and SS-1 SRP Summer Preparedness 2001 and 2002 Presented to the Arizona Corporation.
Arizona Water Banking Authority December 3, 2014.
Water Use and Resources in Arizona – Part 1 Role Playing Project.
Is there a difference in costs? Private Water v. Public Water.
1. 2 Arizona’s General Stream Adjudications 1.Gila River Watershed (Maricopa County Superior Ct.) Commenced by Salt River Project in ,000 separate.
1 JPA Meeting Joint Planning Agreement Western Area Power Administration Desert Southwest Region July 13, 2005.
Arizona Water Banking Authority December 4, 2013.
Prevalence: HIV/AIDS, by County Rate Per 100,000 a- Pima b- Maricopa c- Pinal* d- Mohave e- Cochise f- La Paz g- Coconino h- Graham* i- Sta Cruz j- Yuma.
Salt River Pima-Maricopa Indian Community Environmental Protection & Natural Resources Air Quality Program.
Conference Overview  Saturday, Oct. 6 – Wednesday, Oct. 10  2,500-3,000 Attendees Expected  More than 2,300 in Milwaukee  Opportunity to showcase.
T EACHING IN THE 21 ST C ENTURY : T HE USE OF CONTEMPORARY TECHNOLOGY IN THE K-12 CLASSROOM AND BEYOND T EACH T EC A Collaboration between University of.
Arizona Topographic Map The topography of Arizona. What would influence you if you were trying to escape back to Germany? What factors would influence.
Anthony Carrillo Jennifer Thorson Jody Gardner Maria Esposito Adam Robson Letitia Labrecque.
Arizona Power Authority Transmission Workshop August 7, 2015 APA Offices/On-line Webinar.
Creating A Vision for Arizona ACMA Winter Conference Sedona February 2, 2006.
NORTHWEST POWER POOL Reliability Update – Summer 2010 April 2010 Jerry D. Rust.
Virtual Tour March PHOENIX ACTIVE MANAGEMENT AREA ~~ Virtual Tour ~~ arizona department of water resources – phoenix ama Physical SettingPhysical.
Water Resources 101 Arizona’s Municipal: Water Future.
Arizona By T. Csatlos. State Capitol Phoenix America’s fifth-largest city still has real cowboys and rugged mountains and the kind of cactus most people.
2009 SOUTHEAST ARIZONA TRANSMISSION SYSTEM STUDY REPORT 6 th BTA Workshop Carnegie Library, Phoenix, AZ By TEP on behalf of SATS Participants June 3-4,
ARIZONA DEPARTMENT OF REVENUE
CD March 9-10, MOHAVE COCONINO NAVAJO APACHE GRAHAM COCHISE PIMA GREENLEE MARICOPA YUMA YAVAPAI LA PAZ GILA DAN HINZ SHERRIE COLLINS.
PINAL COUNTY TOWN HALL Tabletop Exercise - Panel Discussion on a Local Emergency.
Chandler Gilbert – Estrella Mountain – GateWay – Glendale – Mesa – Paradise Valley – Phoenix – Rio Salado – Scottsdale – South Mountain 21 st Century Maricopa.
Arizona Water Banking Authority December 19, 2012.
Chairman Charles Vaughn, Hualapai Tribe Chairman Waldo Walker, Washoe Tribe March 13, National Budget Presentation Tribes Served by the Western.
Arizona Corporation Commission Energy Workshop February 16, 2001.
Arizona Damon Love Nov 21th, th Hour Ms.Moton.
03/22/07 ACC Open MeetingSummer Preparedness SRP Summer Preparedness 2007 Mike Hummel Manager – Supply & Trading and Gary Harper Manager - System.
The Big Picture Cover Arizona April 15, Gains In Coverage Nationally Q1 2014Q3 2014Q Number gained coverage since baseline (Q Q3 2013)
 Group 1 – Cochise, Pima, Santa Cruz, Greenlee, Graham  Group 2 – Coconino, Apache, Navajo County & Nation & Hopi Tribes  Group 3 – Mohave, Yavapai.
12/15/ SS-1 Arizona Corporation Commission Special Open Meeting Gary Harper Manager, System Operations July 23, 2004 Phoenix, Arizona.
APS Ten-Year Plans th BTA Presentation
1 CATS HV Status Report Presented to the 2008 BTA Workshop May 22, 2008.
Ozone in Arizona Ira Domsky WRAP NOx Strategies Workshop July 28-29, 2003.
CAP Trail Master Plan: Pinal County Segment CAP Trail Draft Master Plan Presentation to Pinal County Board of Supervisors November 4, 2015.
Dynamic Signal Workshop January 14, 2016 APA Office Phoenix, Arizona 1.
ARIZONA By Brianna Carter. Arizona Arizona is located in the southwest region in United States. Arizona has Mountains and Grand Canyons. Millions of land.
Arizona Chapter 2 Frameworks Powerpoint Travel Destinations 4th hour S. Ashby.
ITEP CY04 3 rd Quarter Report October- December 2004 Emissions Forum Meeting January 26-27, 2005 San Diego, CA Jenifer Williams, Technology Specialist.
An Economist’s Law of the River Lesli Kirsch-Burke Economist, Boulder Canyon Operations Office Lower Colorado Regional Office April 8, 2016.
Yuma Agriculture Water – Rights and Supply Yuma’s Agriculture Water: What You Need To Know Yuma Agriculture Water Conference January 13, 2016 Thomas Buschatzke,
EITC Campaign The City of Phoenix. Earned Income Tax Credit Largest Federal Tax Benefit Program $36 Billion Dollars in Tax Refunds Lifted nearly.
Planning & Zoning Commission January Purpose of the General Plan  Required by State Statute  Roadmap for growth & development  Guides change.
THE ROMAN CATHOLIC DIOCESE OF PHOENIX
Ed Gerak, Executive Director
Arizona Legislative Academy for new members of the
2017 AZ Water Association Leadership Retreat July 28 – 29, 2017 Tucson, Arizona Member Services.
Assistant Governors.
Status of Arizona Coordinated Resource Management Efforts
SCHOOL LOCATOR grid-codes.
PMC Membership as of 5/1/2016 Enrolled TO Coordinating TO 1
State by: Phoenix.
Arizona Topographic Map
Indian Health Service Office of Tribal Self-Governance Update
Arizona Geography GCU 221.
Groundwater in Indian Water Right Settlements
Tribal Transportation Planning Pathway
Town Council Strategic Planning Session
MANAGED AQUIFER RECHARGE FOR THE ARIZONA DESERT:
Yuma County Water Agriculture Water Coalition
Presentation transcript:

APA Customer Bubble Charts Work in Progress Updated January 25, 2016 (a.m.) (Contact: John Underhill ) 1

Salt River Project Scheduling Entity Balancing Authority 64,248kw Total 59,234kw A 4,014kw D1 1,000kw D2 Town of Gilbert 1,000kw D2 San Tan ID 520kw A City of Chandler 676kw D1 Fort McDowell 338kw D1 SRPMIC 3,000kw D1 SRP 38,782kw A Customer Point of Delivery Queen Creek ID 1,770kw A Chandler Heights 930kw A ED6 Pinal 8,358kw A Ocotillo WCD 2,115kw A Roosevelt WCD 6,759kw A Mead 230kV Hoover Dam Post-2017 WAPA Dynamic Signal 0 to 64MW Point of Delivery Transmission Reservation ED6 has loads in both APS and SRP BA, the majority is within the SRP BA

AEPCO/CAWCD Sub-metered under WAPA Scheduling Entity 214,189kw Total 161,600kw CAWCD 37,236kw A 3,161kw B 7,188kw D1 5,004kw D2 Graham County Elec 312kw D1 1000kw D2 Sulfur Springs VEC 2731kw D1 1000kw D2 Mohave Electric Co. 1145kw D1 1000kw D2 TRICO Elec Coop 3000kw D1 1000kw D2 Avra Water Co-op 100kw D2 Duncan Valley Elect 700kw D2 City of Safford 2101kw B City of Sierra Vista 204kw D2 Town of Thatcher 1060kw B Mead 230kV Hoover Dam CAWCD 161,600kw B Avra I&DD 630kw A St David ID Sulfur Spr 81kw A Silverbell I&DD 710kw A Franklin Irr District Duncan Vly 303kw A Gila Vly ID Graham Cy 910kw A Mohave Valley I&DD 390kw A Post-2017 Customer Point of Delivery WAPA Dynamic Signal 0 to 214MW Point of Delivery Transmission Reservation ED4 Pinal 19445kw A ED-5 Pinal 14767kw A

Arizona Public Service Balancing Authority 98,932kw Total 65,405kw A 22,552kw B 7,204kw D1 3,771kw D2 Hyder Valley Irrig District 100kw A Maricopa Co. Mun. WCD 8838kw A Roosevelt ID 3219kw A McMullen Valley 3800kw A 5342kw B Tonopah Irrigation District 1549kw A Aguila Irrig District 2449kw A 3878kw B Customer Point of Delivery Harquahala Valley Power 2490kw A Buckeye Water Cons District 2979kw A ED7 Maricopa 10498kw A ED-8 Maricopa 13,387kw A 10917kw B Markham Irrig and WCD 100kw A Mead 230kV Hoover Dam Silvercreek Irrig Dist 100kw A City of Avondale 547kw D2 City of Buckeye 670kw D2 City of Flagstaff 172kw D2 City of Glendale 426kw D1 City of Globe 115kw D1 113kw D2 Town of Payson 119kw D1 173kw D2 City of Peoria 691kw D1 City of Phoenix 3000kw D1 City of Sedona 111kw D2 City of Scottsdale 2366kw D1 City of Tempe 241kw D1 Town of Wickenburg 2313kw B City of Williams 825kw D2 Northern AZ IDPP 246kw D1 Post-2017 ED-3 Pinal (ED-1) 15896kw A Point of Delivery WAPA Dynamic Signal 0 to 99MW Transmission Reservation RID has loads in both the APS BA and SRP BA. The majority of the loads are within the APS BA Ak-Chin Indian Comm 102kw B City of Yuma 996kw D2 City of Maricopa 164kw D2

Tucson Electric Power Balancing Authority 9,169kw Total 6,439kw A 1,427kw D1 1303kw D2 Cortaro Marana ID 6439kw A Customer Point of Delivery Town of Oro Valley 203kw D2 City of Tucson Water Dep. 1248kw D1 Metro Domestic Water ID 179kw D1 Mead 230kV Hoover Dam Post-2017 WAPA Dynamic Signal 0 to 9MW Point of Delivery Transmission Reservation Grover’s Hill ID 100kw D2 Navopache 1000kw D2

Western Area Power Administration Balancing Authority 35,636kw Total 22,455kw A 2,547kw B 10,102kw D1 532kw D2 Hohokam Irrigation & Drainage 100kw A Town of Fredonia 201kW D1 100kw D2 City of Mesa 1497kw B ED kw A Customer Point of Delivery Wellton Mohawk 2910kw A Page Utility 1050kw B Mead 230kV Hoover Dam Kaibab Band of Paiute 124kw D1 Hualapai Indian Tri 381kw D1 100kw D2 Gila River Indian Com 3,000kw D1 Aha Macav Indian Comm 332kw D2 Tohono O’odham 2,709kw D1 Pascua Yaqui Tribe 437kw D1 Navajo Tribal Util. 3000kw D1 Tonto Apache Tribe 250kw D1 Post-2017 Point of Delivery WAPA Dynamic Signal 0 to 36MW Transmission Reservation