WP2 13/07/2011M. Dracos1 Marcos Dracos IPHC-IN2P3/CNRS, Strasbourg.

Slides:



Advertisements
Similar presentations
EuroNu CERN February 5, 2008 Marco Zito Super-Beam work package Marco Zito Dapnia-Saclay On behalf of the SB w2 team EuroNu 5/2/2008 Thanks to M. Dracos.
Advertisements

Neutrinos from Stored Muons STORM Target Station Conceptual Design 15-April-2013 Kris Anderson Fermilab/Accelerator Division/Mechanical Support Department.
Chris Tennant Jefferson Laboratory March 15, 2013 “Workshop to Explore Physics Opportunities with Intense, Polarized Electron Beams up to 300 MeV”
30 June 2008M. Dracos, NuFact081 Challenges and Progress on the SuperBeam Horn Design Marcos DRACOS IN2P3/CNRS Strasbourg NuFact 08 Valencia-Spain, June.
17 Dec. 2008M. Dracos, EUROnu-WP21 Collector and the SPL Super-Beam Project Marcos Dracos IPHC-IN2P3/CNRS Strasbourg.
NBI March 2002 The MiniBooNE Horn Ioanis Kourbanis For The MiniBooNE Collaboration.
Sergey Antipov, University of Chicago Fermilab Mentor: Sergei Nagaitsev Injection to IOTA ring.
EATM12-08 Contribution NA62 Francois Butin, Lau Gatignon / EN-MEF 4 September 2012.
1 Induced radioactivity in the target station and in the decay tunnel from a 4 MW proton beam S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2)
PAIR SPECTROMETER DEVELOPMENT IN HALL D PAWEL AMBROZEWICZ NC A&T OUTLINE : PS Goals PS Goals PrimEx Experience PrimEx Experience Design Details Design.
Beam Instrumentations: Requirements for Proton and Electron Beams C. Bracco, E. Gschwendtner, B. Goddard, M. Meddahi, A. Petrenko, F. Velotti Acknowledgements:
A new design for the CERN to Fréjus neutrino beam Marco Zito (IRFU/CEA-Saclay) For the EUROnu WP2 team NUFACT11 Geneva August 2nd 2011.
1 T2K Beam Operation Summary (earthquake recovery and beamline survey) NBI 2012 T. Ishii (KEK) for the T2K beam group.
RAL/BENE meeting, April Marcos Dracos Collection system for future neutrino beams horn and target integration 2 LoI's sent –CERN –Strasbourg.
NUMI NuMI Review of the Infrastructure – W, G & V 20 July 2001 WBS Page 1 1 Infrastructure Review - W.B.S Water Systems Water Systems –Upstream.
Horn design for the CERN to Fréjus neutrino Super Beam Nikolas Vassilopoulos IPHC/CNRS.
EUROnu Target and Horn Studies Nikolaos Vassilopoulos/IPHC-CNRS on behalf of WP2 1ECFA Review PanelDarensbury, 02/05/2011.
October 31, BDS Group1 ILC Beam Delivery System “Hybrid” Layout 2006e Release Preliminary M. Woodley.
Integration of the Experimental Facility in West Area & CNGS 1Ans Pardons, 18/10/2012 Integration of experimental facility in West Area and CNGS With input.
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
Q&A on T2K construction of beam line near detectors budget collaboration (contribution from each) T2KK.
NuMI NuMI Target Hall Air System Review Introduction July 30, 2003 Jim Hylen / FNAL Page 1 NuMI Target Hall Air System Review Introduction Air system for.
REQUIREMENTS FOR FCC DILUTION KICKERS AND BEAM DUMP LINE GEOMETRY F. Burkart, W. Bartmann, M. Fraser, B. Goddard, T. Kramer FCC dump meeting 18 th June.
1 Status of Neutrino Beamline Construction K. Nishikawa IPNS, KEK 2006 . 12 . 4.
Safety issues for WP2 E. Baussan on behalf of WP2.
J. Pasternak First Ideas on the Design of the Beam Transport and the Final Focus for the NF Target J. Pasternak, Imperial College London / RAL STFC ,
Overview of Electron Cooling Activities at FNAL Thomas Kroc Fermilab – Electron Cooling EIC 2004 March 15-17, 2004 Jefferson Lab.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
CERN/BENE meeting, July Marcos Dracos Collection system for future neutrino beams horn and target integration 2 LoI's sent –CERN –Strasbourg Who.
EUROn Safety 13/06/2012M. Dracos1. Safety workshop 13/06/2012M. Dracos2 A first two days safety workshop has been organized at CERN last May (
1 Target Station Design for Neutrino Superbeams Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory NBI 2012, CERN.
K. Matsuoka (Kyoto Univ.) for T2K muon monitor group
Sketching Basic Kicker System Parameters W. Bartmann, T. Fowler, B. Goddard, T. Kramer.
Investigation of a “Pencil Shaped” Solid Target Peter Loveridge, Mike Fitton, Ottone Caretta High Power Targets Group Rutherford Appleton Laboratory, UK.
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
ESS based neutrino Super Beam for CP Violation discovery Marcos DRACOS IPHC-IN2P3/CNRS Strasbourg 1 10 September 2013M. Dracos.
NSLS-II Transfer Lines BUDKER INSTITUTE OF NUCLEAR PHYSICS NOVOSIBIRSK.
1 V. Kashikhin for ILC ALCPG 2007, FNAL Meeting October 23, 2007 Ring to Main Linac Magnets.
Design, integration and installation milestones Legend: 2015/Q1= 1 st quarter of 2015 (January-March) Phase 1 = proton & laser beams operation Phase 2.
XFEL X-Ray Free-Electron Laser Bernward Krause MEA WP-12: Warm Magnets WPL: B. Krause.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
Proton Driver – Target Station Interfaces Keith Gollwitzer Fermilab Wednesday May 28, 2014 MAP 2014 Spring Meeting.
WP2 progress on safety E. Baussan EUROnu CB Meeting Monday 10th & Tuesday 11th June 2011 CERN, Geneva, Switzerland.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
MeRHIC Internal Cost Review October, Dmitry Kayran for injector group MeRHIC Internal Cost Review October 7-8, 2009 MeRHIC: Injection System Gun.
ARIEL Building Pierre Bricault. Proton Beam specification The proton beam energy must be between 450 to 500 MeV. 200 µA with proton beam intensity losses.
Simulation of heat load at JHF decay pipe and beam dump KEK Yoshinari Hayato.
From the SPL to the 4-target-horn system: Preliminary design of a beam switching yard WP2: Super Beam 4 th EUROν Annual Meeting, Paris, June 13, 2012 E.
Target/Horn Station for ESS ν SB Nikolaos Vassilopoulos IPHC/CNRS.
Target/Horn Station for ESS ν SB Nikolaos Vassilopoulos IPHC/CNRS.
Packed Bed Target Design Concept (for EURONu) Tristan Davenne, Ottone Caretta, Peter Loveridge, Chris Densham (RAL); Andrea Longhin, Marco Zito (CEA Saclay)
CERN –GSI/CEA MM preparation meeting, Magnetic Measurements WP.
1 Building Design Progress Dan Wilcox March 2012.
HB2008 – WG F: 27 Aug. S. Childress – Diagnostics_2MW 1 NuMI Beam Diagnostics and Control Steps to 2 MW S. Childress Fermilab.
TEST FACILITY STATUS FOR TESTING CERN Marta Bajko WP10. EUCARD 2 Task 4 - HTS Magnet Tests, June 2015.
EUROnu Super Beam Work package Marco Zito (IRFU/CEA-Saclay) For the WP2 team EURONu Review CERN April
Primary Beam Lines for the Project at CERN
Beam Dump Hall Volume Beam Dump Meeting at SLAC May S.Ban
Schedule for the FAIR Antiproton Target
Challenges and Progress on the SB Horn Design
Status of HESR 18th March Gießen Dieter Prasuhn.
Sara Thorin, MAX IV Laboratory
Beam switching yard interfaces
Studies on Energy Deposition and Radiation for the 4horn system
M. Alcaide Leon, Paolo Fessia
NuSTORM - μ Storage Ring with Injection
EUROnu Beam Window Studies Stress and Cooling Analysis
EURO Conclusions from Cracow meeting
Advanced Research Electron Accelerator Laboratory
RHIC Magnets for JLEIC Yuhong Zhang May 11, 2018.
Presentation transcript:

WP2 13/07/2011M. Dracos1 Marcos Dracos IPHC-IN2P3/CNRS, Strasbourg

Milestones and Deliverables 13/07/2011M. Dracos2 Target and collector integration (deliverable): 36 months under way Beam characteristics (milestone): 36 months done

Target/horn station 13/07/2011M. Dracos3 Experimental HallExperimental Hall –MW Target Station –Decay Tunnel –Beam Dump Maintenance RoomMaintenance Room Service GalleryService Gallery –Power supply –Cooling system –Air-Ventilation system Waste AreaWaste Area decay tunnel (25 m) spare area beam target/horn station shielding horn power supply and electronics gallery hot cell

Detailed drawings (civil engineering) 13/07/2011M. Dracos4 Horn power supply and electronics gallery Water tanks Decay tunnel (6.6mx25m) Spare area Hot cell Beam dump Shielding (6m) 53m 38m 6m

Power Supply 13/07/2011M. Dracos5 10MODULES10MODULES ► For each HORN : current of 350kA max at 12.5HZ ► each MODULE delivers a current of 35kA max at F=50HZ Recovery energy : With self recovery energy Recovery energy : With freewheeling diode EUROnu5E-10v Ideal Stripline (0µΩ/m, 0µH/m) EUROnu5C-10v Normal Stripline 30M (10µΩ/m, 15nH/m) EUROnu6-10v Normal Stripline 30M (10µΩ/m, 15nH/m) SWITCHS/HORNS 240 K Є 840 K Є 320 K Є CHARGERS 456 KЄ 1260 KЄ 4000K Є CAPACITORS 160 K Є 380 K Є 285 K Є TOTAL 856 K Є 2480 K Є 4605 K Є

Target 13/07/2011M. Dracos6 Simple model/equations to characterise a packed bed target Assume parabolic energy deposition profile Obtain gas temperature as a function of transverse position

Proton Lines 13/07/2011M. Dracos7 dipole profile: < 2mwide x 2m height vacuum : > Angle1.25m/8m=156 mrad1.25m/11m= 113.mrad T beam sagita156 mm113.6 mm magnet profile< 1x1m pulsing25Hz - change polarity vacuum aperture Instrumentation: - beam position monitor - beam intensity monitor The target must cover the full beam not to be sensitive and have intensity variations typically 3 sigma ==> sigma_beam = 0.3 Radius (hallo~1%) magnet lengths: - dipoles : 2m - quads : 1m each - correctors : 0.7m (must add connections) double polarity dipoles (kickers) 2.5m 2m dipoles 6m distance total = 8m Quads Correctors instrumentation coll 2m dipoles 9m distance total = 11m 1m 2 m 1 m 0.5 m 2 m Total length = 11m Total length = 12m (thanks to Ilias)

Costing 13/07/2011M. Dracos8 Many items are already costed Power Supply: ~2.5 M€ (5% degradation after 10 years) Horns: ~1.2 M€ (including spares) Target: ? Target/horn hall+decay tunnel: ~200 M€ (~130 M€ for T2K, 4MW, including the beam line) HP-SPL:~350 M€ Accumulator:?

End 13/07/2011M. Dracos9