Environmental and Social Analysis in World Bank Projects Challenges to implementing more strategic approaches Glenn Morgan Regional Safeguards Advisor,

Slides:



Advertisements
Similar presentations
Country Environmental Analyses and Infrastructure Juan Carlos Belausteguigoitia Lead Environmental Economist World Bank IADB; November 2007.
Advertisements

BlackSea Region Meeting Varna Points raised by the EU Maritime Strategy of relevance for PlanCoast.
Operational Programme I – Cohesion Policy Event part-financed by the European Union European Regional Development Fund Evaluation Plan for Maltas.
EuropeAid Mid-Term Review (MTR) of the Strategy Papers Operational strategies to support to civil society participation Dominique Dellicour Quality of.
How can Parliamentarians contribute to a Positive Investment Climate? by Rainer Geiger Senior Regional Advisor, OECD 3rd Global Conference of Parliamentarians.
Linking NAPs to broader national strategies and processes.
TEEB Training Session 1: Integrating ecosystem services values into decision making.
1 Legal Empowerment of the Poor: An Action Agenda for the World Bank Ana Palacio April 19, 2006.
AN INTRODUCTION TO STRATEGIC ENVIRONMENTAL ASSESSMENT
System of Environmental-Economic Accounting SEEA Implementation Guide and Diagnostic Tool Alessandra Alfieri UNSD.
GREATER MEKONG SUBREGION CORE ENVIRONMENT PROGRAM Component 1: Environmental Planning Systems, Methods and Safeguards Improved Activity Progress and Component.
System of Environmental-Economic Accounting SEEA Implementation Guide and Diagnostic Tool and Suggested Structure for Assessment United Nations Statistics.
INTEGRATED ASSESSMENT AND PLANNING FOR SUSTAINABLE DEVELOPMENT 1 Click to edit Master title style 1 Integrated Assessment and Planning for Sustainable.
1 “Adaptation to the consequences of Climate Change: Progress achieved and capacity building needed” Budapest, November 19-20, 2007 Strategic Environmental.
Evaluation Office 1 Evaluating Capacity Development David Todd Senior Evaluation Officer GEF Evaluation Office.
ICZM in Europe Anne Burrill
Fifth Overall Performance Study (OPS5).  Objective  Analytical framework  Key issues to be covered  OPS5 audience  Organizational issues  Group.
AF Project Cycle and Approval Process Panama City, Panama Nov, 2011.
Results Focus in MDBs: Where Are We? Philibert Afrika, AfDB February 4, 2004.
The place-based approach for territorial cohesion in the EU policies 5 November, Rome Patrick Salez DG REGIO, Directorate for Policy conception and coordination.
1 Informing a Data Revolution Getting the right data, to the right people, at the right time, on the right format Johannes Jütting, PARIS21 Tunis, 8 Decemeber.
Unit 10. Monitoring and evaluation
Issues and Opportunities in Working with Supreme Audit Institutions (SAIs) Latin American and the Caribbean Region May 3, 2006.
INTOSAI Capacity Building Committee Meeting Stockholm, 8-10 September 2015 SAI capacity from a Post-2015 development agenda perspective The PASAI cooperative.
Toolkit for Mainstreaming HIV and AIDS in the Education Sector Guidelines for Development Cooperation Agencies.
Module 23 Environmental Safeguards Accreditation Training, January 21 – 25, 2013 Public Consultation.
Egyptian Environmental Affairs Agency National Capacity Self Assessment (GEF/UNDP) The Third GEF Assembly Side Event – 30 th August,2006 Cape town Integrating.
1 Mid-Term Review of the Hyogo Framework for Action Roadmap to Disaster Risk Reduction in the Americas & HFA Mid-Term Review.
Project Appraisal: Overview March 28, Country Level Rapid Assessments: Key Areas A. Status of Plans and Activities Current status of AI in the country.
World Bank Annual Meeting Policy Forum – October 10 th, 2013 Environmental and Social Assessment and Management: Strengthening all levels of the Integrated.
1 Inter-American Development Bank Environment and Safeguards Policy - A Strategic Overview.
World Bank Energy Sector Lending: Encouraging the World’s Addiction to Fossil Fuels Heike Mainhardt-Gibbs Bank Information Center – March 2009.
E NVIRONMENTAL STATISTICS STATISTICS DIVISION Regional Strategy for the implementation of SEEA: key features and reflections for the Caribbean Regional.
APEC ENERGY WORKING GROUP FRAMEWORK PROPOSAL FOR IMPLEMENTING ENERGY INVESTMENT RECOMMENDATIONS (November 2004).
Christopher Sheldon Senior Mining Specialist Mining Policy Division The World Bank Group Integrating Local Economic Development into World Bank Mining.
STRATEGIC ENVIRONMENTAL ASSESSMENT METHODOLOGY AND TECHNIQUES.
SEA in the Czech Republic Prague, 24 September 2008.
AfDB-IFAD Joint Evaluation of Agriculture and Rural Development in Africa Towards purposeful partnerships in African agriculture African Green Revolution.
European capacity building initiativeecbi Adaptation in the Paris Agreement Ambition and Permanence for the Cancun Adaptation Framework Juan P Hoffmaister.
River Basin Management in Southern Africa Barbara Schreiner.
AT THE CROSSROADS Secondary Education in Africa (SEIA) Initiative Past and Future.
Implementation of critical studies necessary to promote better planning and efficient management of hydropower projects in an Int’l River Basin context.
Public hearings of the Portfolio Committee on Water and Environmental Affairs on Environmental Impact Assessments (EIA) Ms. Grace Mkhosana Environmental.
Environment and Disaster Planning Hari Srinivas, GDRC Rajib Shaw, Kyoto University Contents of the presentation: -What is the problem? -Precautionary Principles.
Supporting policy development in the field of ICH in Africa CONCLUSIONS Constantine — ALGERIA 28 September to 2 October 2015.
1. Overarching Question “to what extent have IFAD financed interventions in market access met the institutional objectives of IFAD?” Overview and Methodology.
UNEP EIA Training Resource ManualTopic 14Slide 1 What is SEA? F systematic, transparent process F instrument for decision-making F addresses environmental.
Strategic Environmental Assessment in Poverty Reduction Strategies Session B1 IAIA International Experience and Perspectives in SEA 29 September :00-10:30.
AF Project Cycle and Approval Process Saly, Senegal 5 th & 6 th Sept, 2011.
Gulana Hajiyeva WB Safeguards Training Workshop Almaty, December 2012.
Pilot Project on implementation of SEA for regional planning in Ukraine Prof. Dr. Michael Schmidt Dmitry Palekhov Brandenburg University of Technology.
The Bank’s Regional HIV/AIDS Strategies An Overview.
ORGANIZATION CAPACITY ASSESSMENT (2013) Produced in April 2013.
World Bank Group Impact Evaluations: Relevance and Effectiveness Jeff Tanner Task Team Leader for Impact Evaluations Independent Evaluation Group Based.
Tools for Mainstreaming Disaster Risk Reduction: Guidance Notes for Development Organisations Charlotte Benson and John Twigg Presented by Margaret Arnold.
(I)WRM indicators A GWP PERSPECTIVE Water Country Briefs Project Diagnostic Workshop, Geneva, December 2010 Mike Muller : GWP-TEC.
Development Account: 6th Tranche Strengthening the capacity of National Statistical Offices (NSOs) in the Caribbean Small Island Developing States to fulfill.
Seite 1 GTZ Independent Evaluation in the Thematic Priority Area “Decentralization” (2008) Overview of Results and Recommendations Implications.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
Mitigation, Enhancement and Monitoring Session 9 Health in SEA.
Donor Coordination Process
5-b) 2012 Blueprint to Safeguard Europe's Water Resources
Ritva Reinikka, DECRG May 24, 2001
Advancing South-South Cooperation for Effective Implementation of
Implementation of Internal Control
Progress of the preparations for a White Paper on Adaptation to Climate Change Water Directors’ meeting Slovenia June 2008 Marieke van Nood, Unit.
5-b) 2012 Blueprint to Safeguard Europe's Water Resources
Strategic Environmental Assessment (SEA)
22nd WG D Meeting, 15/4/2012 Jacques Delsalle, European Commission
Fitness Check EU Water Policy
Presentation transcript:

Environmental and Social Analysis in World Bank Projects Challenges to implementing more strategic approaches Glenn Morgan Regional Safeguards Advisor, Latin America and Caribbean Region The World Bank October 10, 2013

Moving Assessments Upstream The presentations all represent the more general problem that investment projects as development interventions often do not provide a sufficient mechanism for evaluating strategic issues even though investments usually support important strategic objectives Instruments like SEA; CIA; analysis of country partnerships strategies are all attempts to work beyond transactional, project level constraints

Policy Basis for Upstream Assessments From a policy perspective the World Bank OP 4.01 recognizes and encourages projects to use of upstream assessments such as REA, SEA (see Annex A paras 6 and 8) which are referred to in different parts of the policy on EA The policy further encourages the use of and findings of country environmental studies, national environmental action plans, country’s overall policy framework, and so on (para 3 and 4) Policy recognizes, encourages and provides for flexibility to use and adapt different approaches matched to the specific context (para 7 EIA, Regional / Sectoral EA) Annex B para (d) lays out the suggested content of an EA including the articulation of baseline data that takes into account current and proposed development activities in the project area but not directly connected to the project (related and/or cumulative effects) Recognizes the legitimacy of other analytical tools such as regional development plans or least-cost power expansion planning (footnote 1-3 in Annex A)

Operational Challenges Projects are defined and/or constrained by – Short term temporal boundaries 3-5 years; – Limited geographic boundaries (depending on definition of area of influence) – project specific budgets which reinforce a silo approach – the bureaucratic imperatives of their proponents who are trying to meet short deadlines, budget cycles, election cycles etc. – project proponents often are only concerned about their own project and not the interaction with others All of these factors – to varying degrees - work against moving to a more strategic approach

Cumulative Impact Assessment Appropriateness of the CIA instrument and analytical approach in a project context. Strategic questions are often beyond the mandate of individual projects owners Lack of common or accepted methodology for CIA or other forms of strategic analysis often raise doubts about efficacy or relevance CIA /SEA can take many forms – the hydro example shows the accumulation of several projects in one basin; other CIA look at the cumulative interactions across sectors – e.g., irrigation, mining, land use, industrial/domestic water demands CIA could be more effective if we first set out our environmental and social management objectives and then evaluate the accumulation of interventions against those objectives. The application of strategic analytical approaches has been opportunistic in nature often involving task teams that take advantage of the specific context

Implementation Challenges Sequencing and timing of upstream work… – When and by whom? – How does the upstream work relate to project investments? – Financing and resources for strategic assessments How to ensure cost-effectiveness Knowledge and experience relevant to specific tasks. Do we have experienced technical people? Approaches which move forward with some investments while supporting strategic planning

Some operational approaches Capacity building and training of counterparts through investment projects Greater recognition of previous work that has been done by the client in the form of master plans, strategies, Working on safeguards more systematically at the country level. Gap analysis studies, portfolio risk reviews, thematic supervision Use P4R or other programmatic lending to address systemic issues, especially related to capacity building