European Developments Transmission Workgroup 3 rd May 2012.

Slides:



Advertisements
Similar presentations
Update on EU Tariff Framework Guideline Richard Miller UNC Transmission Workgroup 03/10/2013.
Advertisements

Update on Transparency Obligations Martin Reisner Junior Adviser, Transparency ENTSOGs Transparency Workshop Brussels – 11 September 2012.
European Developments Transmission Workgroup 5 th April 2012.
EU Developments Transmission Workgroup 3rd November 2011.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Framework Guideline on gas capacity allocation Stefanie Neveling, Co-Chair CAM TF 20 th Madrid Forum, 27 September 2011.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
European Gas Codes Update. Industry-wide seminar in conjunction with Ofgem and DECC  National Grid will be holding a workshop on 15th July on European.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
EU Implementation Programme Action TR1003: All to consider how to address EU developments going forward and send any identified issues to:
EU Developments. September Update  ACER Framework Guidelines on interoperability rules  Scoping paper still to be published  Rather than conduct a.
EU Developments Transmission Workgroup 6th October 2011.
European Developments Transmission Workgroup 1 March 2012.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
KEY CONSULTATIONS an overview Louise Masters InnogyOne, Innogy UK Offshore Wind 2003.
European Developments: Capacity Transmission Workgroup 6th October 2011.
EU Third Package: background and recent developments 15 th April 2010 UNC Panel European Strategy team.
1 South Gas Regional Initiative Work Plan Raúl Yunta Huete, South GRI Chairman 20 th Madrid Forum Madrid, 26 September 2011.
Global Competitiveness in a Liberalised EU Energy Market Wim Groenendijk, Member of the Board Brussels, 22 November 2011 Gas infrastructure and Markets.
1 Brussels, 27 th February th GRI Coordination Group South Gas Regional Initiative.
SO Incentives from April 2010 John Perkins. 2 Gas System Operator (SO) Incentives National Grid operates the high pressure Gas Transmission System in.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
EUROPEAN COMMISSION Transparency – Proposal to amend chapter 3 of the Annex of Regulation 1775/2005 EUROPEAN COMMISSION H. Hick, DG TREN C 2 NW GRI 5th.
Capacity allocation in natural gas transmission networks Framework Guideline (Pilot) Dr. Stefanie Neveling, ACER Workstream Co-Chair Walter Boltz, ACER.
EUROPEAN COMMISSION Heinrich Hick, DG TREN C 2 3rd IEM Package and relevance of GRI GRI NW stakeholder Conference, London, 14 November 2008.
EU Gas Balancing Code – Nomination Update [Revised to reflect action TX1002] Action TX1002: EU Balancing Code/Nominations: Provide an overview of what.
Implementation of Transparency Guidelines Martin Reisner Advisor Current Status and future Challenges Ljubljana – 13 September 2012.
Gas Regional Initiative Region North-West Transparency Project Nicola Meheran, Ofgem.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Proposer: Hayley Burden Panel Date: 17th April : Mod Title: Imbalance Charge amendments required to align the UNC with the Network Code on Gas.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Framework Guideline on gas balancing Martin Crouch, Ofgem 20th Madrid Forum September 2011.
Joint ACER-ENTSOG update on implementation of the Balancing NC 26 th Madrid Forum 16 October 2014.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
The EU’s Third Energy Package European Code Development UNC Transmission W/S - 4 th December 2008.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
Gas Roads & GTE Colin Hamilton (European Policy) 2 nd July 2009.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
European Developments Transmission Workgroup 1 st December 2011.
Walter Boltz, Chairman ERGEG Gas Working Group 17 th Madrid Forum 14 January 2010 Capacity allocation and congestion management in natural gas transmission.
Development Modification Proposal: Introduction of an Inter-day Linepack Product Review Group August 2010 Transmission Workstream 07/10/2010.
EU Phase 3 Customer communications
29th November 2016 Teleconference
21st IG Meeting South Gas Regional Initiative
6/3/2018 Second ACER-ENTSOG Report on the status of the implementation of the Balancing Network Code Dennis Hesseling Head of the Gas Department Bucharest,
EU Implementation Programme
Transmission Planning Code – Draft Document
Implementation of the Network Codes: ACER monitoring and SSE GRI state of play Dennis Hesseling, Riccardo Galletta, ACER 21st Stakeholder Group meeting,
18th July 2016 Teleconference
37th IG Meeting South Gas Regional Initiative
Update on European Network Codes
26th February 2015 Teleconference
37th IG Meeting South Gas Regional Initiative
18th July 2016 Teleconference
24th January 2017 Teleconference
37th IG Meeting South Gas Regional Initiative
Proposer: National Grid NTS Panel Date: 17th April 2014
26th February 2015 Teleconference
EUROPEAN TRANSPARENCY UPDATE
Implementation of the Network Codes: ACER monitoring and SSE GRI state of play Dennis Hesseling, Riccardo Galletta, ACER 21st Stakeholder Group meeting,
Exit Capacity Substitution and Revision
2/23/2019 Second ACER-ENTSOG Report on the status of the implementation of the Balancing Network Code Dennis Hesseling Head of the Gas Department Bucharest,
Transmission Planning Code Review
Gas Customer Forum 28 July 2008
EU CAM Network Code and CMP Guideline Proposal Update
Presentation transcript:

European Developments Transmission Workgroup 3 rd May 2012

Gas Balancing Update Transmission Workgroup 3 rd May 2012 Chris Shanley

Stakeholder Workshop Dec Jan Feb MarApr JuneJuly MayNovJunJulOct Apr Aug Sep Nov Invitation from Commission Submit Network Code Project launch 13/14 Dec 23 SJWS 7-8 SJWS Consultation May Workshop FG Development of Network Code with stakeholder on the basis of the final Framework Guidelines ACER Development of draft network code in cooperation with stakeholders ENTSOG Oct 9 SJWS 26 SJWS SJWS ENTOG - project plan 3 DateEvent 13 April 2012Public consultation on the Draft Code launched 9 May 2012Mid-consultation workshop 12 June 2012Deadline for responses to the public consultation 26 July 2012Post-consultation workshop 22 August 2012Code and supporting document published; Stakeholder process starts 4 September 2012Stakeholder Support process ends 5 November 2012Final ENTSOG – drafted Code submitted to ACER

Consultation Phase  Balancing Draft Code and Consultation issued 13 April  The response deadline is 17:00 CET 12 June  The ENTSOG consultation and other documentation can be found at:  ENTSOG have requested that responses are:  Focused and succinct as possible and provide supporting evidence where available  Made via the formal consultation response form

Mid-consultation stakeholder workshop  There will be a Workshop in Brussels on 9 th May  Opportunity for an exchange of views about the Supporting Document and Draft Code  Agenda TBC but expected to concentrate on key stakeholder issues/concerns  Please register via the ENTSOG website

EU Gas Balancing Draft Code  There are 11 chapters and 46 pages of text  NG has identified some minor issues with text and these are being progressed directly with ENTSOG  NG initial view is that the code is generally consistent with framework guidelines and GB regime but some impacts have been identified Chapter Title 1General Provisions 2Balancing System 3Cross-border cooperation 4Operational Balancing 5Nominations 6Daily Imbalance Charges Chapter Title 7Within Day Obligations 8Neutrality Arrangement 9Information Provisions 10Linepack Flexibility Services 11Implementation, Interim measures and entry into force

NG initial impact assessment of draft Network Code against UNC (1) ChapterConflict or inconsistency?TSO Obligation 1. General Provisions Network code shall prevail over another network codes or national legislation 2. Balancing System None identified 3. Cross- border cooperation Consultation on options 4. Operational Balancing Short term standardised products: No GB physical product defined but product could be replicated by Location Market Transaction Temporal Market Product (an optional tool available to NG)

NG Initial IA of draft Network Code against UNC (2) ChapterConflict or inconsistency?TSO Obligation 5. NominationsNew Nomination process required for Interconnection Points (IPs) Interactions with CAM, CMP, interoperability still being analysed by NG Daily and hourly nominations (at IP) – consultation on whether harmonisation is required 6. Daily Imbalance Charges Marginal prices and average price to only include Title Market Products 7. Within Day Obligations (WDOs) Consultation on any proposal to introduce a WDO 8. Neutrality Arrangements None Identified

NG Initial IA of draft Network Code against UNC (3) ChapterConflict or inconsistency?TSO Obligation 9. Information Provision NDM Derived Forecast – day ahead at UTC (timescale linked to IP Nominations process) More frequent info - Cost Benefits Analysis (CBA) and consultation 10. Linepack Flexibility Service Prior approval of proposal by NRA 11. Implementation, Interim Measures and Entry into force Interim measures are unlikely to apply to GB TSOs have 12 months to comply after code comes into force TSO can request an additional 12 months (24 months in total) Annex 1. Definitions Gas day (5:00 to 5:00 UTC)

Consultation questions of interest to GB stakeholders  57 questions raised  Views on key elements of a daily balancing regime and the level of detail provided:  Operational balancing and trading related questions (Q5 to Q14  Daily Imbalance charges and small adjustment (Q19 to Q23)  Neutrality (Q30 to Q36)  Level of detail in the code (Q55 to Q57)  Views on the new Nomination process for IPs  Nominations (Q15 to Q18)

Interoperability Update Transmission Workgroup 3 rd May 2012

Interoperability Update  Reminder that ACER’s consultation on the draft Framework Guideline closes on 16 th May 2012  We would encourage the industry to respond  We will present a summary of the National Grid NTS response at the June Transmission Workgroup

EU CAM Network Code and CMP Guideline Proposal Update Transmission Workgroup 3 rd May 2012

Capacity Allocation Mechanism (CAM) - Update  CAM Network Code was formally issued to ACER 6 th March  ACER need to provide an opinion on the compliance with the CAM Framework Guideline by 6 th June  ENTSOG continue to discuss with ACER questions in relation to the CAM code  Centred around withholding capacity  The sale of unbundled capacity  Technical Interconnection Point Mismatches  Incentive Release.  Tariffs.  Establishing Virtual Interconnection Points.

Congestion Management Procedures (CMP) Guidelines - Update  Revised CMP Guidelines sent via Ofgem to GB stakeholders 10 th April  Further comments provided from National Grid to DECC and Ofgem.  Discussions held at GB Stakeholder meeting on the 13 th April 2012 prior to the Comitology meeting.  Comitology meeting held 20 th April 2012.

EU Updates Timetable  Timetable aims to highlight the key items (consultations, workshops, decisions, etc.) National Grid NTS expect to cover via this agenda item in the forthcoming months TopicTX Workgroup CAM update Summary of NG response to Interoperability FG consultation June 2012 Output from SJWS on TYNDP / Final ENTSOG TYNDP proposal July 2012