1927 Flood. Floods of the 70s Floods of the 90’s.

Slides:



Advertisements
Similar presentations
Ecosystem Flows Hydrology and Connectivity Joe Trungale October 2, 2006.
Advertisements

Steep unstable or moderately stable slopes are a common concern in watersheds on Vancouver Island. Urban development, logging, road building and exploration.
Stream Geomorphology Leslie A. Morrissey UVM July 25, 2012.
1 Floodplain Management SESSION 7 Stream Systems on Dynamic Earth Floodplain Management Principles & Practice Prepared By Donald R. Reichmuth, PhD.
Gravel Mining Ryan Kindt Kristina Lowthian CIVE 717 April 9, 2012 Gualala River, California fly-over, Courtesy: Jamie Hall.
Pine Valley Country Club Stream Restoration: Phase 2 Proposal Presented March 17, 2003 Greg Jennings, NC State Univ Barbara Doll, NC Sea Grant Dave Bidelspach,
Watershed System Physical Properties Stream flow (cfs) Stream Channel Pattern Substrate Chemical Properties pH Dissolved Oxygen Temperature Nutrients Turbidity.
Channel Repair of Montezuma Creek in Coronado National Memorial following Fire and Flood Damage Stephanie Yard, P.E. & Allen Haden, Aquatic Ecologist Natural.
The Mission Reach Ecosystem Restoration Project: Floodplain Management Within a Multi-Objective Project Paradigm Steven Schauer San Antonio River Authority.
Habitat Assessment Developed by Ken Cooke Kentucky Division of Water Watershed Watch Program Coordinator Modified by Mike Kemp Professor of Environmental.
Lewis Creek Reach M19 Phase 1, Phase 2, and Phase 3.
ENSC 202 – 2004 Lab 1 - Introduction Watershed Assessment (ENSC 202) Lab 1 Extracted from Vermont ANR Stream Geomorphic Assessment Protocols Handbook -
Watershed Assessment (ENSC 202)
Stream Geomorphic Protocols Introduction Vermont Stream Geomorphic Assessment Protocols Extracted from Vermont ANR Stream Geomorphic Assessment Protocols.
Geomorphic Effects of Dams on Rivers Gordon Grant.
West Virginia University Natural Stream Restoration Program An Interdisciplinary Program Focusing on Research, Education, and Professional Services in.
Greg Jennings, PhD, PE Professor, Biological & Agricultural Engineering North Carolina State University BAE 579: Stream Restoration Lesson.
Ecology and environment, inc. International Specialists in the Environment The McKinstry Creek & Riparian Area NYSDOT Rt. 219 Mitigation Project Analysis.
Hydrosapiens GIV eSAT of Vermont: Water Group 2013 Ben DeJong, Nina Brundage, Caitlin Beaudet, Julie Rickner, Mariah Ollive, Hannah VanGuilder, Heather.
Watershed Assessment and River Restoration Strategies
Modern Urbanized Stream Water Quality Improvement Technologies Creating a Net Zero Water Quality Impact Solution in the Natural Environment.
Stream Ecology: River Structure and Hydrology Unit 1: Module 4, Lectures 1.
Unimpaired connectivity between active channel and floodplain Eliminated connectivity between active channel and floodplain Impaired connectivity between.
Habitat Presentation 1 Phil Kaufmann --- USEPA, Corvallis, OR
Emily Shimada, Environmental Science, University of Idaho Research Team B: Watershed Management in the Andean Paramo Faculty Advisors: Dr. Alex Fremier,
Step 1: Assess Riparian Resource Function Using PFC §1d. Complete PFC assessment l 17 questions about attributes and processes l Reminder – PFC based on:
Project Activity: Riparian Zone Restoration Scott Compton, Watershed Program Manager Valles Caldera National Preserve.
Channel Modification Washington Dept. Forestry, 2004, Channel Modification Techniques Katie Halvorson.
Review of the Nipissar Lake Replenishment Project, Rankin Inlet, Nunavut September 25, 2014 NWB Hearing Presentation Type A Water License Amendment Application.
Shoshone-Bannock Tribes Fish and Wildlife Department.
Chumstick Creek Salmon Habitat Conditions* Land development, road construction, and other human activities have affected channel migration and sediment.
Icicle Creek Salmon Habitat Conditions* Land Development has affected stream channel movement, off channel habitat, and LWD recruitment. Barriers to migration.
Stream Processes and Habitat Ryan Johnson. Overview Watershed Processes – Factors and their effects on the watershed as a whole Stream Processes – Factors.
Greg Jennings, PhD, PE Professor, Biological & Agricultural Engineering North Carolina State University BAE 579: Stream Restoration Lesson.
Mission, Brender, and Yaksum Creeks Habitat Conditions Low flows and associated high temperatures affect distribution and abundance of native species.
Understanding Creeks, Rivers, and Riparian Areas.
 Four measures related to channel condition  Sinuosity (pool formation)  Pool/Riffle Development  Channel Modification  Channel Stability.
Natural vs. Accelerated Soil Erosion Natural geologic erosion has occurred at a relatively slow rate since the earth was formed. Natural erosion produces.
Importance of the Lower Wenatchee River in Salmon Recovery* The Lower Wenatchee is a critical migration corridor for all ESA listed species Of the total.
Nason Creek Salmon Habitat Conditions* Development, and road building have affected riparian (streamside) habitat, large woody debris and gravel recruitment.
2012 TRB State Representatives Annual Meeting July 24, 2012 Leading in Lean Times Rich Tetreault, PE Vermont Agency of Transportation.
Post-Flood Training - Municipal Officials/Contractors Rick Weidenbach, Executive Director Delaware County Soil & Water Conservation District Scotty Gladstone,
7. Bedforms in coarse-grained channels Step-pool units Cluster bedforms Riffle-pool sequences.
Design and Implementation of Large Wood Structures at Twelvemile Creek Prince of Wales Island Tongass National Forest The Nature Conservancy TEAMS Enterprise.
Qualitative Habitat Evaluation Index Bradley Hansen John Nieber Department of Bioproducts and Biosystems Engineering For BBE 4535/5535 Fall 2011.
Erosion and Deposition Do Now 1.What are the four main agents of physical weathering? 2.Give two examples of chemical weathering. 3.What factors influence.
Watershed Monitoring *Background Watershed Stewardship Plan-2004 Gap Projects IRWMP-Dec Policies SFEI study-2007 Joint TC/WC meeting-June 2010 *Proposed.
River Pathways Riparian Plants. Why Care About Riparian Vegetation? Many of the functions and values of riparian areas are dependent upon streamside vegetation.
NHACC Annual Meeting 2014 New Approaches to Restoring NH’s Rivers Natural Channel Design and Dam Removal Peter J. Walker.
LO – To understand the changes in river process with distance from source - To understand Long and Cross Profiles of a river.
Stream Geomorphic Assessment of Allen Brook Jarrett Arthur, Amy Myers Shea Hagy, Mike McDonald.
Bridges Reach analysis Fundamental tool for design
Crow/Quartz Creek Instream Large Wood Recruitment
Ministry of Education and Sports Department of Student Affairs
4 channel types defined at reach scale, based on 3 features
Fluvial Geomorphology
4 channel types defined at reach scale, based on 3 features
Stream Geomorphic Assessment of Allen Brook
Water Testing Project for the North Fork River
6.1 BASIC ENGINEERING New ‘modernised’ diversion structures have promoted larger inequity in the distribution of irrigation water between upstream and.
Strategies to Reduce P Loading and Sedimentation on Forestry Operations in Vermont First few slides will provide some background information on what we.
The shapes of stream channels
Streams and Rivers cont’d
Warmwater Streams Chapter 19
Common Stream Habitat Problems
Module # 17 Overview of Geomorphic Channel Design Practice
Kristel Riddervold Environmental Sustainability Manager
Module # 8 Channel Evolution Implications & Drivers of Instability
Kastanis- Existing Conditions
Longitudinal Profile Survey for Successful Culvert Replacement
Presentation transcript:

1927 Flood

Floods of the 70s

Floods of the 90’s

Irene

Flash Floods

Flood Disasters Since 1927 Vermont has experienced a large-scale disastrous floods once every 14 years. From , Vermont has suffered approximately 25 disastrous floods of regional-scale. Data Source: VT DEC Rivers Program

Vermont’s River and Road Training

– Past Flood Experiences: Irene and all the others – VTrans Irene Recovery Committee Priority VTrans staff Municipal road crews Contractors need to better understand how rivers work – ANR Priority Decrease impacts of road repairs to river stability Increase River Engineer efficiency in the field Decrease impacts of road repairs to instream habitat – State Legislative Directive – Forecasts for Increases in Flood Frequency Why a Rivers and Roads Training?

The Equilibrium Standard “An activity shall not cause a stream to depart from, further depart from, or prevent it from attaining the channel width, depth, meander pattern, and longitudinal slope associated with the stream processes and equilibrium conditions as they occur naturally in a given reach of stream.” ANR’s Stream Alterations Regulatory Goal: “Manage Toward River Equilibrium”

River Equilibrium Width Depth Roughness Slope Discharge Sediment Size and Quantity Equilibrium Depends on:

– Tier One: Awareness – Tier Two: Developing Understanding and Skills – Tier Three: Design and Construction Oversight River and Road Training Structure

Tier One: Awareness Online training that provides a general awareness and understanding of river processes, aquatic habitat and how transportation infrastructure affects and is affected by river stability.

Provide participants with: – An understanding of the mechanics or processes at play in river systems – The ability to recognize the difference between stable and unstable rivers – The skill to identify type, severity and causes of river instability – The ability to recognize important aquatic habitat features – The skills required to design and build river stability and habitat into road construction projects Tier Two: Developing Understanding and Skills

What to Expect

Rivers and Roads Field Manual

Important Features of Aquatic Habitat Riparian Vegetation “Clean” substrate Coarse Streambed Material Channel Dimensions Riparian Vegetation “Clean” substrate Coarse Streambed Material Channel Dimensions

Use VT Standard River Management Principles and Practices Guidance to: – select – design – oversee construction of projects……….. involving river instability and crossing structure repair and/or replacement. Tier Three: Design and Construction Oversight

Improving our management of day-to-day and post-flood stream alterations is a key component of Vermont’s River Resiliency Strategy