MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.

Slides:



Advertisements
Similar presentations
2010 MEASURE C FACILITIES IMPROVEMENT PROGRAM Proposed Implementation Plan September 14, 2010.
Advertisements

SHORELINE SCHOOL DISTRICT Site & Facilities Assessment September 22, 2008 SHORECREST HIGH SCHOOL.
Tam Valley School Modernization - Phase 1 Summer 2011.
1 Zero Tax Increase Referendum: Community Information Session.
MARPLE NEWTOWN SCHOOL DISTRICT FACILITIES. Maintenance & Small Projects Planned for Summer 2007 New carpet at Worralls office New fencing at Worralls.
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
June 8, 2011 Irvine Unified School District. What is a Modernization? Eligibility Permanent buildings - 25 years old Portable buildings - 20 years old.
Park School Modernization Summer New paint, new glass, new landscape, new flagpole, and new paving Before After Entry.
COMING NOVEMBER 2012 SHAWNEE HEIGHTS BOND REFERENDUM MORE INFORMATION WILL BE AVAILABLE SOON ON THE SHAWNEE HEIGHTS DISTRICT HOMEPAGE.
Measure G Information August 2014 Enhancing Educational Opportunities at every school in Norwalk and La Mirada.
Del Mar Union Schools Facilities Master Plan Update September 19, 2012.
Cambrian School District 5-year Facilities Maintenance Plan Update 8/25/11.
Measure G Overview March 9, Measure G School Facility Improvement East Side Union High School District To provide greater security and safety, relieve.
Current Project Update October 25th 2012 Good Evening!!!
May 6, 2010 Irvine Unified School District HMC Architects.
Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect.
Finance and Facilities. DuPage County, IL EAV Growth History (Five Year Average: -2.15%)
Capital Project Presentation As approved through formal resolution by the RCS Board Of Education on March 11,2015. This new presentation outlines the $750,000.
Glenbard Township High School District 87 Facility Master Plan Steering Committee July 20, 2011.
Facilities Update Site Improvements Encinitas Union School District September 5, 2006.
SCHEMATIC DESIGN PRESENTATION
2014 Bond Issue Projects September 22, On August 5, 2014 the voters of South Lake Schools passed a $25 million bond proposal This PowerPoint will.
© Baltimore County Public Schools Schematic Design Presentation Catonsville Elementary School at Bloomsbury 1104 Kenilworth Dr. Suite 500 Towson,
BVUSD Facility Workshop September 17, Board Policy-BP 7110 The Board of Trustees recognizes the importance of long-range planning for school facilities.
Rio Del Oro Riverside Meadows Cobblestone. Plumas Lake Elementary School District ( Maintenance Department ) Here’s the life cycle I use for our Deferred.
C APITAL I MPROVEMENT PROGRAM FY 2015/16 – FY 2020/21 August 14, 2014.
GUHSD CITIZENS COMMUNITY MEETING MARCH 24-26, 2015 Facilities and Capital Budget Overview This Presentation Will Be Posted On Our Website:
PBSD - Transportation and Maintenance Facility Project Status Report – 1460 Greensburg Road Plum Borough School District Richard Zucco & Michael Brewer.
Facility Construction Project Workplan 2012 A Presentation to the Board of Education Prepared by Facilities and Planning May 15, 2012.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. April 28, 2008 Prepared by:
Torrance Unified School District Bond Measure Y Bond Measure Z Quarterly Construction Update September 30, 2009.
Trinity Lutheran Church Major Maintenance Tuesday, February 17, 2015.
$18 million bond Construction of new Junior High campus Construction of safety improvements at Elementary School campus  Storm Shelter  Fire Safety.
Bond Expenditure Report Per A.R.S. § (K) 7/1/13 - 6/30/14.
Lincoln Consolidated Schools Citizens Steering Committee Bond Issue Final Recommendation Board of Education Meeting October 18, :00 p.m.
Successful Bond Programs (Community Engagement) Cathy Allen, Chief Operations Officer Facilities Support Services September 22,
Capital Improvement Program for September 9, 2014.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District January 23, 2012 EDUCATE  ENGAGE  EMPOWER 1.
MIDDLE TOWNSHIP PUBLIC SCHOOLS BOND REFERENDUM March 8, 2016 Bond Referendum BUILDING FOR OUR FUTURE.
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO, ILLINOIS High School Building Project.
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
Riley County – USD 378 Community Forum 2 23november2015 Riley County School District.
DEFERRED MAINTENANCE PROGRAM UPDATE REPORT Accomplishments and 2016 Planned Events October 1,
Measure G Bond Projects. Message from the President ….. Monument Refurbishment Project.
SINKING FUND PROPOSAL OCTOBER 3, SINKING FUND ADVISORY COMMITTEE PURPOSE: DEVELOP A LIST OF RECOMMENDED PROJECTS FOR THE 2012 SINKING.
HVAC Installation Projects Administration and Multi-purpose Buildings Elementary Schools|1 Dolland 2 Edmondson 3 Moffitt 4 Sanchez Middle School| 5 Waite.
Facilities Focus Group
White Pigeon Community Schools
Bond Project Update September 2017
Vassar strong vision Inspire Future Excellence…Learn, Achieve, Succeed
Cornwall Central School District
Capital Improvements Presentation
Dr. Joseph Meloche Superintendent of Schools Mrs
4 November 2013 LEHIGHTON AREA SCHOOL DISTRICT.
UNION GROVE ELEMENTARY REFERENDUM
2018 Bond Review and Proposal
DOVER ELEMENTARY Existing MPB (2/14/12).
Troy School District Bond Program – Series 1 Construction Update
Charter Oak Unified School District
Capital Outlay Workshop
Facility Advisory Committee Meeting
Recent Bond Accomplishments
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
Master Facilities Committee Evaluation and Identification
Chimacum District Facility & Program Plan
Troy School District Bond Program – Series 1 Construction Update
EAST PENNSBORO AREA SCHOOL DISTRICT
Dixon Middle School Project Update
Zumbrota-Mazeppa School District Community Survey Results
FY19-28 Capital Improvement Program Request
Presentation transcript:

MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015

Bond Measure Goals To upgrade classrooms to meet academic, technology and safety standards Repair faulty electrical systems, air conditioning, leaky roofs, plumbing and restrooms Improve fire safety systems and school security Remove asbestos and lead paint; and Repair, construct and acquire educational facilities and equipment

Current Status What progress has been made since the February 10, 2015, Board Meeting? o The following plans have been submitted to DSA: Golden West, Lincoln, Lathrop & Sequoia. Increment 1 – July, 2015; Increment 2 – August, 2015 o The DSA review period is expected to take until the end of October The anticipated schedule is to begin construction November, 2015 and finish by August, 2016

Timeline

Issues and Resolutions HEALTH & SAFETY: o Fire alarm systems at all sites o Surveillance cameras at all sites o Bells, clocks and paging systems at all sites o Campus entry – all visitors must enter through a supervised entry o Paving – new asphalt paving and walks o Fencing to secure campus core MAINTENANCE: o In conjunction with Prop. 39 – new HVAC systems o Roofing replacements o Dry Rot, exterior painting, door and hardware repairs & replacements CODE COMPLIANCE: o ADA compliance: parking, paths of travel, toilet rooms o Hazardous material abatement MODERNIZATION o Replacement of facilities: combination of new construction and repurposing existing spaces o New finishes: carpet, paint, floor tile, window coverings o Renovation of existing casework

Closer Look – Lincoln Elementary Safety features typical of all sites Safer Site Entry: Admin/Cafeteria on Powers instead of Yosemite o Repurposed Administration Office o Code compliant kitchen and cafeteria Modernized Kindergarten facilities that meet CDE recommendations Modernized non-compliant bathrooms Modernized classrooms o New doors, frames and hardware o New casework that meets ADA o New plumbing fixtures o New HVAC units and grills o New roofing o New flooring o Interior paint Removal of “poor” relocatable classrooms Repurposed cafeteria = new classrooms/media center Replaced paving Budget: $12M

Closer Look – Lathrop Elementary BUDGET $14.5 M Safety features typical of all sites New 12,300 s.f. Classroom wing; (4) Kindergarten, (6) Classrooms, student and staff restrooms and storage areas Safer Site Entry for student access to the Multi- purpose building Relocated Admin. Office Kindergarten facilities that meet CDE recommendations Modernized (minor) classrooms Safer campus entry. Controlled via the Admin. Office New SDC and Parent Workroom Modernization (major) o New casework that meets ADA o New plumbing fixtures o New HVAC units and grills o New ceilings o New flooring o Interior paint o Upgraded student restrooms Removal of “poor” relocatable classrooms Relocated and upgraded outdoor classroom for Farm to fork program Improved bus and parent drop-off areas Reconfigured parking New kindergarten play area

Closer Look – Sequoia Elementary Safety features typical of all sites Eight (8) new classrooms Safer Site Entry: Admin/Cafeteria on Wawona instead of Martha o Repurposed Administration Office o Code compliant kitchen and cafeteria Modernized non-compliant bathrooms Modernized classrooms o New doors, frames and hardware o New casework that meets ADA o New plumbing fixtures o New flooring o Interior paint o New window coverings Removal of “poor” relocatable classrooms Improved site drainage to eliminate ponding Replaced paving Budget: $8.4M

Closer Look – Golden West Elementary Safety features typical of all sites Safer Site Entry: Admin/Classrooms at the front of the site o Repurposed Administration Office o Code compliant kitchen addition o New toilet room building Modernized non-compliant bathrooms Modernized classrooms o New doors, frames and hardware o New casework that meets ADA o New plumbing fixtures o New flooring o Interior paint o New window coverings Removal of “poor” relocatable classrooms Repurposed Admin. spaces Improved student drop-off area, parking lot and paving Budget: $14M

Closer Look – Shasta Elementary Safety features typical of all sites Safer Site Entry: New Admin located at the front of the site o Repurposed Administration Office Modernized non-compliant bathrooms Modernized classrooms o New doors, frames and hardware where needed to repair dry rot o Exterior wall framing to repair dry rot o New roofing where needed o Exterior paint Removal of “poor” relocatable classrooms New seven (7) classroom building including three (3) kindergarten classrooms Repurposed Admin. And former kindergarten spaces Improved parking lot Replaced paving to eliminate ponding Budget: $8.4M

Recap BUDGET – project budgets were established by the 2014 Facilities Master Plan focusing on the following several categories of need. Priority has been given to: o Health & Safety, Deferred Maintenance, Modernization and Code Compliance o The goal is to accomplish work from each of those categories listed at all District sites. o Budgets are “not to exceed” budgets WORST FIRST -- Sites were selected on the basis of the worst sites first coupled with a site’s modernization eligibility. The goal is to submit each project to OPSC so that if funding becomes available reimbursement funds will be available to use on future projects HEALTH & SAFETY – All sites are scheduled to receive: o Fire Alarms o Surveillance cameras o Bells, clocks and paging systems