Redefining the Role of the Overall Responsible Operator May 18, 2016 53 rd Annual Northeastern Ontario Water Works Conference Alex Salewski Ministry of.

Slides:



Advertisements
Similar presentations
Review of the Incident Command System
Advertisements

1 Documentation Legal Framework Air Navigation Orders Guidelines ATS Manual Airport Manual Safety Management Manual ICAO Annexes Licenses / Certificates.
Module N° 3 – ICAO SARPs related to safety management
Organizational Governance
BCs Drinking Water Action Plan Dr Shaun Peck Deputy Provincial Health Officer Ministry of Health Services.
[Organisation’s Title] Environmental Management System
INTRODUCTION TO ISO Joan Kithika. OUTLINE DEFINITIONS WHY ENVIRONMENTAL MANAGEMENT? LEGAL OVERVIEW HOW TO MANAGE THE ENVIRONMENT-AN ENVIRONMENTAL.
Ensure Vendor/Engineer of Choice Product Quality
29e CONFÉRENCE INTERNATIONALE DES COMMISSAIRES À LA PROTECTION DES DONNÉES ET DE LA VIE PRIVÉE 29 th INTERNATIONAL DATA PROTECTION AND PRIVACY COMMISSIONERS.
October In May 2000, Walkerton’s drinking water system became contaminated with deadly bacteria, primarily Escherichia coli O157:H7.1 Seven people.
1 The critical challenge facing banks and regulators under Basel II: improving risk management through implementation of Pillar 2 Simon Topping Hong Kong.
Investments Institute of Insurance and Risk Management (IIRM) Hyderabad, India 15 November 2005 Arup Chatterjee – Advisor International Association of.
Nathan Saunders, P.E. Maine Drinking Water Program Public Water System Owner & Operator Responsibility.
Contractor Safety Management
Due Process – ISSAIs and INTOSAI GOVs Roberto José Domínguez Moro Superior Audit Office of Mexico INTOSAI Working Group on Public Debt October, 2009.
Contractor Management and ISO 14001:2004
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
What SMS means for an Operator’s relationship with the CAA
ISO 9001:2008: Key changes and transition process
BS EN ISO 14001:2004 Madlen King BSc MSc MIEMA EMS Lead Assessor Lloyd’s Register Quality Assurance Ltd BS EN ISO 14001:2004.
TC176/IAF ISO 9001:2000 Auditing Practices Group.
Protection Against Occupational Exposure
Control environment and control activities. Day II Session III and IV.
FDA Recalls Risk Communication Advisory Committee David K. Elder Director, Office of Enforcement.
DIFSC 2011 Increasing Managerial Responsibility to Ensure Food Safety: The Concept of A Trained Person in Charge Asia Al Raeesi Acting Head of Food Studies.
1 CHCOHS312A Follow safety procedures for direct care work.
Session No. 3 ICAO Safety Management Standards ICAO SMS Framework
New Decade - New Challenges Annual Conference September 2010 Water Services Training Group 14 th Annual Conference New Decade – New Challenges 9 th September.
Paid Feeding Assistants Guidance Training CFR §483.35(h), F373.
Developing an accessibility strategy. In this talk we will discuss an accessibility strategy an accessibility policy getting started - steps to consultation.
IAEA International Atomic Energy Agency Reviewing Management System and the Interface with Nuclear Security (IRRS Modules 4 and 12) BASIC IRRS TRAINING.
Session 5 Integrating CLAS Into Policy and Practice CLAS Training [ADD DATE] [ADD PRESENTER NAME] [ADD ORGANIZATION NAME]
NO FRAUD LEFT BEHIND The Effect of New Risk Assessment Auditing Standards on Schools Runyon Kersteen Ouellette.
Presented by: Meg Boyd The Blue Mountains Drinking Water System: DWQMS Overview.
1 Public Hearing to Consider Proposed Amendments to the Emission Inventory Criteria and Guidelines Regulation for the AB 2588 Air Toxics “Hot Spots” Program.
Health and Safety Policy
Safety organization and training. The biosafety officer and biosafety committee A safety policy, A safety manual, and Supporting programmes for their.
Corporate Governance Yoshi Kawai Secretary General, IAIS IAIS-ASSAL Regional Seminar Buenos Aires, Argentina, November 2011 PUBLIC.
School for drafting regulations Nuclear Safety Operation Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
Private & Confidential1 (SIA) 13 Enterprise Risk Management The Standard should be read in the conjunction with the "Preface to the Standards on Internal.
ໂດຍ: ວິສອນ ໄຊສົງຄາມ ກົມຄຸ້ມຄອງສະຖາບັນການເງິນ, ທະນາຄານແຫ່ງ ສປປ ລາວ
1 The Use of Institutional Controls Under the RCRA Corrective Action Program.
Circuit Rider Training Program (CRTP) Circuit Rider Professional Association Annual General Meeting and Conference August 30, 2012.
Dispensary and Administration Site Information Presentation.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Guidance Training (F520) §483.75(o) Quality Assessment and Assurance.
Due Process – ISSAIs and INTOSAI GOVs Roberto José Domínguez Moro Superior Audit Office of Mexico INTOSAI Working Group on Public Debt October, 2009.
International Security Management Standards. BS ISO/IEC 17799:2005 BS ISO/IEC 27001:2005 First edition – ISO/IEC 17799:2000 Second edition ISO/IEC 17799:2005.
1 Waste Discharge Authorization Application - British Columbia WG6 Application Process WG Document Review presented by Helga Harlander October x, 2008.
Presentation to Association Municipalities of Ontario Implementation of Management of Excess Soil - A Guide for Best Management Practices Ministry of the.
Office of Human Research Protection Georgia Health Sciences University.
Module N° 6 – SMS regulation
Supervisory Officer ???? January 29, 2016 Presentation to the Ontario Public Supervisory Officers’ Association – Leadership and Effective School Board.
The Use of Actuaries as Part of a Supervisory Model Michael Hafeman – Consultant World Bank May 2004.
Estates across STFC This presentation is to give PPD the opportunity to respond to proposals for the future management of Estates across STFC The proposals.
Revision N° 11ICAO Safety Management Systems (SMS) Course01/01/08 Module N° 9 – SMS operation.
Research Policy: ORD & ORO Working Together Brenda Cuccherini, PhD Office of Research & Development & Tom Puglisi, PhD Office of Research Oversight.
Public Consultation Session: Consultation and Transparency Requirements for Offshore Petroleum Activities Francesca Astolfi A/g General Manager, Offshore.
TC176/IAF ISO 9001:2000 Auditing Practices Group.
COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT WATER QUALITY CONTROL DIVISION Regulation 100 Update September 2011.
1 Vereniging van Compliance Officers The Compliance Function in Banks Amsterdam, 10 June 2004 Marc Pickeur CBFA CBFA.
Roles and Responsibilities of the IRO. Role and Responsibilities of IRO When consulted about the guidance, children and young people were clear what they.
AUDIT STAFF TRAINING WORKSHOP 13 TH – 14 TH NOVEMBER 2014, HILTON HOTEL NAIROBI AUDIT PLANNING 1.
Slide 1 Standard Operating Procedures. Slide 2 Goal To review the standard operating procedures Creating the informed consent document Obtaining informed.
Project Management Processes
Background (history, process to date) Status of CANs
Project Management Processes
How to conduct Effective Stage-1 Audit
Internal Control Internal control is the process designed and affected by owners, management, and other personnel. It is implemented to address business.
Presentation transcript:

Redefining the Role of the Overall Responsible Operator May 18, rd Annual Northeastern Ontario Water Works Conference Alex Salewski Ministry of the Environment and Climate Change

Today’s Presentation Potential changes in the Overall Responsible Operator Requirements Result of consultation to date Potential approach Operators-in-training working alone 2

Overall Responsible Operator: Why Was It Established? Ensure the person responsible for operational decisions in a system has the skills, knowledge and experience required. The Overall Responsible Operator (ORO) was not intended to include persons in managerial, administrative, compliance or engineering positions who do not perform active daily operation of the a system. The ORO was intended to: Be accountable for operational/process control decisions within the system. Be accountable for ensuring applicable corrective actions within their authority are taken in the event of adverse operational conditions. Not about position title or union/management affiliation. Key is the performance of the duties. 3

4 Why Is the MOECC Considering Changes to the Overall Responsible Operator Designation? Municipal and operating authorities stakeholders have raised concerns regarding operator supply/succession planning. Lack of consistency in how ORO is adopted in municipalities. In some municipalities designation does not address legal intent. Main issues are a result of: Lack of clarity on requirements of an ORO; On-call issues; Operating experience seen as an barrier for persons to become an Overall Responsible Operator. Underlying these concerns are potentially large number of retirements of operators within next 5 years.

Range of Current Interpretations 5 Director Manager Supervisor Operator Director Manager Supervisor Operator Director Manager Supervisor Operator Director Manager Supervisor Operator Manager

Findings of Consultation MOECC’s Operator Certification Working Group and an ad hoc committee of operators/managers met throughout 2015 and early 2016 to review issues and options. Participants reported a diverse range of ways ORO is adopted: Operational model Managerial/oversight model Emergency response model Several short listed options considered: No clear preference was found. Impact of options based on how municipality currently interprets ORO. 6

Findings of Consultation Other results from the consultation: Allowance for non-operators to be able to fulfill the role of ORO. Terminology ORO and OIC was found to be confusing and participants had difficulty understanding the difference in the roles. Provisions in the regulations which allow for back-up OROs need to be maintained. Impacts on Northern Ontario and remote operations need to be considered. Hands-on operational experience is an important requirement for certification. 7

Approach To Be Considered Operational Lead: Person Overseeing All Operational Work During a Shift Operator: Person Performing Process Control Changes 8 Direct Charge: Person Independently Making Process Control Decisions/Directs Operators *If individuals perform day-to-day operational role they may be considered an Operational Lead or Direct Charge.

Purpose of Roles Operational Lead*: Identify a single accountable person for operation decisions made in a facility who has appropriate level of knowledge and experience as determined by class of certification. Direct Charge: Establish legal obligations on persons responsible for making process control /system integrity decisions which may impact quality of drinking water or effluent; and Category of operational decision making responsibility which is required to obtain a Class III or IV certificate. Operator: Define persons who are required to hold an operators licence/ certificate. 9 *Note: An operational lead would be a Direct Charge operator.

Operational Lead Redefine the Overall Responsible Operator as an operational role which has responsibility and oversight for day-to-day operations for the whole system/facility during a shift. 10 Roles and Responsibilities Direct or supervise other operators during an operational shift on process control/system integrity decisions. Ensure that all process control decisions within the facility are made in accordance with regulatory requirements, operational manuals or standard operating procedures and with the aim of protecting human health and the natural environment. Ensure that applicable authorities are notified and proper procedures are followed in the event that he or she is aware of an adverse operational condition or event during an operational shift.

Direct Charge Redefine the Operator-in-Charge role to clarify and make distinct from the Operational Lead role. One or more operators may be assigned Direct Charge responsibilities. Operational Lead includes Direct Charge responsibilities. 11 Roles and Responsibilities Independently makes process control or system integrity decisions. Ensures processes within their control and responsibility are operated effectively, monitored, measured and sampled. Ensures records of process control decisions within their authority are maintained.

System Requirements Owners must designate an operator who is certified to the level of the facility as the Operational Lead for each staff shift. This operator must be present or able to act (e.g. on call). During non-operational shifts a P.Eng. or C.E.T. may act as the operational lead provided that they consult with an Direct Charge operator certified to the level of the system prior to making any process control decisions. P.Eng. or C.E.T. would be required to complete training through the Walkerton Clean Water Centre or pass applicable certification exams. One or more operators with Direct Charge responsibilities must be assigned. 12

Operator Scope of Work “Scope of work” of an operator can be clarified and reviewed to ensure it addresses the modern role of an operator: Current definition of operator is broad and includes language which can be ambiguous. Align definition to duties typically performed by operational staff. Need to consider distribution and collection work as part of that definition. Potential to provide clarification as to certification requirements for “minor” process adjustments - for example taking equipment off-line for maintenance when approved by an Direct Charge operator. 13

Where In the Organization Does the “Operational Lead” Belong? May or may not be a supervisory role. If supervisory would normally be front line supervisor. Generally not intended as a manager or director role unless that person is involved in day-to-day operational process decisions. In smaller facilities the Operational Lead could be the sole operator or could be a senior manager with direct responsibility of day-to- day operations. 14

How Would New Definitions Work? 24/7 Operation 15 Shift 1 Shift 2 Operational Lead “A” (On-site) Operational Lead “B” (On-site) or Operational Lead “A” On-call (Off-site) Oversee operational work during shift Oversee operational work during shift All operators who independently make process control decisions would need to be assigned as Direct Charge operators.

How Would New Definitions Work? Single Day Shift Operation 16 Day ShiftUnstaffed Night Shift Operational Lead (On-site) Operational Lead or P.Eng. /C.E.T. (On-call/Off-site) ( Ability to consult with Direct Charge Operator ) Oversee operational work during shift All operators who independently make process control decisions would be designated as Direct Charge operators (including Operational Lead)

Further Considerations Currently operators one class lower than the system classification may act as a “back-up” ORO for up to 150 days. Would back-up provisions continue? Definition of “process control decisions” particularly in distribution/ collection systems. Definition of “present or able to act”. Impacts of potential changes on contingency planning. Implications for remote systems. 17

Operators-in-Training Working Alone Current regulations allow OITs and others not designated as ORO or OIC to work alone. MOECC considering clarification of conditions which must be in place for an OIT and others who are not designated as Operational Lead or Direct Charge to be able to work alone. Conditions may include: OIT is trained on their scope of responsibilities. OIT is not independently making process control decisions. Approved process control changes are logged and reviewed by an OIC within a specific period of time (to be determined). Operational Lead or Direct Charge operator “routinely” on site to monitor work and assess the overall operational condition of the system. “Routinely” may be defined using a risk approach (i.e. frequency of visits may differ depending on situation) 18

Future Steps Ad hoc committee will continue to meet to help scope final option. If changes are anticipated through regulatory amendments or guidance, the changes will be posted on the Environmental Bill of Rights Registry for comment. 19

Questions Ontario Water and Wastewater Certification Office Ministry of the Environment and Climate Change Alex Salewski Tel