CEE 492 Lab Session #1 February 3, 2012 1. CEE 492 RS Means –Introduction –Exercise ICE MC2 –Installation –Introduction and Overview Outline.

Slides:



Advertisements
Similar presentations
INFORMATION TECHNOLOGY. HARDWARE 1.MAINFRAME COMPUTERS Large computers that process huge amounts of info for a firm quickly However, they are expensive.
Advertisements

Cost Estimation in a Construction Company Under the guidance of Prof. K. Narayanan Department of Humanities and Social Science Indian Institute of Technology,
M II Presenting Micro-Computer Aided Cost Estimating System (MCACES)
LiberRATE Estimating It thinks like you do! Edition 3 Instructions Click on buttons to advance or to repeat the previous slide PreviousNext.
Systems analysis and design copyright m.a.walkley 2001 Function Point Analysis Estimating.
Copyright Professional Estimating Systems, Houston, TX, USA
Presenter: Victor C. Tyler, P.E. Estimating and Bidding Strategies that Drive Best Practices.
Chapter 14 Pricing General Expenses. Objectives Upon completion of this chapter, you will be able to: –Define general expenses –Use a checklist to identify.
Step Up Payback Proposal Program “How-To” 9/4/07.
Building Systems Design, Inc. A new cost estimating system designed exclusively for design professionals...
BHSestimator for Windows
PLUMBING DESIGN © Copyright 2008 HVAC Design Solutions1 Essential Design Programs with Accurate Sizing Calculations help to “Streamline Your Design” Essential.
ATTENTION This presentation breaks down the purchasing process into 6 steps, which are then detailed in the subsequent slides. While responding from either.
Objectives In the 1 st half of this Module we’re going to cover: The computerized estimating process. How a Contractor comes up with his Material Costs.
OLAP Cubes and Pivot Tables Leveraging the Power of a Microsoft EPM Solution EPM Customization Series Part 1 February 21 st, 2007 Brendan Giles, PMP, MCP.
Assemblies Estimating Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
Mark Dixon Page 1 07 – Reports. Mark Dixon Page 2 Session Aims & Objectives Aims –To use reports to produce more readable documents Objectives, by end.
Specification Report CSCI Requirements of Specification Report  Must be clear and intelligible to client  Must be complete and detailed to result.
Chapter 9 Pricing Construction Equipment. Objectives Upon completion of this chapter, you will be able to: –Identify the three main equipment categories.
Using Anti-virus Software A SeniorNet Workshop SeniorNet is a service program of the Lutheran Service Society of Western Pennsylvania.
Chapter 11 Pricing Concrete Work. Objectives Upon completion of this chapter, you will be able to: –Describe the job factors and the labor and management.
Chapter 5 Application Software.
March 2005 UMORS 1 UMORS Vander Kooi and Associates, Inc Ultimate Multiple Overhead Recovery System.
Tango Asset Management Capabilities Presentation 1.Desktop & Web Architecture 2.Equipment Management 3.Condition Management 4.Data Mining 5.Parameter Trending.
I n t u i t C o n f i d e n t i a l 1 IDN Gold Developer Solution Builders Software Enterprises May 7th, 2007 Rick Powell, President
Construction Engineering Management Project Costing
© Paradigm Publishing, Inc. 5-1 Chapter 5 Application Software Chapter 5 Application Software.
PeopleSoft NA Payroll 8.9.
1 I n t u i t C o n f i d e n t i a l QBES-Compatible Applications for Certified Payroll & AIA Billing Solutions Introduction Presentation Date: December.
This presentation is the property of Paradigm Information Systems It is confidential to the intended recipient for the purpose of evaluating FMS Any other.
Calculation BIM Curriculum 07. Topics  Calculation with BIM  List Types  Output.
1 RMS-QCS Introduction July RMS & QCS Resident Management System (RMS) P rogram used by Government QA Personnel to support Construction Quality.
Chapter 8 Pricing Generally. Objectives Upon completion of this chapter, you will be able to: –Describe the general process of pricing a construction.
WJEC Applied ICT Spreadsheet Skills 1.Introduction to Financial Modelling Definition A model is a program which has been developed to copy the way.
Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out Square Foot Estimating.
Objectives Overview Identify the qualities of valuable information Describe various information systems used in an enterprise Identify the components of.
ISU Alumni Association Online Store Abstract The Iowa State University Alumni Association desires a complete overhaul of their online store. The current.
OLAP Cubes and Pivot Tables Leveraging the Power of a Microsoft EPM Solution EPM Customization Series Part 1 February 21 st, 2007 Brendan Giles, PMP, MCP.
Cost and Time Control. Project completed on time and on budget –Want to get done early –Lower costs –More profit.
BMT WMS Models and Options Manager Using WMS MoM to build and manage a Builder’s Model & Option database.
© 2007 by Prentice Hall 1 Introduction to databases.
ITGS Case Study Theatre Booking System Ayushi Pradhan.
The Dark Side of Document Imaging: ‘The Hidden Cost of Capture’
© Paradigm Publishing Inc. 5-1 Chapter 5 Application Software.
Intermediate 2 Software Development Process. Software You should already know that any computer system is made up of hardware and software. The term hardware.
S OURCES OF E STIMATION D ATA. 1. Company  s Own Cost Data From Previous Projects  Advantages  It reflects quality and productivity of its own equipment.
Microsoft Dynamics ® NAV 2009 Service Management.
1 Chapter 3: Getting Started with Tasks 3.1 Introduction to Task Dialogs 3.2 Creating a Listing Report 3.3 Creating a Frequency Report 3.4 Creating a Two-Way.
Chapter 3 Part 3 – Presentation Tool Impress for Linux.
OVERHEAD COSTS IN BUILDING CONSTRUCTION IN SAUDI ARABIA Author: Mohammad Al-Shahri (1997) Presented By Fawaz Al-Ghamdi January 1, 2005.
I. About Us Our Product Freedom for Bedding Business Management Sales and Marketing Operations Management Conclusion About Us Our Product Freedom for.
PRODUCTION MANAGEMENT SOFTWARE. WHICH DO YOU PREFER? 2.
CONTROL-M Training At Global Online Trainings IND: Skype: Global.onlinetrainings USA:
CIS 115 AID Peer Educator/cis115aid.com FOR MORE CLASSES VISIT
CEE 492 Lab Session #1 February 3, CEE 492 RS Means –Introduction –Exercise ICE MC2 –Installation –Introduction and Overview Outline.
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 8 Sources of Estimation Data.
 1- Definition  2- Helpdesk  3- Asset management  4- Analytics  5- Tools.
DR. Nabil Dmaidi F ACTORS THAT D ETERMINE V ARIATION IN E STIMATES.
ENGINEERING n MANAGEMENT n ENVIRONMENTAL
ERP/QMS by PMI Aerospace ERP/QMS by PMI Aerospace
Process Economics Factors that affect profitability
Estimating and Scheduling CEE 492
SOURCES OF ESTIMATION DATA
Introduction to Operating Systems
BASIC INFORMATION ABOUT DATABASE MANAGEMENT SOFTWARE
M II Presenting Micro-Computer Aided Cost Estimating System (MCACES)
How to transfer inventory items in quickbooks In the Transfer Inventory dialog box, enter details such as, the transfer date, item code, quantity transferred,
Epicor iScala 3.2 What’s New Mobile Solutions.
ESTIMATE TAKE-OFF & RELATED MATH WORKSHOP - Part 2
Presentation transcript:

CEE 492 Lab Session #1 February 3,

CEE 492 RS Means –Introduction –Exercise ICE MC2 –Installation –Introduction and Overview Outline

Introduction to RS Means RS Means is a division of Reed Business Information. It provides cost information to the construction industry so contractors in the industry can provide accurate estimates and projections for their project costs. It has become a data standard for government work in terms of pricing, and is widely used by the industry as a whole. RS Means is accessible online, via CD-Rom, or in book form, and it also integrated in a variety of cost estimating software packages to allow for fast and reliable estimating. Cost information is updated annually These national-average costs can be adjusted to over 900 locations in the United States and Canada using the Location Factors provided.

RS Means Contains S.F. and per unit cost data

Definitions: –Daily Output: typical number of units a crew will install in a 8-hour day –Labor-hours: total number of labor-hours required to install one unit of work Crew = 1 person Daily output = 8 units Crew = 3 people Daily output= 8 units RS Means

Attached is a figure from R.S. Means estimating manual. This figure shows line item for a typical page from the unit price cost data book. The next slide shows the crew and equipment used to perform the work. Ⓒ

Crews are referenced later in R.S. Means RS Means

RS Means Exercise Have to excavate 31,200 C.Y. (Bank Measure) in three working weeks using a crawler mounted hydraulic excavator and load it onto trucks –How much would this cost?

Answer 31,200 C.Y. / 15 days = 2,080 C.Y. per day For this daily output we use a 3 C.Y. capacity excavator 31,200 C.Y. x 1.33 (total cost per unit) = $41,496 Since were loading onto trucks add 15%: $41,496 * 1.15 = $47,720

RS Means Exercise If the daily production for line 300 is lowered to 925 C.Y., find the man- hours per unit and bare costs for labor and equipment Ⓒ

© 11 Workshop 1 Solution Ⓒ Step 1: Calculate new crew productivity  Crew is B-12D  From Crew Table, existing crew productivity = 16 MH/day  Existing productivity is 16MH/day x 1 day/1620 CY = = MH/CY  Therefore, new crew productivity is:  16 MH/day x 1 day/925 CY = MH/CY Answer

© 12 Workshop 1 Solution Step 2: Calculate bare labor costs  Labor costs (from Crew Table):  $ $153.6 = $340/day  Existing labor costs per unit:  $340/day x 1 day/1620 CY = $0.21/CY  Therefore, new labor costs per unit:  $340/day x 1 day/925 CY = $0.37/CY Ⓒ Answer

© 13 Step 3: Calculate bare equipment costs  Equipment costs (from Crew Table):  $2017/day  Existing equipment costs per unit:  $2017/day x 1 day/1620 CY = $1.25/CY  Therefore, new equipment costs per unit:  $2017/day x 1 day/925 CY = $2.18/CY Ⓒ Answer

Introduction to MC2 ICE = Interactive Cost Estimating MC2= Management Computer Controls In business for over 40 years, before releasing any Windows based products. –42% of top 100 contractors* –Over 6,000 users worldwide Other software: Timberline Best for G.C. Cost information from RS Means –Can be modified * Ref: ENR May 21/28,

15 MC2 Flowchart Estimate Maintenance Where all items are seen in one place, with Detail Add Item / Multiple Items Company Standard PROJECT INFO General Info Pricing Codes (labor Rates) Crews (Trade Codes) Sort Types & Code Waste Factors % SUMMARY Markups Taxes overhead Profit UNIT PRICE CATALOG UPC (Database) Project Info Name, Conditions Company Standards Construction Systems Miscellaneous Items KNOWLEDGE BASE ESTIMATE SPECIFIC Summary Spreadsheet Wizards Assembly Reports COPY / PASTE Source: Greg Ollar, MC2

The ICE Estimating Process  The Five Steps of ICE Estimating 1.Create and set up a new estimate. 2.Perform takeoff 3.Review and adjust the estimate. 4.Print Reports 5.Analyze the estimate totals