G-10 CPA March 2016 Bill Sands. Design Criteria Structure must support the CPA panels and Field Cage Differential contractions must be identified and.

Slides:



Advertisements
Similar presentations
Structural Steel Construction
Advertisements

Welding Details.
Heavy Concrete Construction Formwork
Pipe Supports and Hangers
Commercial Framing C D Prints Unit 13.
Service Technician Training
Click on this image to open the full PDF document.
Homemade EVO Valve Spring Compressor Tool. Parts List 1.One O2 Sensor Socket 2.One 1”diameter washer (1/2” inside) 3.One 3” piece of ½” square metal tubing.
MICE- AFC Unit Mechanical Design of the Cold Mass Support System Oxford University Rohan Senanayake.
Lesson 4 Shell Plating and Framing.
You will be making a few new parts and re- drilling a few holes to size. READ ON,,,,, 3/8” bolt Brass bushingNylon bushing 2 reinforcement plates 2 Delrin.
Q1-Q3 Cryostat Ideas Mike Anerella / Paul Kovach / Jesse Schmalzle November 5, 2013.
CEA UNIT 3 TERMS & DEFINITIONS. BEAM A structural member, usually horizontal, that carries a load that is applied transverse to its length.
Design of Tension Members
2- Crankshaft, Piston Pin, and Piston Rod Bushing.
Manufacturing Assembly Plan P Mechanical Spine Test Platform.
 What is joinery? In our case – we will be looking at the fastening or combining of two or more boards together when building our projects.  It is important.
Lesson No. 11 Week No. 07 Name of lesson Marking Tools
SQXF Shell & Yoke Assembly Procedure
H. Felice - P. Ferracin – D. Cheng 09/19/2013 Update on structure CAD model.
LBNL Test Cryostat Preliminary Design Review Tuning – Field Correction Soren Prestemon, Diego Arbelaez, Heng Pan, Scott Myers, Taekyung Ki.
BEAMS AND COLUMNS PRESENTED BY K.ROSHIN RUKSHANA.
Candela Display Systems 3x2 Interactive Video Wall System.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
TURBO FLANGES We specialize in design, CNC milling, metal turning, plasma cutting, and TIG welding all done in house. Please contact us for further information.
ILC / ILD TPC Requirements of the support mechanics Volker Prahl ILD Workshop 2013 Cracow
FLARE Constructing the detector First FLARE Workshop November 4-6, 2004 Rafael Silva Fermilab / PPD / MD Fermilab Liquid Argon Experiments.
UPDATE ON THE CRYOSTAT DESIGN AND INSTALLATION SEQUENCE.
ID 1.75 Material list: aluminum ¼ X ¾ X 6 in flat bar ¾ X 6 in round stock 1 X 6 in round stock 2 ea 5/16 heli-coil Weld 1” joints.
Chapter 4 Design of Tension Members Structural Steel Design, Fifth Edition, McCormac and Csernak, 2012 (International 1.
Brookhaven - fermilab - berkeley US LHC ACCELERATOR PROJECT LHC IRQ Inner Triplet Review Q1, Q2, and Q3 Mechanics T. Nicol April 24-25, 2007.
Safe Spot ME 4182 Prototype Review #1 March 29, 2006 J.J. Couvillion - Drew Bartlett - Manish Patel - Nick Roberts - Elisha Mellitz.
Unit 91 Week 14 Jon Gutierrez, Chris Sauer, Simon Radomski, Chat Huynh, Jeff Burton, & Robert Platt November 19, 2008 Prototype Review Week 3.
CPA Micarta Based Rahul Sharma / Bill Sands. The present design shown in this document is based on the use of Micarta as the base material this will likely.
Considerations for increasing the single-phase fiducial volume Jim Stewart July EFIG J stewart - EFIG July
Chapter 23: Structural Drafting
Shear Test Assembly update
LMQXFA Cold Mass Assembly Antonios Vouris Fermilab February 3, 2016.
Considerations for increasing the single-phase fiducial volume Jim Stewart July EFIG.
Fork and Pallet Design Hans Jostlein March 13, 2007.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
Wire and Cathode Planes - Current Concept (work in progress) PPD Internal Review – 2 nd Part April 19 th, 2005 Rafael Silva FLARE Fermilab Liquid Argon.
Bridge Engineering (2) Bridge Forms 1. *Introduction 1.1 Beam bridges (Dongming YR Brdg)Dongming YR Brdg 1.2 Arch BridgesArch Bridges 1.3 Cable-supported.
CPA: Decisions, Issues, Next steps Francesco PIETROPAOLO CERN / INFN-Padova Field Cage CPA and Integration/Installation week, BNL, March 11th, 2016.
Single-Phase ProtoDUNE Construction Planning Jim Stewart LBNC January 11, 2016.
MICE RF Coupler Modifications Update 4/30/2015 Allan DeMello.
CONCEPTUAL DESIGN OF D2 MECHANICAL STRUCTURE (DOUBLE COLLARING OPTION) S. Farinon, P. Fabbricatore (INFN-Sezione di Genova) Sept. 24 th 2015.
QXF Reaction / Impregnation Fixtures J. Schmalzle 4/9/13.
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
1 IST development status  Seattle  Composite Design.
Recent Changes to the FD TPC Design Bo Yu Oct. 20, 2015.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
Single Spoke Resonator SSR1 Construction Status P.N.Prakash Inter-University Accelerator Centre, New Delhi, INDIA.
TPC Support Installation 26 Apr 2016Dan Wenman Mechanical Engineer1 Overview Installation of the support rails Details of the rail from the SAS to the.
ProtoDUNE – DSS Installation, Alignment and QA
Tilt N’ Store Design Analysis
Requirements of the support mechanics
Pressure vs height (solid CPA plane)
TPC Support and Constraint TPC Support
Design of Distribution Feedbox at LHC P7
1.6 Allowable Stress Allowable Load < Failure Load
Challenges for FCC-ee MDI mechanical design
Limited Streamer Tubes
Tool ID Week 7 Clamps and Vises.
Additional Upstream Coil Shielding
Tilt N’ Store Design Analysis
SNS PPU Cryomodule Thermal Shield
Bunker Wall Design Wall ESS
Single Detector Design
Presentation transcript:

G-10 CPA March 2016 Bill Sands

Design Criteria Structure must support the CPA panels and Field Cage Differential contractions must be identified and compensated for Movement of the cryostat must be accounted for CPA panel must be kept as planer as possible Assembly should be simple enough be done in the cryostat

This is a six column CPA as suggested by Dan Wenman to compensate for roof deflections of the cryostat each column can move slightly independently. This is a dual panel CPA design with two 1/8” panels supported by 3 X ¾” ribs

Overall Dimensions

To compensate for the differential CTE in the material longer pieces such as panels and ribs will be cut out in the same direction.

Main Hanger Horizontal Bracket Vertical Bracket

The horizontal brackets have a 1” spacer so the plates are not tightly compressed to the panel allowing movement but keeping the panel planer. Vertical brackets need not move so they are screwed directly to the ribs

The main hanger is fabricated from G-10 the upper triangular portion is ¼” thick. We may want review if this is necessary or if a single support would do.

Main Horizontal support tube the G-10 tube is 2.5” diameter with a ¼” wall and the stainless steel inner reinforcement tube is 2” diameter with 1/8” wall

SS Reinforcement Tube G-10 Tube SS Panel Hanger

Panel hanger slides into the slots in the G-10 and stainless tubing and fits to the ID od the SS reinforcement tube.

Main Hanger Pin

Main Hanger Stainless Pin

Main Support Ribs

To get the length needed for the vertical tubes we can get some epoxy that is good in cryo temperatures and slip fit and pin them to length

Elbow Connections Screw placement needs to be determined the vertical G-10 tubes basically see no load the load is carried by the support ribs

Weldment to end reinforcement tubes to fit to the 2.5” stainless elbow

Pivoting HV Donut

HV Horizontal Extension to be welded to Donut HV Pivot Feature HV Pivot Securing Plug and Screw Arm Securing Screw HV Tee

Conclusion It is my opinion with some tweaking this is a viable design for the CPA