GLAST LAT ProjectDec 17, 2003 Page 1 GPR Design & Requirements Grid Perimeter Ring (GPR) Design –Ring is comprised of four lengths of Aluminum bolted together.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectMarch 24, 2003 HPS Tracker Peer Review, WBS Section 2-D 1 GLAST Large Area Telescope: Tracker Subsystem WBS Structural.
Advertisements

Gripper Designs By Pragnay Choksi. INTRODUCTION Hands of robots referred to as Grippers No single design is ideal for all applications.
CMS ZDC Crane Emergency Payload Removal Procedures This document proposes the viability of using a portable hydraulic actuator Hand crane (Davit crane)
Vacuum Vessel Production Readiness Review
FDR Station 3 lift fixture, laser screens and brackets T. Brown and L. Morris with analysis support from A. Brooks December 3, 2007.
MICE Collaboration Meeting at Frascati, Jun 26~29, 2005 Iron Shield Mounting Design Stephanie Yang.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 7.1 Stress Analysis 1 GLAST Large Area Telescope:
AAE450 Spring 2009 Mass Savings and Finite Element Analysis (FEA) Preparation for Orbital Transfer Vehicle (OTV) 100 gram Case Tim Rebold STRC [Tim Rebold]
Screws, Fasteners, and the Design of Nonpermanent Joints
July GLAST Project Installation Review LATLAT 1 Tracker Tower Installation Review Peter Amnuaypayoat
GLAST LAT Project I&T Meeting – Jan 29,2004 E. Gawehn 1 GLAST Large Area Telescope: MGSE Status Report Eric Gawehn SU-SLAC I&T MGSE Engineer
Buckling Critical Load Considerations
GLAST LAT ProjectLAT Mgr’s Meeting LAT Planning Meeting Mechanical/Thermal Systems March 17, 2005 Marc Campell.
GLAST LAT ProjectOctober 1st, 2004 GLAST LAT Tracker Anomaly Resolution Team 1 TMCM connector stay clear problem Alessandro Brez INFN - Pisa
Page 1 GLAST LAT ProjectAugust 30, 2004 GLAST Large Area Telescope: LAT Accelerometer and Thermal Instrumentation Review Presented by Leonard Lee John.
Manufacturing Assembly Plan P Mechanical Spine Test Platform.
GLAST LAT ProjectDecember 2, 2003 R. Johnson Engineering Meeting 1 GLAST Large Area Telescope: Tracker Subsystem WBS Tracker EM Vibration Test Status.
Setup of laser tracker on DX side NOTE: X axis along M1s centers, towards SX Z axis along M1-M2 centers, towards M2.
APPENDIX A (RFI) FOR THE FABRICATION OF MULTIPLE STEEL REACTION STRUCTURES FOR NASA-MSFC STRUCTURAL TESTING Mike Roberts 12/2/09.
Mantle Clock. Beginning Steps Cut 2 piece 20 x 5 to make the 2 sides and top/bottom Cut 1 10 ¾ and 1- 9 from each 20 piece. This will make a side and.
Addendum to EDMS document “Instruction Manual for inserting the CMS ZDCs using the HXTC crane” In addition to the ZDC detectors in the TAN instrument.
Lesson No. 11 Week No. 07 Name of lesson Marking Tools
J-FRM-0101 Revision with Reason No.DateInitials Drawing No. D’Vinyl Inc. Descriptive Part Name Designed byChecked by Engineer Drawing Type Foot Plate Date.
MUON_EDR-06 (Alignment) Enrique Calvo Alamillo February 28-March 1, 2002 Link Mechanics: Status.
GLAST LAT ProjectIntegration and Test CDR Peer Review, March 28, 2003 Document: LAT-PR Section 7 - Page 1 GLAST Large Area Telescope: I & T Peer.
ERT352 FARM STRUCTURES TRUSS DESIGN
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems X-LAT Assy1 GLAST Large Area Telescope: Mechanical.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.1 Grid Box Design 1 GLAST Large Area Telescope:
LATLAT Beam Test Workshop 20th March GLAST Program Beam Test Workshop CU Outer Shipping Container Michele Pinchera
LAT-TD GLAST LAT Project 1x4 Grid Lift Fixture Weld Analysis September 19, 2003 Youssef Ismail.
Analysis of Metrology Data from First Two Small Disks Stephen Pate 5/11/111.
AAE450 Spring 2009 Finite Element Analysis (FEA) for Orbital Transfer Vehicle (OTV) Tim Rebold STRC [Tim Rebold] [STRC] [1]
STATUS of the final PACMAN bench integration PACMAN meeting 11/06/2015 Hélène Mainaud Durand.
Spacecraft Interface/Handling Ring Robert Besuner 12 August 2004.
LAT-PR Section 33-1 GLAST LAT ProjectMechanical Design Integration Peer Review, March 2003 Mechanical Design Integration Peer Review, March 2003.
Problem-1: A rigid coupling has a bore diameter of 50 mm. Four machined bolts on a bolt circle of 125 mm diameter and fitted in reamed holes. If the bolts.
Conceptual design of JPARC Horn 2 assembly L. Bartoszek Bartoszek Engineering/CU 5/5/04.
Trigonometry Section 3 – Solve Application Problems using Right Triangle Trigonometry.
CLIC Permanent Magnet Quadrupole Engineering Development of second family member Norbert Collomb, STFC Daresbury Laboratory 1N. Collomb 07/11/2012.
GLAST LAT ProjectMarch 08, 2004 Page 1 ACD Installation, Post LAT CDR Response to GLAST LAT CDR RFA Number 13: MGSE Detailed Dimension Study [for ACD Installation]
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems Radiator Assy1 GLAST Large Area Telescope: Mechanical.
GLAST LAT Project Page 1 ACD Installation, Post LAT CDR Response to GLAST LAT CDR RFA Number 13: MGSE Detailed Dimension Study [for ACD Installation] –A)
TVAC Trolley Design Review1 GLAST LAT Project8 September 2005 TVAC Trolley Design Status Review 8 September 2005 TVAC Trolley Design Status Review 8 September.
Mass Simulator Concepts Robert Besuner 12 October 2005.
LEGO Construction Tips.
1 03/21/2006 GLAST CU Beam Test Workshop Scanning Table.
LAT Transport Container1 GLAST LAT Project8 September 2005 LAT Transport Container Design Review 8 September 2005 LAT Transport Container Design Review.
Building LEGO Robots For FIRST LEGO League By Dean Hystad
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.3 Fab & Assy Plans 1 GLAST Large Area Telescope:
Status of report on chapter 6: Warm cryostat mechanical calculation PH-DT Engineering Office, CERN Page 1 CERN, May 20th 2015.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 LAT I&T MGSE Page 1 of 11 GLAST Large Area Telescope: I&T Integration Kickoff Meeting MGSE March.
ESS Bunker A concept for a common beamline interface. ISIS Engineering Group, February 2015 For illustration purposes a conceptual CAD model of the VOR.
Magnetized Beam LDRD: Design Tasks February 19, 2016.
QXF Reaction / Impregnation Fixtures J. Schmalzle 4/9/13.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
Extra / Discussion Slides. 2 1.Helium Top Fill Port Add extra CF/ISO flange as collar so that the weld-region is not disturbed 2.Helium bottom FillCF.
GLAST Large Area Telescope:
Week 2 Experimentation TS Term 2.
Hawkeye Mechanical Design Snapshot
Technical Budgets Mass Power Pointing knowledge and accuracy
1/10 prototype support tube
GLAST Large Area Telescope:
TKR and LAT Survey and Alignment Planning
Roof design Bunker Project CDR
Introduction and Overview
Senad Kudumovic Design engineer
GLAST Large Area Telescope:
Bunker Wall Design Wall ESS
US-HiLumi – Shipping Post Assembly Status
Q2 Bus Update C. Narug, R. Bossert 6/27/2019.
Presentation transcript:

GLAST LAT ProjectDec 17, 2003 Page 1 GPR Design & Requirements Grid Perimeter Ring (GPR) Design –Ring is comprised of four lengths of Aluminum bolted together Cross Section of each length is 4” x 6” 90º Corner Joints are bolted using four ½” Dia 180 KSI Bolts Each Corner Joint Bolt is preloaded to ½ of bolt capability Each corner includes two capped Taper Pins & marking to ensure consistent assembly-disassembly-reassembly Outer dimensions of GPR “square” are 95.5” x 86” –Clearances for hand work about Grid / LAT exterior perimeter: »TBD” on Radiator sides »TBD” on Non-Radiator sides Meets EWR Factor of Safety Requirement of 5+ x against Ultimate Material Strength for 1g Operations –Factor of Safety reduces to TBD with consideration of SLAC Seismic Requirement –Assumes fairly tight tolerance for interface between LAT Grid and Grid to GPR Brackets

GLAST LAT ProjectDec 17, 2003 Page 2 GPR Design & Requirements, Cont. GPR to LAT-Grid Interface –Tight tolerance at Radiator corner Mount Bracket (RMB) clevice This reduces shock load in earthquake and ensures load sharing between all four RMBs and GPR to RMB system Plan is to attach Grid to GPR Brackets to GPR, use LAT Lift Fixture to lower GPR Brackets into RMB interface and match locate final clevice hole through GPR to Grid bracket RMB to Grid is the weakest link in the GPR to LAT chain of interfaces) (Design Integration to confirm with values ? TBR) LAT Grid is much stiffer than GPR-Bracket system –1 st harmonic of GPR is ~ 2 Hz; Well below earthquake excitation frequency –LAT Grid and GPR-Bracket system must share load in earthquake »RMBs must have Design Factor of Safety of > 1.4 against yield for earthquake due to personnel working under load

GLAST LAT ProjectDec 17, 2003 Page 3 GPR Design & Requirements, Cont. Design Integration has requested a stiffer GPR –Need more explanation of need and rationale, but easiest ways to obtain stiffness are: Make GPR of Stainless Steel –GPR should not be magnetically permiable –1 st Harmonic with CRES GPR is TBD Increase “height” of beam for each desired LAT rotation orientation (i.e., this means the entire cross-section due to LAT assembly orientations) –Can dramatically increase stiffness this way –Conflicts with Optical Survey Lines of Sight Requirements

GLAST LAT ProjectDec 17, 2003 Page 4 GPR Design & Requirements, Cont. Optical Survey Issues –Top of TKR must be within a zone that is 0.2 mm [ 0.008” ] wide about its perimeter (This needs confirmation, so TBC for now) To make measurements consistent with NIST protocol, the measurement system shall have a resolution that is ten times the item being measured; In this case, a resolution of 0.02 mm [ ” ] Laser Tracker Measurement System, typically used at SLAC and proposed for use with the LAT has a resolution of 100 microns [ ” ], or roughly 0.004” –A resolution that is about half of what we’re trying to measure –Further measurement accuracy complications exist due to 1g effects to LAT-Grid system as it is built up –Not consistent with NIST protocol »What will be done with measurement data? Go-No-Go Feeler Gauge can be used to make clearance measurement –What to do if Go-No-Go Gauge doesn’t fit ?