Www.iid.com Imperial Irrigation District 2016 Integrated Resource Plan: Imperial Irrigation District April 18th, 2016.

Slides:



Advertisements
Similar presentations
Planning for a Low-Carbon Future at San Diego Gas & Electric Rob Anderson Director of Resource Planning San Diego Gas & Electric Western Resource Planners.
Advertisements

Energy Efficiency and Integrated Resource Planning at SMUD APPA Action Plan – EE and Planning May 8, 2008 Jim Tracy, CFO Jim Parks, EECR&D Manager Sacramento.
Key Issues: Plenary Sessions
California GHG policy and implications for the power sector APEX Sydney Conference October 13, 2008 Anjali Sheffrin, PhD.
SMUD Sustainable Energy Supply Progress in Carbon Reduction POU 101: CMUA Briefing of Legislative Staff February 26 th, 2015 Obadiah Bartholomy Powering.
Resource Adequacy in PJM
1.  Purpose  To present Staff’s Preliminary Findings on the 2012 Integrated Resource Plans of:  APS – Arizona Public Service Company  TEP – Tucson.
Modeling Choices & Approaches Key Model Outputs: Carbon emissions Other emissions Electricity prices Total electricity system costs Fuel use and diversity.
Pasadena Water & Power 2009 Integrated Resource Plan Public Meeting #3 December 17, 2008.
Energy Planning and Recent Regulatory Developments Northwest Energy Systems Symposium (NWESS) University of Washington February 22, 2008 Nicolas Garcia.
Plug-In Electric Vehicles… What has to happen on the other side of the outlet? MARC Conf. Session 4 – Electric Cars: Can we charge our way to a carbon-free.
Omar Abdel Samad Ali Alnaggar Victor Armstrong.  While Canada’s National Energy Strategy (NES) is much in line with the BC Clean Energy Act / IRP, Market.
The Potential for Increased Cooperation on Offshore Wind among the Northeast States Warren Leon, Executive Director.
Renewable Energy: Legal and Policy Issues Frank Prager Vice President, Environmental Policy Xcel Energy November 20, 2009 Frank Prager Vice President,
POWER SECTOR POLICY OVERVIEW ASSOCIATION FOR POWER UTILITIES OF AFRICA (APUA) SCIENTIFIC COMMITTEE CONFERENCE Presentation by Mr. M. Mulasikwanda Department.
SAN MATEO COUNTY CCA TECHNICAL STUDY: OVERVIEW Community Choice Energy Advisory Committee June 25 th,2015.
Energy Action Plan “Report Card” and the AB32 “Umbrella” CFEE ROUNDTABLE CONFERENCE ON ENERGY Julie Fitch California Public Utilities Commission Director.
Partnership for Urban South Hampshire Sustainable Growth.
How the State of California Can Play A Greater Role in Addressing Global Warming Leonard Robinson – Chief Deputy Director California Department of Toxic.
Opting for “Long Term Operations” Technical, economic and regulatory considerations MARC Conference June 8, 2010 Sean Bushart, EPRI Sr. Program Manager.
Reaching the Next Level of the State’s Environmental Policy Goals Panel: Energy Procurement, Infrastructure and Policy: Climate Challenges Beyond 2020.
Increasing the Role of Renewable Energy Sources Bill Abolt Chicago District Manager Shaw Environmental & Infrastructure, Inc. May 10, 2007.
Low carbon scenarios for the UK Energy White Paper Peter G Taylor Presented at “Energy, greenhouse gas emissions and climate change scenarios” June.
Long-Term Electricity Report 1 Susan Gray September 27, 2010.
OVERVIEW OF ISSUES DR AND AMI HELP SOLVE Dr. Eric Woychik Executive Consultant, Strategy Integration, LLC APSC Workshop on DR and AMI.
Wind & Transmission: The Clean Energy Superhighway Mark Lauby Manager, Reliability Assessments, NERC.
Icfi.com © 2006 ICF International. All rights reserved. Wyoming Collector and Transmission System Project – Status Report Presented to: Wyoming Infrastructure.
American Public Power Association Pre-Rally Workshop February 28, 2006 Washington, D.C. Climate Change: Making Community-Based Decisions in a Carbon Constrained.
Kevin Hanson Doug Murray Jenell Katheiser Long Term Study Scenarios and Generation Expansion Update April, 2012.
Chelan County PUD PURPA Hearing Fuel diversity Fossil fuel efficiency Chelan County PUD November 19, 2007.
What do we mean by “Energy?
Investing Our Energy In You Traverse City Light & Power Electric Generation TCL&P Study Session December 1, 2009.
ENERGY STAR® WORKSHOP Riffe Center Columbus, Ohio April 26, 2007.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
Power Association of Northern California Maintaining Grid Reliability In An Uncertain Era May 16, 2011 PG&E Conference Center Jim Mcintosh Director, Executive.
Designing Energy Solutions without Borders National Association of Regulatory Utility Commissioners National Association of Regulatory Utility Commissioners.
2015 Mace Advocacy alliance policy conference
Puerto Rico Electric Power
California Public Utilities Commission Why a Load-Based Emissions Cap for California? Julie Fitch CPUC Director of Strategic Planning April 19, 2007 Presentation.
Environmental Benefits of Renewable Portfolio Standards in an Age of Coal Plant Retirements September 10 th, 2015 Energy Policy Research Conference Denver,
Updated 1/28/2011. Renewables Integration Plans and Challenges March 8, 2011 Jay Caspary ·
1 California Energy Commission April 27, 2015 Valerie Winn Chief, State Agency Relations Contingency Planning and Diablo Canyon Power Plant.
Economic Assessment of Implementing the 10/20 Goals and Energy Efficiency Recommendations – Preliminary Results Prepared for : WRAP, AP2 Forum Prepared.
Power Supply Transformation IEPA 2013 Annual Meeting September 27, 2013 January 2013.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
California Energy Commission The California Energy Commission (CEC) Presented to the Assembly Committee on Utilities and Commerce March 5, 2007.
SFPUC IRP Presentation to CEC April 18, INTEGRATED RESOURCE PLANNING SAN FRANCISCO PUC JAMES HENDRY SAN FRANCISCO PUC.
Pasadena Water & Power Integrated Resource Planning “IRP” April 18, 2016 Leesa Nayudu, Resource Planning Manager.
SB350 IRP Overview April 18, 2016 Tanya DeRivi Southern California Public Power Authority Scott Tomashefsky Northern California Power Agency CEC IRP Workshop.
Community Choice Aggregation Demonstration Project Marin County Base Case Feasibility Analyses Overview April 5, 2005.
Regional Transmission Expansion Project Staff Council Briefing Tom Kaiserski (MT) Program Manager February 15, 2011 Governor’s Office of Economic Development.
2016 LTSA Update Doug Murray 6/21/2016. Agenda Introduction Scenario Retirement Process Scenario Summary Results Appendix.
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
RiversidePublicUtilities.com Arts & Innovation RiversidePublicUtilities.com Overview of RPU 2014 Power Supply Integrated Resource Plan RPU Power Resources.
PJM: Managing Grid Evolution Through Markets
Overview of SB 350 California Public Utilities Commission Melicia Charles, Energy Division February 23,
© 2016 Portland General Electric. All rights reserved. I NTEGRATED R ESOURCE P LAN 2016 OPUC Meeting April 21, 2016.
Integrated Resource Plan 2016
City and County of San Francisco Local Agency Formation Commission
Restructuring Roundtable March 24, 2017 Boston, MA
2017 Integrated Resource Plan
The Transition to a High DER Future
Opportunities in the Changing Energy System
Proposed Energy Imbalance Market The Basics
Coal – security of coal supply considerations of EURACOAL
Wind & Transmission: The Clean Energy Superhighway
Byron Woertz, Manager—System Adequacy Planning
Byron Woertz, Manager—System Adequacy Planning
Overview California Customer Choice Action Plan
Overview California Customer Choice Action Plan
Presentation transcript:

Imperial Irrigation District 2016 Integrated Resource Plan: Imperial Irrigation District April 18th, 2016

Integrated Recourse Plan Overview Objectives of the Integrated Resource Plan (IRP) IRP Development Process Key Drivers Status Accurate Load Forecast Adjusting to SB350 Requirements RPS Position

Objectives of the IRP Support IID’s mission as a fiscally responsible public agency to provide reliable, efficient and affordably priced energy service to the communities it serves Integrated Resource Plan Development Legislative & Regulatory Transmission Load Serving Requirements Energy Commodity Trading Local Renewables Development Current and Future Generation Assets

IRP Development Process Each section within the Energy Department works together in a collaborative team effort Key phases of the development process Gather Key Input/Assumptions Identify Strategic Alternatives & Scenarios Simulate and Study Alternatives Present and Review Findings

Key Drivers of IID IRP Maintain System Reliability Provide Competitive Rates Environmental and Regulatory Responsibility Balancing Authority Requirements Maintain System Reliability Env. & Reg. Resp. Balancing Authority Requirements Provide Competitive Rates

Accurate Load Forecast 3,616 GWH in 2017

Adjusting to SB350 Requirements GHG reduction requirements - 40% below 1990 levels by 2030  Exit of coal agreements  Renewable procurement (localized goal)  Meet EE targets  Acquisition of more emission efficient resources; or, the repowering of existing facilities RPS targets – 50% by 2030  Acquisition of cost effective renewable energy  On target to meet 2020 internal goal of 35% and through 2025 (straight line approach)  Sensitivity analysis within load forecast to ensure compliance within range of potential outcomes in load and renewable production 7

Adjusting to SB350 Requirements (Cont.) Vehicle Electrification/TOU rates/EE Study and recommend programs Impacts on Demand/Energy Forecasts Integration of other considerations that are affected by Vehicle Electrification Ensure that an ongoing process is developed to determine best approach 8

RPS Position 9

RPS Diversification 10

Elements of IID’s Base Case (Preferred Plan) 11 BA Requirements TransmissionSystem Upgrades Integration of various activities Interconnection Control Reliability Service CPS 1&2Renewable integrationReg up/downAncillary service Regulatory/Legislation SB350/SBx1-2 AB32 Cap & Trade Emissions reduction Energy efficiency Electric vehicles Program structure Clean Power Plan vs Cap & Trade Competitive Rates Optimal RPS portfolio Optimal emissions reduction portfolio Economic DispatchUnit cyclingNew unitsRetirements

Questions to be Addressed in IRP What is best resource to add?  Are new resources needed?  When do old units need to retire? How will IID meet 50% RPS?  Are compliance mechanisms possible?  Baseload vs Intermittent?  Storage? How does transmission expansion impact supply?  Import opportunities?  Export opportunities?  Economic dispatch for sales opportunities? Load Forecast  Loss of Load Growth?  Severe and Mild Cases?  Impact on RPS? Marketing Power?  Economic dispatch and seasonal requirements?  EIM? Avoid or join or use to our advantage?  Buy/Sell Renewables? New EE programs  Vehicle Electrification?  PV/NEM/DG?  Community Solar? Does RPS meet Cap and Trade requirements beyond 2020?  What are allowances distribution outcomes beyond 2020?  Impact if allowances are not original cost burden based?  Carbon market portfolio? 12