I N T HE N AME OF G OD. T IME T O M ARKET (TTM) W HAT IS TTM ? time to market ( TTM ) is the length of time it takes from a product being conceived until.

Slides:



Advertisements
Similar presentations
Topic 2 :: Business Strategies Mrs. Schroeder
Advertisements

Company Name Sample Template Presenter Name
Project management.
Project L.O.F.T. Report May 2007 through October 2007 Creating a design to meet stakeholder desires and dissolve our current set of interacting problems.
Operations management is concerned with producing the right goods and services at the right quality and quantity. They need to turn the factors of production.
A BPM Framework for KPI-Driven Performance Management
HEALTH PLANNING AND MANAGEMENT
Title Slide – Technology Name Presenter’s Information and Title Title of Industry Contacts and University Contacts (as applicable) **IMPORTANT INSTRUCTIONS:
How to Enhance Personal Productivity By Janet Hadley
Starting an Innovation Process Life of any business is finite. For companies to endure, the drive for efficiency must be combined with excellence in.
Where are you headed? Will you be the first to know when you have “arrived?”
Total Quality in Organizations
Product Design L5- Ch4: Product Specifications Dr. Husam Arman 1.
Lecturer: Sebastian Coope Ashton Building, Room G.18 COMP 201 web-page: Project.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 1 Slide 1 Project management.
Total Quality in Organizations
CPSC 875 John D. McGregor C20 – Technical Debt. Value-based SE SCS – success-critical stakeholder.
Materials Management BUS 3 – 141 Quality and Specification Leveraging Technical Excellence Week of Aug 31, 2010.
1 SOFTWARE PRODUCTION. 2 DEVELOPMENT Product Creation Means: Methods & Heuristics Measure of Success: Quality f(Fitness of Use) MANAGEMENT Efficient &
The Analyst as a Project Manager
Total Quality in Organizations
©Ian Sommerville 2000Software Engineering, 6th edition. Chapter 4 Slide 1 Project management l Organising, planning and scheduling software projects l.
Remedy, a BMC Software company Change Management Maximize Speed and Minimize Risk in the Change Process.
Sales Analysis & Sales & Cost Control. Sales Control Management policies and practices aimed at ensuring that all sales are recorded, made at correct.
© 2005 Prentice Hall14-1 Stumpf and Teague Object-Oriented Systems Analysis and Design with UML.
10 плохих ошибок менеджмента в ИТ бизнесе и что с ними делать д-р Дженнифер Трелевич СТО Google-Россия This presentation does not necessarily reflect the.
Proudly brought to you by YES Dragons’ Den How to Pitch your Business.
Change Management. Why change management  For many change practitioners, there is no doubt that change management must be used on projects that impact.
S/W Project Management
Why Did You Leave Your Last Job? Why do they ask? to understand your motives and gain insight as how you handle your work relationships to ensure you’re.
The leadership piece. What does the leadership concept mean?  Leadership is chiefly about dealing with the intangibles and the most frustrating situations.
Introduction to RUP Spring Sharif Univ. of Tech.2 Outlines What is RUP? RUP Phases –Inception –Elaboration –Construction –Transition.
Chapter 11 Management Skills
Title Slide – Technology Name Presenter’s Information and Title Title of Industry Contacts and University Contacts (as applicable) **IMPORTANT INSTRUCTIONS:
Functions of Management BDP301. Learning Goals  Describe management styles and responsibilities  Compare different types of ownership.
Session 3: pg The teacher will be able to compare and contrast present current homework practices with the Marzano recommendations to create a method.
Supply Chain Management: From Vision to Implementation Chapter 4: New Product Development Process: Managing the Idea Infrastructure.
1 WARFIGHTER SUPPORT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP.
Design Process 중앙대학교 전자전기공학부. Design for Electrical and Computer Engineers 2. Design Process  Engineering : Problem solving through specialized scientific.
1 Chapter 5 Project management. 2 Project management : Is Organizing, planning and scheduling software projects.
Project management Lecture 10. Topics covered Management activities Project planning Project scheduling Risk management.
Yazd University, Electrical and Computer Engineering Department Course Title: Advanced Software Engineering By: Mohammad Ali Zare Chahooki The Project.
©Ian Sommerville 2000Software Engineering, 6th edition. Chapter 4 Slide 1 Project management l Organising, planning and scheduling software projects.
HR Practices For I/T Success. THIS REPORT PRESENTS I/S HUMAN RESOURCE PRACTICE RESEARCH FINDINGS WITH THE FOLLOWING OBJECTIVE Understand HR practices.
©Ian Sommerville 2000 Slide 1 Project management l Organising, planning and scheduling software projects l Objectives To introduce software project management.
Module VI. CUSTOMER SERVICE - WHAT A Tool for Differentiation  Customer Service Is the Fuel That Drives the Logistics Engine  Logistics System Ensures.
Chapter 3 Project Management Chapter 3 Project Management Organising, planning and scheduling software projects.
BPO SOLUTION CONSULTANT AGENCY WELCOME. About Us BPO SOLUTION CA is an emerging company that provides customer-centric BPO services. Our call center services.
Formulating a Simulation Project Proposal Chapter3.
The Nature of Operations. DO NOW Introducing the Topic Page 381 Answer the questions we will discuss shortly.
1 TenStep Project Management Process ™ PM00.9 PM00.9 Project Management Preparation for Success * Manage Quality *
Copyright  2006 McGraw-Hill Australia Pty Ltd PPTs t/a Management Accounting: Information for managing and creating value 4e Slides prepared by Kim Langfield-Smith.
1 Getting Started : Purposes of IS Strategic Planning.
Strategic Plan Development Using KPIs to Develop the Strategic Plan.
Yazd University, Electrical and Computer Engineering Department Course Title: Advanced Software Engineering By: Mohammad Ali Zare Chahooki The Project.
New Product Development Page 1 Teddy Concurrent Engineering by Teddy Sjafrizal.
How To Use Collaborative Goal Setting and Develop a Performance Feedback Process BPI Emerging Leader Series.
Completing Jobs Early ENGINUITY TUTORIAL Copyright Virtual Management Simulations.
Total Quality in Organizations 1. Growth of Modern Quality Management 2 Manufacturing quality Improved product designs Service quality Performance excellence.
The Six Secrets to Going from Employee to Business Owner in 12 Months.
A MESSAGE FROM THE SMALL BUSINESS SECTOR THANK YOU!!
Group 9: Matilda Akkola, Reetta Arokoski, Lauri Kokkila, Miikka Laitila CROWDSOURCING: HOW TO BENEFIT FROM (TOO) MANY GREAT IDEAS? “The article gives recommendations.
Ashima Wadhwa.  Probably the most time-consuming project management activity.  Continuous activity from initial concept through to system delivery.
HOME MEDICAL CARE Deming's 14-Point Philosophy-Quality
QUALITY ASSURANCE AND CONTROL
Fundamentals of Information Systems, Sixth Edition
LEAN PRODUCTION AND QUALITY MANAGEMENT
Project Management Process Groups
Chapter 2 Marketing Plan. Chapter 2 Marketing Plan.
Presentation transcript:

I N T HE N AME OF G OD

T IME T O M ARKET (TTM)

W HAT IS TTM ? time to market ( TTM ) is the length of time it takes from a product being conceived until its being available for sale. (Wikipedia) Length of time taken in product development process from product idea to the finished product. It is a critical component of time based competition.(Business Dictionary)

H OW TO M EASURING TTM ? There are no standards for measuring TTM, and measured values can vary greatly. First, there is great variation in how different organizations define the start of the period. Examples : automotive industry starts from concepts, a researching project starts from a subject and..

W HY TTM IS IMPORTANT ? First product, build the standards. Time is money ! Allows to company to be a leader instead of being follower. Deny overhead. Important for company popularity in marketing. Longer market time cycle.

W HAT IS THE EXACT PROBLEM WITH TTM ? If the TTM doesn’t speed up enough, it may caused money problems and every thing affect by this.

W HAT ARE TTM FACTORS ? Clear understanding of customer needs at the start of the project and stability in product requirements or specifications; A characterized, optimized product development process; A realistic project plan based on this process; Availability of needed resources to support the project and use of full- time, dedicated personnel; Early involvement and rapid staffing build-up to support the parallel design of product and process; Virtual product development including digital assembly modeling and early analysis and simulation to minimize time consuming physical mock-ups and testing; and Design re-use and standardization to minimize the design content of a project.

H OW TO SOLVE TTM PROBLEM ? 1. Eliminate Waste Unproductive meetings, inefficient processes, and poor communication are some common issues that slow down projects. When time wasting issues exist, implement a system for measuring the amount of time wasted. Define categories of inefficient activity such as "unproductive meeting time," or "design changes due to poor planning." Get consensus about the activities that waste time, then monitor the percentage of time in those wasteful activities compared to total work time. If the percentage is high, it should point out specific corrective actions. Without this data, it can be difficult to understand the magnitude of a particular problem.

2. Speed vs. Efficiency Trade-off Three general modes describe an organization's speed and efficiency: Mode 1 is slow and inefficient (with varying degrees of slowness and inefficiency); Mode 2 is moderately fast and highly efficient; Mode 3 is very fast and inefficient. Only Mode 1 isn't good. Managers must understand that to achieve warp speed, you have to pay the price and give up some fiscal efficiency. Most project teams are in Mode 1 striving to reach Mode 2, so in this case improving both speed and efficiency is a reasonable expectation. At a certain point (Mode 3), boosting resources significantly will provide very little time-to-market (TTM) gain. For example, doubling a development team size from three to six people might get a product out the door in nine months instead of 18. Reducing TTM by even just another two months, however, might require doubling the staff again from six to 12. You must be prepared to pay the price to achieve the most aggressive TTM goals.

3. Invest in Project Planning Projects of significant size need at least two levels of planning to ensure they're executed effectively and efficiently. One level of planning should encompass the entire project scope and include all functional areas involved. Detailed planning at the functional level? especially the engineering function ? is often taken too lightly. Ideally, each project should have an engineering team leader who excels at project planning, has enough time allocated for planning, and has a good rapport with managers and key team members. If any of these attributes are missing, TTM will likely be impacted, so it's worth investing in strong technical leaders.

4. Foster Collaboration and Commitment Is your team environment more collaborative or competitive? When employees are competing fiercely with each other for raises, promotions, or simply to keep their jobs, collaboration is probably weak. If commitment from individuals is lacking, it will certainly slow down a team as well. The most effective way to build commitment is to give people a sense of purpose. Find out the aspects of work that motivate individuals and align work appropriately with interests. Communicate business objectives in a way that helps people see how the objectives overlap with their personal values.

5. Assess the Cost of Delay How much does it cost your organization for each day a project is late? There are three major delay costs to consider: 1) estimated revenue lost for each day of delay; 2) cost to employ the project team for each day of delay; and 3) cost of lost opportunities during the delay period because resources aren't available for new projects. Highly visible cost of delay metrics can be used to improve team performance. No team wants major delay costs associated with their project to be visible, but be careful with this type of measurement. You don't want circumstances outside of a team's control to damage their credibility.

For sure there are more solutions like hiring more or automated and … but in my idea the most reliable things was the 5 points that I mentioned.

R EFERENCES Dr.Ejlali digital system design slides

T HE E ND