Onsite Report Itaru Nakagawa RIKEN/RBRC. Schedule.

Slides:



Advertisements
Similar presentations
Hardware Integration of the Prototype Wes Grammer NRAO September 24-26, 2012EOVSA Prototype Review1.
Advertisements

Post Run13 MuTR/MuTrig Maintenance 1. Cathode Cable in mis-contact : South Station-1 Oct-5, Gap-2 2.
MuTRG for Run12 RIKEN/RBRC Itaru Nakagawa 1. Run12 Schedule 14 Cryoweeks -> Mid Jan. ~ End of April GeV pp (2+3 weeks) GeV pp (1+6 weeks)?
MuTr/MuTrig Performance of Run13 RIKEN/RBRC Itaru Nakagawa 1.
South Arm FEE Performance Prior to Au run, all FEMs installed and working. Currently, 157 of 168 FEMs read out useful data. = 93.5% operational FEM losses:
Technical Support /7/08 PHENIX WEEKLY PLANNING 8/7/2008 Don Lynch.
Run10 Preparation Status and Issues Itaru Nakagawa RIKEN/RBRC.
Technical Support /18/08 PHENIX WEEKLY PLANNING 12/18/2008 Don Lynch.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
P. 1Mario Deile – TOTEMino: Infrastructure Status and Schedule Mario Deile Zone 2.Gas system 3.Cabling 4.Cooling water 5.Counting-Room 6.Safety.
1 10/22/2009 PHENIX WEEKLY PLANNING 10/22/2009 Don Lynch.
1 9/3/2009 PHENIX WEEKLY PLANNING 9/3/2009 Don Lynch.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
Run11 MuTrig-FEE Summary RIKEN/RBRC Itaru Nakagawa 1.
Technical Support /5/08 PHENIX WEEKLY PLANNING 6/5/2008 Don Lynch.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
PHENIX WEEKLY PLANNING 2/21/2008 Don Lynch. 2/21/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Technical Support /26/08 PHENIX WEEKLY PLANNING 10/2/2008 Don Lynch.
1/5/20121 PHENIX WEEKLY PLANNING 1/5/2012 Don Lynch.
MuTR/MuTrig Readiness for Run13 Itaru Nakagawa on Behalf of MuTrig/MuTr Group 1.
8/9/20121 PHENIX WEEKLY PLANNING 8/9/2012 Don Lynch.
PHENIX WEEKLY PLANNING 10/05/06 Don Lynch. 10/05/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
10/11/20121 PHENIX WEEKLY PLANNING 10/11/12 Don Lynch.
3/29/20121 PHENIX WEEKLY PLANNING 3/29/2012 Don Lynch.
PHENIX WEEKLY PLANNING 4/10/2008 Don Lynch. 04/10/08 Shutdown ’08 Schedule Purge Flammable Gas, Magnet & DAQ TestsDone Remove lock-out & open shield wallDone.
STATUS OF HO Sudhakar Katta TIFR, Mumbai India-CMS meeting, Delhi 27 th Sept 2007.
1 MuTRG-FEE Upgrade Status RIKEN/RBRC Itaru Nakagawa.
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
Technical Support /4/08 PHENIX WEEKLY PLANNING 9/4/2008 Don Lynch.
MuTr Shutdown Work Rusty Towell for And JUNE 22, 2004 at the Muon Physics and Forward Upgrades Workshop.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
PS VFE & PS/SPD FE Electronics Status and Plans 21 November 2007 LPC Clermont.
Introduction to High Momentum Trigger in PHENIX Muon Arms RIKEN/RBRC Itaru Nakagawa 中川格 1.
10/13/20111 PHENIX WEEKLY PLANNING 10/13/2011 Don Lynch.
PHENIX WEEKLY PLANNING 3/6/2008 Don Lynch. 3/6/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Technical Support /21/08 PHENIX WEEKLY PLANNING 8/21/2008 Don Lynch.
M. Brooks DC Meeting, 15-Sep-00 MuTr Mechanics Status SOUTH ARM: Chambers fabrication complete Stations 2+3 installed Station 1 test-installed will be.
1 South Arm Installation Plan Itaru Nakagawa RIKEN/RBRC.
Technical Support /14/08 PHENIX WEEKLY PLANNING 8/14/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/27/2008 Don Lynch. 3/27/2008 Weekly Planning Meeting2 Shutdown ’08 Schedule CM Crane ReviewMar Purge Flammable Gas, Magnet.
10/18/20121 PHENIX WEEKLY PLANNING 10/18/12 Don Lynch.
1 10/22/2009 PHENIX WEEKLY PLANNING 10/29/2009 Don Lynch.
PHENIX WEEKLY PLANNING 2/2/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
PHENIX WEEKLY PLANNING 2/9/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
1 Onsite Status Itaru Nakagawa RIKEN/RBRC. 2 Schedule.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
1/26/20121 PHENIX WEEKLY PLANNING 1/26/2012 Don Lynch.
Technical Support /5/08 PHENIX WEEKLY PLANNING 12/5/2008 Don Lynch.
11/10/20111 PHENIX WEEKLY PLANNING 11/10/2011 Don Lynch.
Technical Support /28/08 PHENIX WEEKLY PLANNING 8/28/2008 Don Lynch.
1 8/27/2009 PHENIX WEEKLY PLANNING 8/27/2009 Don Lynch.
PHENIX WEEKLY PLANNING 3/02/06 Don Lynch. BLM Test.
PHENIX WEEKLY PLANNING 1/24/2008 Don Lynch. 1/17/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going Switch.
PHENIX WEEKLY PLANNING 6/28/2007 Don Lynch. 6/14/2007 Weekly Planning Meeting 2007 Summer Shutdown Schedule ItemStartComplete RPC Factory set up5/ ?
12/19/ PHENIX WEEKLY PLANNING Dec. 19, 2013 Don Lynch.
MuTRG Channel map summary June 30, 2008 Tsutomu Mibe KEK 1.
10/20/20111 PHENIX WEEKLY PLANNING 10/20/2011 Don Lynch.
Recap Clamp Installation RIKEN/RBRC Itaru Nakagawa 1.
PHENIX WEEKLY PLANNING 1/31/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going Switch.
MuTrig-FEE Install Status RIKEN/RBRC Itaru Nakagawa 1.
1 11/19/2009 PHENIX WEEKLY PLANNING 11/19/2009 Don Lynch.
Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.
1 Installation Status Remaining Issues RIKEN/RBRC Itaru Nakagawa.
Technical Support /22/08 PHENIX WEEKLY PLANNING 5/22/2008 Don Lynch.
Study of polarized sea quark distributions in polarized pp collisions at sqrt(s)=500GeV with PHENIX Oct. 10, 2008 Tsutomu Mibe (KEK) for the PHENIX collaboration.
1 11/25/2010 PHENIX WEEKLY PLANNING 11/25/2010 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 2/14/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Onsite Work Summary RIKEN/RBRC Itaru NAKAGAWA. Completed Re-capacitation St-1, Gap-1 N&S Completed St-2 Terminators Install to South Oct.5 (except for.
Preparation for Run10 RIKEN/RBRC Itaru Nakagawa. TLD badges (to be replaced every two weeks) Location of dosimeters in MuTr.S St.1 TK361 TK362 TK363 TK364.
RPC FEE The discriminator boards TDC boards Cost schedule.
Presentation transcript:

Onsite Report Itaru Nakagawa RIKEN/RBRC

Schedule

Cabling Install Tray after MMS to Run Position State of art Work by Yoshi

Trunk Cable Connection Competed trunk cable connection to patch bay 4 connectors were chopped off. need to repair.  updated on table

LV connection Frank has started connection LV cables to terminal blocks Projected day to complete is Friday.

Completed Mounting Chassis and Re-cabling work for Octant 6 & 8. Octant-7 Chassis will be mounted next week Station-1 Chassis Mount Oct-6 Oct-8

Station-1 Pluming completed Cooling water pipes

Noise data taking No data taking during last Thursday ~ Monday. Air conditioner trouble in IR Shut off all Rack Power Rack power off

Constraints Two C-link/G-link cards in South arm broke (was working early last week) South Air conditioner hasn’t been working yet. Need to pay attention on IR Humidity/ temperature to operate FEMs.

New 5 Thermocouples in MMN Piston St.3 Piston St.1

New ThermoCouples in MMN

John. H Log Temperatures in database Ready for OASys data taking for temperature correlation study

Other Constraints Dismount –Pad chamber –HBD Hadron Brind Detector (HBD)

Plan for next week PatchBay North  More or less done for infrastructure setup Finish Cabling (Friday) Daily calibration and analysis Optical –Tray install for trunk cable loop. –Patch bay install at platform. –Trunk cable connection. –Fiber connections. –PatchBay(rackroom) - PatchBay (Platform) - Chassis Chain test LV –Megapack Install (Frank) –Connection to Terminal Block (Frank)  end of this week –LV measurement & tune Chassis –Station-1, Oct-7 Mount (Jimmy) –Finish grounding St-2&St-3 –Plumming (John+Mike)

North Arm Hubert’s platform was disassembled because it is most likely not helpful to access chassis. (designed to access rather center region) Noise Hunt North Station-3, Octant-1 can be done when we have time to work.

Install Schedule (ADTX & Rack Room) 1 octant/day/expert. 1 station/week/2experts

Travel Schedule

4th Week September OASys camera alignment Miscabling Check South camera 24, 26 Develop noise chart program Develop Cathode cable miscabling checker OASys temperature measurement and correlation North arm Station-3, Octant-1 noise hunt FCI connector debugger (soldering?) Rack room –Setup MRG and cabling –Run LL1 Cable –Run DCMIF-DCM cable