Wanapum Dam Total Dissolved Gas Characterization Evaluation of the Wanapum Dam Fish Bypass (WFB) 2008.

Slides:



Advertisements
Similar presentations
The effects of summer flow augmentation on the migratory behavior and survival of juvenile Snake River fall Chinook salmon Project
Advertisements

Flood Profile Modeling with Split Flows and Weirs
Upstream and Downstream Passage of American Eels at the Medway Project, Penobscot River, Maine Scott Hall ————————————— PPL Maine, LLC Milford, Maine Steve.
Application of the Continuous Slope-Area Method for Determining Stream Discharge and Development of Rating Curves in Ephemeral Channels Navajo Nation Hydroclimate.
Passage Behavior and Survival for Radio-tagged Subyearling Chinook Salmon at Ice Harbor Dam, 2006 Fish Ecology Division Northwest Fisheries Science Center.
Glen Canyon Dam Adaptive Management Program WY 2000 Low Steady Summer Flow Randy Peterson, BOR Barry D. Gold, GCMRC A Test of Concept.
Lower Yellowstone River Diversion Dam Project – Phase II - Physical Modeling of the Rock Ramp BRT, COE, MTAO Update Meeting November 4, 2010.
John H. Kerr Dam and Reservoir John H. Kerr Dam and Reservoir U.S. Army Corps of Engineers Wilmington District.
1 LOWER COLUMBIA RIVER SURVIVAL STUDY, 2010: Passage Behavior and Survival at Bonneville Dam Ploskey, Faber, Batten, Weiland, Hughes, Deng, Fu, Martinez,
River Studies. Outline of Events During your river field work you will be visiting two different sites in the lower course of the river. At each site.
CHARACTERISTICS OF RUNOFF
US Army Corps of Engineers BUILDING STRONG ® Weather, Runoff, and Water Quality Summary Water Year 2010 Steven B. Barton, P.E. Chief, Reservoir Control.
Design of Open Channels and Culverts CE453 Lecture 26
Figure 1. Photograph looking upstream at the south fish ladder and training spill from bay 18, Bonneville Dam, April 4, Spill bay 18 South fish ladder.
Design of Open Channels and Culverts
Screen and Bypass Design Bryan Nordlund, P.E. National Marine Fisheries Service Lacey, Washington Note: this presentation represents the views of the presenter,
Placer County Water Agency Middle Fork American River Project (FERC No. 2079) Recreation Technical Working Group Meeting July 21, 2008.
Temperature and Flow Dynamics of the Klamath River Technical Memorandum 7 Leon Basdekas Mike Deas Watercourse Engineering, Inc nd Street, Suite B.
Snake River below Swan Falls (Ramp gage) Snake River near Murphy Carl Rundberg Pete Vidmar.
31 DECEMBER VARIABLE FLOOD CONTROL DRAFT FOR LIBBY RESERVOIR U.S. Army Corps of Engineers Northwestern Division, North Pacific Region.
Overview of the draft Pend Oreille River Total Dissolved Gas Total Maximum Daily Load Paul J. Pickett, P.E. Transboundary Gas Group Castlegar, BC October.
Large Wood Treatment on Habitats and Fish Populations of Green River and Crab Creek Bio-Surveys, LLC 2007 Presented by Esteban Quiles.
U.S. Army Corps of Engineers TMT Annual Review Weather and Water Summary Presented by Karl Kanbergs USACE, Water Management Division December 7, 2011.
Abstract Background Conclusion Stream Bed Morphology and Discharge Rates of Deckers Creek Data was collected at 5 different points along a 100 meter transect.
Stagnation Properties P M V Subbarao Professor Mechanical Engineering Department I I T Delhi Capacity of A Resource…..
Confidential – ENSR Update on Total Dissolved Gas Mitigation Measures for Boundary Dam by Kim Pate P.E. and Keith Moen P.E.
Interim Update: Preliminary Analyses of Excursions in the A.R.M. Loxahatchee National Wildlife Refuge August 18, 2009 Prepared by SFWMD and FDEP as part.
1 Mainstem Passage Strategies In The Columbia River System: Transportation, Spill and Flow Augmentation Presented By: Albert Giorgi, Ph.D.
Engineering Low-Head Dams for Function and Safety Fritz R. Fiedler Department of Civil Engineering University of Idaho.
Middle Fork Project Flow and Temperature Modeling (Status Report) November 4, 2008.
SPILLWAY RATINGS and STABILITY DESIGN PROCEDURES __________________________ SITES 2005 INTEGRATED DEVELOPMENT ENVIRONMENT for WATER RESOURCE SITE ANALYSIS.
U.S. Department of the Interior U.S. Geological Survey Modeling sand transport and sandbar evolution along the Colorado River below Glen Canyon Dam.
BUILDING STRONG ® PORTLAND DISTRICT 1. BUILDING STRONG ® PORTLAND DISTRICT 2 BiOp Performance Standards for Dam Passage Survival RPA RM&E Actions - Strategy.
Why is resource assessment important? It wont work without the resource! (Lawn ornament) It will not provide a return on investment without working! You.
The Louis Berger Group, Inc. A Transboundary Approach to Mitigating Total Dissolved Gas in the Columbia River Basin Mark W. Killgore, P.E.
Focus Group Meeting: September 27, 2013 Truckee River Water Quality Standards Review.
Status of Columbia River salmon and links to flow: What we do and do not know Presentation to Northwest Power Planning Council December 11, 2002
Howard Schaller PSMFC Annual Meeting September 24, 2013 Comparative Survival Study Outcomes – Experimental Spill Management 1.
CSS Oversight Committee ISAB November 15, 2013 Comparative Survival Study Outcomes – Experimental Spill Management 1.
Libby Dam June 2006 Spill: Total Dissolved Gas Monitoring.
2005 Preliminary Summer Spill Data Fall Chinook Radiotelemetry Studies Performed by USGS – BRD, NOAA – NWFSC For the USACE Anadromous Fish Evaluation Program.
Findings of Congress The Endangered Species Act is the last resort for species at risk of extinction. Under the ESA, the National Marine Fisheries Service.
2005 Subyearling Migration Fish Passage Center. Overview – summer migration Court ordered summer spill occurred from June 20 to August 31, 2005 Question.
Focus Group Meeting: November 12, 2013 Truckee River Water Quality Standards Review.
Northwest Power Planning Council Fish and Energy Impacts Resulting from Reductions in Summer Bypass Spill July 16, 2003.
Basic Hydrology & Hydraulics: DES 601 Module 16 Open Channel Flow - II.
Hydraulic and Biological Evaluations. Hydraulic Evaluations  Measuring flow distribution for fixed vertical or rotating drums (with adjustments available).
Optimizing Riparian Buffers for Thermal Protection TerrainWorks (
Middle Fork Project AQ 3 – Macroinvertebrate and Aquatic Mollusk Technical Study Report Overview May 5, 2008.
Historical Review Fish Migration Data. Two Management Approaches Spill for Fish Passage Planning dates Percent passage dates.
Basic Hydraulics: Rating curve. Definition & terminology Rating curve, also known as stage–discharge curve, is a graph showing the relation between the.
Measures of Central Tendency, Dispersion, IQR and Standard Deviation How do we describe data using statistical measures? M2 Unit 4: Day 1.
Relationships Between River Variables and Salmon Survival Correlation Analysis and Box and Whisker Plots.
Basic Hydraulics: Open Channel Flow – II
Sanitary Engineering Lecture 4
Fish Loss at Unit 1 McNary July 2016 July On July 25, the tailwater logs were installed at unit 1 for unit dewatering and 9 year overhaul. No salmon.
Spill and GBT Meeting with Oregon DEQ December 2006.
Anthony Alvarado, PE, CFM National Hydraulic Engineering Conference
EXAMPLE Water flows uniformly in a 2m wide rectangular channel at a depth of 45cm. The channel slope is and n= Find the flow rate in cumecs.
Northwest Fisheries Science Center Technical Management Team
Evaluation of Adult Steelhead Downstream Passage Through the Sluiceway and Turbines at The Dalles Dam During Fall 2009, Winter 2009/2010, and Spring.
Lower Granite and Little Goose
Lotic vs. Lentic Systems
Northwest Fisheries Science Center Technical Management Team
Roza Dam Evaluation Post Modifications
Chapter 5 Preview Section 1 Measuring Motion
Study Update Tailrace Slough Use by Anadromous Salmonids
McNary Juvenile Fish Emergency Bypass System
2017 Flow, Debris, spill and TDG
GRADIENT.
Presentation transcript:

Wanapum Dam Total Dissolved Gas Characterization Evaluation of the Wanapum Dam Fish Bypass (WFB) 2008

Outline Wanapum Dam Fish Bypass Regulatory Requirements TDG Evaluation –Objectives –Methods –Results Conclusions

Wanapum Dam Spillway Future UnitsPowerhouse Fish Bypass

WFB - Objectives Biological Opinion Requirements 95% Juvenile Salmon Survival Reduce Spill Reduce Total Dissolved Gas

WFB - Features Nominal full bypass flow of 20,000 cfs Vertical and inclined gates to set lower flow rates (15 kcfs, 10 kcfs, 5 kcfs and Sluice) Finished opening through concrete is 18.5 feet wide Length of 290 feet upstream/downstream Exit chute width of 90 feet Discharge flow spread and elevated to minimize total dissolved gas (TDG) and tailrace scour

WFB – Upstream View Bypass Entrance

WFB – Upstream View Bypass Entrance

WFB – Downstream View Bypass Entrance

WFB – Downstream View

WFB TDG Field Study: Objectives The primary objective of the study is to quantify the TDG associated with the WFB operation under varying flow and tailwater conditions A secondary objective of the study is to compare resulting TDG pressures at the tailwater transect (2000 ft downstream) to those measured at the tailwater fixed monitor location at Beverly Bridge (17000 ft) downstream

WFB TDG Field Study: Summary Study Duration: July 26 – Aug. 24, 2008 (29 days) WFB Flows: 19 – 20 kcfs Powerhouse Flows: 0 – 140 kcfs. Forebay elevations: – ft msl Tailwater elevations: – ft msl Spillway (Tainter-gate) operation occurred for a few hours on August 9th then again at the end of the study on August 22nd, 23rd, and 24th. (Retrospective Review of entire spill season using just tailwater monitor data during WFB operation)

Location of WANF, Transect T1, and WANT Area Map for Wanapum Dam and Tailrace TDG Array Transect T1 WANF Powerhouse WFB Spillway T1P6 T1P5 T1P4 T1P1 T1P2 T1P3 Beverly Bridge Flow WANTW

Wanapum Dam operations July 26 through August 24, 2008 Involuntary spill event

Wanapum Dam Forebay and Tailwater Elevation July 26 through August 24, 2008

Wanapum Dam Forebay, Tailwater, and Priest Rapids Forebay Fixed Monitor TDG Involuntary spill event

WFB TDG Field Study: Objectives The primary objective of the study is to quantify the TDG associated with the WFB operation under varying flow and tailwater conditions

Targeted Operating Conditions Four targeted operating conditions in order to isolate TDG exchange under varying tailwater conditions: –no flow (3 events at 0-10 kcfs) –60 kcfs (6 events at kcfs) – kcfs (11 events) –and greater than 140 kcfs (5 events at kcfs) Each targeted operating condition was to be held steady long enough to allow conditions to stabilize in the tailrace. Numerous times with constant conditions occurred for 2 hours or greater incidentally. 53 periods were identified meeting the operating requirements of a test –44 occurred during the test operation of the WFB and 22 of these were at least a 3 to 4 hour period. –25 targeted flows and 19 incidental test flows –9 tests were identified during the period following the shutdown or minimum operation of the WFB, 6 of these lasted for a minimum of 3 hours

Determination of TDG by Test and for Each Station Average conditions were determined for each test identified Average forebay TDG and operations were calculated from the beginning to end of each test Average TDG for a test was determined from data representing near steady state conditions based on a time lag for a station or distance downstream A time lag was determined using visual observations of data time histories and average velocities and travel times as determined from numerical model results The time lag for stations on T1 was 2 hours after initiation of a test and then continued for 30 minutes beyond the end of steady operating conditions The time lag for the tailwater fixed monitor station was set at 2.5 hours following test start and continued until 1 hour following the test end Resulted in 3 to 18 data points for use in calculating the test statistics

TDG Time Histories for Tests 1-4,7/26-7/28

Average TDG for Test Periods

TDG vs. Total Project Discharge

Tailwater Elevation vs TDG

WFB TDG Field Study: Objectives A secondary objective of the study is to compare resulting TDG pressures at the tailwater transect (2000 ft downstream) to those measured at the tailwater fixed monitor location at Beverly Bridge (17000 ft) downstream

WANTW TDG vs T1 TDG

T1 TDG (lagged 1 hr) and WANTW TDG

T1 TDG (lagged 1 hr) vs. WANTW TDG for period of WFB Operation

WANTW TDG vs. Powerhouse Discharge -Entire Spill Season-

Delta TDG (WANTW) vs. Forebay TDG -Entire Spill Season-

12 hr running average TDG for T1, WANTW, PRFB

WFB TDG Field Study: Observations Primary study objective - quantify the TDG associated with the WFB channel chute operation –Resulting TDG in downstream reach varied from 111 % up to 116 % saturation for the field test periods when the WFB was in operation at kcfs and the powerhouse was discharging between 0 and 140 kcfs total. The mean TDG over all tests was % (sd=1.3) –Retrospective data analysis for the 2008 spill season peaked at 118% TDG for periods of WFB operation –Running 12-hr averages were less than 116% for WFB operation –Downstream TDG decreased with increasing powerhouse discharge, ~3 % over the range of discharge with similar results from comparison with tailwater elevation –The Wanapum tailwater and Priest Rapids forebay TDG standards were met during entire operation of WFB in 2008 (AND during 2009) –Minimal vertical or lateral gradients were observed in TDG or temperature at T1. TDG was generally uniform across transect T1 during the study with a modest 1% lateral gradient. This gradient varied depending on the amount of powerhouse operation.

WFB TDG Field Study: Observations Secondary study objective - compare resulting TDG pressures at the tailwater transect (2000 ft downstream) to those measured at the tailwater fixed monitor location at Beverly Bridge (17000 ft) downstream –Very little change resulted in TDG from the Transect T1 down to the fixed monitor location at Beverly Bridge. Tailwater monitor vs T1 TDG relationship was essentially 1 to 1 with an R 2 of Mean difference was 0.2 % (sd=0.4) generally fell within the T1 lateral gradient range indicating only a minor longitudinal gradient downstream of the 2000 ft reach.

WFB TDG Field Study: Conclusions Objective 1: Based on the summer Field Study coupled with the Retrospective analysis of 2008 operations of the WFB between 15 and 21 kcfs the peak downstream TDG will remain below 118% saturation. This applies to the full range of project turbine operations as well as a full range of forebay TDG levels. Objective 2: The existing tailwater TDG monitor at Beverly Bridge 3.2 miles below Wanapum Dam is minimally different, 0.2%, from the average TDG measures taken at 2000 ft below the dam during the WFB operation.

Questions?