1 CEOS WGISS project: GEOSS Reference Model for the Use of Satellite Data in Disaster Management and Risk Assessment John Evans - GST, Inc. Karen Moe -

Slides:



Advertisements
Similar presentations
Air Quality and Health Scenario Stefan Falke, Rudy Husar, Frank Lindsay, David McCabe.
Advertisements

© GEO Secretariat Agenda Item 3. GEO UPDATE. © GEO Secretariat Membership 67 members and 43 Participating Organisations – New Members:Latvia, Moldova,
DS-01 Disaster Risk Reduction and Early Warning Definition
Slide: 1 Guy Seguin (CSA) CEOS Disaster SBA Team Coordinator Priority Actions GEO Disaster WP
Remote Sensing at the service of Natural Disasters Warning: the Contribution of the Supersites Concept Professor Stuart Marsh Co-Chair GEO Institutions.
G.W ICT for risk management FP6 Strategic Objective ICT for Environment Information Society & Media DG European Commission, Brussels Guy Weets Deputy.
Multidisciplinary interoperability To build Operating Capacity Initial (IOC): extend current GEO IP3/AIP-2 interoperability systems in Forest, Biodiversity,
The EUGENE project and its contributions to the GEO Ministerial 4th GEO European Projects Workshop 29/30 April 2010.
A Roadmap for the GHCP The GeoHazards Community of Practice (GHCP) Presentation developed during the First GHCP Workshop, Paris, January 18-21, 2010.
ESIP Air Quality Workgroup and the GEO Air Quality Community of Practice collaboratively building an air quality community network for finding, accessing,
The role of the GEO Geohazards Community of Practice for the Supersites Initiative The role of the GEO Geohazards Community of Practice for the Supersites.
V. Chandrasekar (CSU), Mike Daniels (NCAR), Sara Graves (UAH), Branko Kerkez (Michigan), Frank Vernon (USCD) Integrating Real-time Data into the EarthCube.
A Global Agriculture Drought Monitoring and Forecasting System (GADMFS) Meixia Deng and Liping Di.
Emergency Management Information System - EMIS
CEOS Response to the GEO Disasters Task Guy Seguin CSA CEOS SIT-28 Meeting Hampton, Virginia, USA Date.
An Information Architect's View of Earth Observations for Disaster Risk Management NH11B-3708 We focus on the need to develop actionable information products.
1. IASC Operational Guidance on Coordinated Assessments (session 05) Information in Disasters Workshop Tanoa Plaza Hotel, Suva, Fiji June
IGOS Geohazards: Status and perspectives 3rd International Geohazards Workshop Frascati, ESRIN, 6th November 2007 Hormoz Modaressi Director IGOS Geohazards.
Coordination and Net Working on DRR Rapid Emergency Assessment and Coordination Team (REACT) Bishkek November, 2009.
Space Technology for Emergency Response and Risk Reduction European Conference - GEO Welcomes FP7 Constanta, Romania 15 September 2006 United Nations platform.
© GEO Secretariat GEO Work Plan 2nd GEOSS Science and Technology Stakeholder Workshop "GEOSS: Supporting Science for the Millennium Development.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
Slide: 1 Osamu Ochiai Water SBA Coordinator The GEO Water Strategy Report – The CEOS Contribution Presentation to the 26 th CEOS Plenary at Bengaluru,
AIP-2 Kickoff Workshop End-to-end use case: Discovery, access, and use with variations Doug Nebert GEOSS AIP-2 Kickoff September 2008.
Alan Edwards, 2012 Approach to Cyberinfrastructure (and many other things)
ESIP Federation Air Quality Cluster Partner Agencies.
GEOSS AIP-5 Architecture Implementation Pilot, Phase 5 - Disasters Management Session- Hervé Caumont - Session Lead - OGC IP Team AIP-5 Kick-off Meeting,
GEO Work Plan Symposium 2012 ID-03: Science and Technology in GEOSS ID-03-C1: Engaging the Science and Technology (S&T) Community in GEOSS Implementation.
Architecture Implementation Pilot-5 Disasters Management WG Encourage mature systems to interoperate with the GEOSS Common Infrastructure Hervé Caumont,
The Use of the Targets by the Institutions & Development Implementation Board in Monitoring the Work Plan Implementation 2nd GEOSS Science and Technology.
GA.4.Disasters Discussion of “Expected Outcomes” Karen Moe/NASA Earth Science Technology Office Presented at CEOS-WGISS-32 Budapest, Hungary September.
FEA DRM Management Strategy Presented by : Mary McCaffery, US EPA.
Synthesis of Strategic Issues (Climate, Disasters, Water) and a draft European strategic framework.
What is GEO? launched in response to calls for action by the 2002 World Summit on Sustainable Development, Earth Observation Summits, and by the G8 (Group.
Draft GEO Framework, Chapter 6 “Architecture” Architecture Subgroup / Group on Earth Observations Presented by Ivan DeLoatch (US) Subgroup Co-Chair Earth.
Flash Flood Forecasting as an Element of Multi-Hazard Warning Systems Wolfgang E. Grabs Chief, Water Resources Division WMO.
EPA Geospatial Segment United States Environmental Protection Agency Office of Environmental Information Enterprise Architecture Program Segment Architecture.
WGISS Technology Subgroup Report WGISS-29 Bonn, 2010 Nataliia Kussul WGISS.
Recommendations from the GEO TASK AG Community of Practice Image: NASA, ASTER Science Team Minnesota Kansas Germany Bolivia Thailand Brazil.
SDCG-6 Oslo, Norway October 22-24, 2014 SDCG 3-Year Work Plan Stephen Ward, SDCG EXEC (Australia) SDCG-6: Oslo,
ADC Meeting # 2, Seattle, July 2006 Slide # 1 Overview of ADC activities (Committee) Ivan Petiteville, CEOS Meeting # 2, Seattle, July 20-21, 2006.
Architecture Implementation Pilot-5 Disasters Management WG Encourage mature systems to interoperate with the GEOSS Common Infrastructure Hervé Caumont,
CEOS Priorities for 2013 Agenda 3 Kerry Ann Sawyer CEOS Executive Officer CEOS SIT-28 Meeting Hampton, Virginia, USA 12 March 2013.
® GEOSS AIP 5 Water SBA Update HDWG June 2012 Matt Austin NOAA Stefan Fuest KISTERS Jochen Schmidt NIWA.
GEOSS Architecture for the Use of Satellites for Disaster Management and Risk Assessment Karen Moe/NASA Earth Science Technology Office Presented at CEOS-WGISS-32.
WGISS and GEO Activities Kathy Fontaine NASA March 13, 2007 eGY Boulder, CO.
ATT Contribution to GEO Archive Task Team WGISS – 22 Sep 11 – 15, 2006 Annapolis, USA.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
WMO Moving from the WIGOS Framework towards the Pre-operational Phase A. Makarau President of RA I.
Report of the Architecture and Data Committee (ADC) R.Shibasaki (ADC, Japan)
Role of Technical Agencies Responsible for Hazard Assessment, Monitoring, Observations, Data and Analysis Dr. David Green National Oceanic and Atmospheric.
DA Task Report Report by Rick Lawford and Toshio Koike ADC Meeting September 2008 Boulder.
Responsive Innovation for Disaster Mitigation Gordon A. Gow University of Alberta.
Implementing GEOSS architecture with-and-for Users George Percivall Open Geospatial Consortium Task lead AR-09-01B.
Page 1 CSISS Center for Spatial Information Science and Systems 09/12/2006 Center for Spatial Information Science and Systems (CSISS) George Mason University.
Land Surface Imaging VC: Terms of Reference Julio Dalge, P.G. Diwakar, John Faundeen INPE ISRO USGS CEOS SIT-28 Meeting Hampton, Virginia, USA March 12,
ISWG / SIF / GEOSS OOSSIW - November, 2008 GEOSS “Interoperability” Steven F. Browdy (ISWG, SIF, SCC)
Strengthening Disaster Management using Earth Observations – GEOSS and CEOS Activities – George Percivall, Nadine Alameh; OGC John Evans, GST Karen Moe,
Cyberinfrastructure Overview of Demos Townsville, AU 28 – 31 March 2006 CREON/GLEON.
ISWG / SIF / GEOSS OOS - August, 2008 GEOSS Interoperability Steven F. Browdy (ISWG, SIF, SCC)
QA4EO in 10 Minutes! A presentation to the 10 th GHRSST Science Team Meeting.
OGC’s role in GEO: Results from the Architectural Implementation Pilot (AIP) George Percivall Open Geospatial Consortium GEO Task IN-05 Coordinator
Global Science & Technology, Inc. (GST) Greenbelt, Maryland
GEO WP 1. INFRASTRUCTURE (Architecture and Data Management)
Workplan for Updating the As-built Architecture of the 2007 GEOSS Architecture Implementation Pilot Session 7B, 6 June 2007 GEOSS Architecture Implementation.
Capacity Building Enhance the coordination of efforts to strengthen individual, institutional and infrastructure capacities, particularly in developing.
GEOSS Future Products Workshop March 26-28, 2013 NOAA
LSI-VC Work Plan Updates
FDA-08 FDA Whitepaper Update
Work Programme 2012 COOPERATION Theme 6 Environment (including climate change) Challenge 6.4 Protecting citizens from environmental hazards European.
Presentation transcript:

1 CEOS WGISS project: GEOSS Reference Model for the Use of Satellite Data in Disaster Management and Risk Assessment John Evans - GST, Inc. Karen Moe - NASA Earth Science Technology Office GEOSS Future Products Workshop March 2013

2 Context

3 Problem Statement International disaster management involves: Many activities by many players Many ad hoc arrangements => Limited effectiveness, efficiency New suppliers: unclear how to contribute data & services New users: unclear how to tap into these data & services Unclear what resources are Shared Missing Interdependent Isolated Need to establish partnerships, standards, shared vocabulary, etc., in advance of disaster events Need a precise, common understanding of processes, information & computing resources, and user needs

4 Desired outcomes Clear, shared understanding Information systems & services: components, roles, relationships Effective, efficient, collaborative processes & systems Streamlined, automated access to data, services Scope: disaster mitigation, warning, response, & recovery Ongoing activities linked to overall enterprise Proof-of-concept prototypes, GEOSS AIP, CEOS DRM Shortfalls, gaps, redundancies identified Insights from (and relevant to) practitioner experience

5 Approach Describe satellite support to disaster management using a formal architecture framework Classes, relationships, interdependencies 3 Viewpoints: Enterprise, Information, Computation Analyze experiences with satellite support to disaster management Int’l Charter; Disaster Management Constellation; others East Japan earthquake (2011); NASA / Namibia Sensor Web Flood Pilot; Sichuan (China) earthquake (2008) Capture lessons learned; Recommend standards; Identify building blocks for sustainable capability Guidance for GEOSS, CEOS activities Disaster portals ( e.g., CEOS, UN-SPIDER, others) CEOS Disaster Risk Management (DRM) initiative

6 1 Based on CEOS / GEO DI report, “Use of Satellites for Risk Management” (2008) Scope, purpose, structure Scope & purpose based on GEO Task DI-01 GEOSS Strategic Targets CEOS WGISS charter Consistent with GEOSS principles System of Systems Data Sharing Principles Interoperability Arrangements Disaster types 1 Flooding Earthquakes Volcanoes Drought Windstorms Landslides Wildfires Tsunamis Lifecycle phases 1 Mitigation Warning Response Recovery Enterprise Viewpoint

7 Information content & semantics GEOSS AIP Architecture concepts Spatial referencing Feature Model Data Quality / Provenance Data Policies / Licensing etc. Observations by disaster type & phase – based on Work Plan (GEO, 2012) Work Plan Critical Earth Observations Priorities (GEO report, 2010) Critical Earth Observations Priorities GEOSS 10-Year Implementation Plan Reference Document (GEO, 2005) GEOSS 10-Year Implementation Plan Reference Document Use of Satellite Data for Risk Management (CEOS/GEO report, 2008) Use of Satellite Data for Risk Management Metadata Finding relevant data Assessing fitness for use Georeferencing Semantics Information Viewpoint

8 Information content & semantics Example: Information needs for Wildfires Information Viewpoint

9 Information content & semantics Practitioner insights Cross-cutting needs: Frequent, high-resolution observations Esp. for earthquake, flood response & recovery Basemaps – e.g., Digital terrain models – Water boundaries – Ground control points Common data operations Preprocessing (e.g., decoding, georeferencing, atmospheric correction – “Level 1”) Analysis & Interpretation (incl. feature extraction) Product creation (incl. “image pyramids” for visualization) Information Viewpoint

10 Computation and Services Generic service types (from AIP-5 architecture) : Catalog Registration & Search Portrayal / Display / Styling Data Access & Ordering Processing algorithms Sensor access & control User management Disaster-specific service types: Event detection Sensor tasking Data Analysis / Interpretation Modeling / Prediction Namibia Flood Pilot Sensor Web Concept Computation Viewpoint

11 Computation and Services Practitioner insights Cross-cutting needs: Near-Real-Time data access / delivery Cross-community interoperability Ease of use; ease of operation / maintenance “Last mile” to end-users (incl. telecomm. infrastructure) Web Services & other services Broadcast / push (LDM, GeoNetCast) Physical media delivery Computation Viewpoint

12 Functions involved in Satellite Data Support to Disaster Management User-generated postings Routine / Global Monitoring 1. Event detection Routine / Global model outputs 4. Modeling Task sensors In situ Remote Acquire data 3. Data acquisition Archive Visualize Ongoing updates Alerts / Notices Publish product 6. Dissemination Preprocess Analyze 5. Analysis Interpret Decision Analysis: Act / Plan 2. Situational Awareness Gather / Assimilate Information Local Forecast Hindcast Nowcast

13 Phases of Disaster Management Capability System initiation vs. steady-state operations Initiation: Identify inputs for event detection; event triggers Choose indicators for situational awareness ( e.g., flood extent) Define modeling elements ( e.g., regional flood model) Develop workflows and data flows (for processing and delivery) Define automation goals ( e.g., subscriptions, custom products) Steady state: Monitor data streams, detect events & trigger workflows Track key indicators Task sensors; Acquire data Run models (hindcast, nowcast, forecast) Analyze and disseminate products

14 Preliminary recommendations Need coordination mechanisms for all phases of the disaster lifecycle Mitigation - Warning - Response - Recovery Need a services infrastructure to streamline access Near-real-time services On-demand, user-customizable products Specialized end-user tools (apply generic data & services) Meeting diverse user needs (JPEG images vs. quantitative data grids) Need open, well-defined interfaces Data access Data processing & interpretation Modeling Sensor tasking 1/14/

15 Preliminary recommendations Metadata describing fitness for use is crucial Operational decisions require knowing data quality Can’t just filter out all imperfect data … As are tools for finding / ranking / filtering data from multiple sources Based on spatial & temporal coverage; resolution; cloud cover; Based on expected use ( e.g., wildfire detection) 2-way collaboration is increasingly important Providers may also be co-analysts, who may also be end users Need broader, more accessible data access & data sharing Ease restrictions on redistribution Crucial to providing frequent, high-resolution observations

16 State of the art Service-oriented processes, incl. a few kinds of Service interoperability Sensor tasking & services Customized, on-demand products User-generated / crowd-sourced data Metadata that begin to support Catalog search Assessing fitness for use Workflow automation Clear semantics

17 Near-future directions Robust services infrastructure Simple, predictable service interoperability Widespread, standards-based sensor access & tasking Simple access to customized, on-demand products Standards / Infrastructures for user-generated data Metadata that can fully support Reliable data discovery and filtering Workflow automation => high-level user interfaces Semantic linking across providers and communities

18

19 Framework: ISO/IEC Reference Model of Open Distributed Processing (RM-ODP) Enterprise viewpoint: the purpose, scope, and policies for the system. Often articulated by means of use cases. Information viewpoint: the semantics of the information and the information processing performed. Computation viewpoint: the functional decomposition of the system into objects interacting at interfaces. RM-ODP is the basis for GEOSS Architecture Implementation Pilot (AIP), E.U. ORCHESTRA, OGC Reference Model, and others

20 Framework: ISO/IEC Reference Model of Open Distributed Processing (RM-ODP)

21 Enterprise view: purpose / scope GEO Task DI-01, “Informing Risk Management and Disaster Reduction” seeks to achieve the following: More timely dissemination of information from globally- coordinated systems for hazard monitoring, prediction, risk assessment, early warning, mitigation, and response. Multi-hazard and/or end-to-end approaches to disaster risk reduction, preparedness, and response. Support for the Hyogo Framework for Action Improved use of observations in policies, decisions and actions associated with disaster preparedness and mitigation. More effective access to observations to facilitate disaster warning, response and recovery. Increased communication and coordination between national, regional and global communities. Improved disaster response through delivery of space-based data, via the International Charter on Space and Major Disasters.

22 Enterprise view: purpose / scope GEO DI-01 focus areas: Provide support to operational systems Enable and inform risk and vulnerability analyses Conduct regional end-to-end pilots with a focus on building institutional relationships Conduct gap analyses in order to identify missing data, system gaps, and capacity gaps GEO DI-01 components: Disaster Management Systems Geohazards Monitoring, Alert, and Risk Assessment Tsunami Early Warning and Hazard Assessment Global Wildland Fire Information System Regional End-to-End Pilots GEO DI-01 implementation Resources

23 Enterprise view: Stakeholders Often mentioned; seldom characterized or enumerated Case studies will shed light on this from practitioner perspectives GEOSS AIP-3 (01/2010): “targeted or supported” communities National agencies concerned with disaster management, meteorology, hydrology, and emergency response, and their supporting providers of data, services, research, and analysis CEOS Strategic Implementation Team (SIT) and WGISS GEOSS' DI (=> DI-01) Task UN-SPIDER GEOSS AIP-3 Disaster Management reference scenario: Initiators (trigger and coordinate the disaster response) Actuators (respond to disaster – e.g., regional civil protection, insurance companies, NGOs) Processors (provide raw data or derived information) Coordinators (facilitate interactions among the other actors)

24 Enterprise view: Processes Information support activities (from GEOSS AIP-5 architecture)

25 GEOSS Data Sharing Principles System of Systems Independently operated systems contributed to (also) serve shared purposes Data Sharing Principles Full and open exchange of data Minimum delay and cost Support to research or education at zero or marginal cost Interoperability Arrangements Industry & international interface standards Adopted by the GEO Standards and Interoperability Forum (SIF) Maintained in the GEO Standards Registry

26 Enterprise view: points of comparison Example: International Charter Supply space-based data to relief efforts in the aftermath of major disasters Differences in scope w/ GA.4.D enterprise: Support disaster relief – not research, prevention, etc. Supply data products – not original data or end-user services

27 Enterprise view: points of comparison Example: GeoHazard Supersites Open access to data for 16 seismically active sites around the world Spaceborne SAR; GPS deformation measures; earthquake observations Differences in scope with GA.4.D enterprise: Seismic risks only – not floods, storms, etc. Emphasis is on research – not operations (so far)