Alameda Creek Watershed San Francisco Public Utilities Commission October 27, 2009.

Slides:



Advertisements
Similar presentations
CONFEDERATED TRIBES OF THE UMATILLA INDIAN RESERVATION Walla Walla River Juvenile and Adult Walla Walla River Juvenile and Adult Fish Passage Improvements.
Advertisements

Restore Lawyer Creek Habitat: Targeting Steelhead and Chinook Salmon.
Lawyer Creek Steelhead Trout Habitat Improvement Project presented by: Lewis Soil Conservation District.
This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of these action items during.
Carmel River Lagoon Update A presentation to the Carmel Point and Lagoon Preservation Association Monterey Peninsula Water Management District Status of.
Regional Water Planning Senate Bill 1 Introduction and Status as of August 01, 1999.
Rivanna Water & Sewer Authority Community Water Supply Plan Update Public Meeting Monticello High School September 21, :00 pm.
Statewide, average water use is roughly: 50% environmental 40% agricultural 10% urban The percentage of water use by sector varies dramatically across.
NWHA- Panel Discussion “Spawning Better Ideas for Fish Passage”
City of St Helena Upper York Creek Ecosystem Restoration Project April 28, 2015 St. Helena City Council Meeting.
Stanislaus River An overview…. History and Background One of largest tributaries to San Joaquin River Development of Basin began during the Gold Rush.
Cedar River Instream Flow Management Balancing Certainty and Flexibility.
Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research Program Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research.
History of Dam Building in the Klamath Basin Originating in Southern Oregon and extending through Northern California, the Klamath River Basin represents.
Implementation of the Biological Opinion for Russian River Water Supply, Flood Control Operations & Channel Maintenance National Marine Fisheries Service.
“Its All About the Sediment”
MANAGEMENT AND RESEARCH OF KALAMA RIVER STEELHEAD WASHINGTON DEPARTMENT OF FISH AND WILDLIFE KALAMA RESEARCH TEAM PAT HULETT CAMERON SHARPE CHRIS WAGEMANN.
Stock Status of Steelhead In California Katie Perry, California Department of Fish and Game.
Bureau of Reclamation Overview Christopher Cutler Deputy Chief Boulder Canyon Operations Office.
Newark Desalination Facility
Marin County Watershed Stewardship Plan
State of Oregon New Hydroelectric Projects Mary Grainey October 2008 Oregon Water Resources Department.
A Review of Some Grant-Funded Watershed Projects in Central Illinois: Part II Illinois Lake Management Association Grant Opportunities and Funding Options.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
Documenting O. mykiss life histories in the White Salmon River prior to the reintroduction of anadromous fish above Condit Dam. Brady Allen and Patrick.
Bay Area Integrated Regional Water Management Plan North Bay Watershed Association Meeting November 3, 2006 Working together to enhance sustainable water.
2010 Yakima Basin Science & Management Conference Yakima River Basin Study June 16, 2010 Joel Hubble, Technical Projects Biologist Columbia-Cascades Area.
Growth Trajectories of Wild California Steelhead Parr David Swank 1,2, Will Satterthwaite 1, Michael Beakes 1, Susan Sogard 2, Marc Mangel 1, Rob Titus.
Marin Coastal Permit Coordination Program. Why do we need a program? Called for in Watershed Plans: As many as 9 permits to consider for restoration.
IMPROVING MILLERTON LAKE FLOOD CONTROL OPERATIONS TO INCREASE WATER SUPPLY Mr. Antonio M. Buelna, P.E. Mr. Douglas DeFlitch Ms. Katie Lee October 29, 2009.
Integrated Regional Water Management MAY 22, 2015 TRACIE BILLINGTON DEPARTMENT OF WATER RESOURCES 1.
Kilarc-Cow Creek Hydroelectric Project Decommissioning FERC Project No. 606 Technical Meeting May 16, 2007, 1-4 pm Red Lion Redding, CA.
Dominguez-Escalante National Conservation Area Dominguez Canyon Wilderness Resource Management Plan Scoping Meetings August 30 and 31, 2010.
Watershed Council BAIRWMP Update 1/25/2011 Watershed Council BAIRWMP Update 1/25/2011 Prop 84 Planning Grant Proposal IRWMP Implementation Grant Proposal.
Dry Creek Fish Habitat Enhancement Feasibility Study Current Conditions Summary.
Laguna Creek Watershed Council Development of the Laguna Creek Watershed Management Action Plan & It’s Relevance to the Elk Grove Drainage Master Planning.
Stormwater Overview Board of County Commissioners Planning Conference March 1, 2007.
Solano Habitat Conservation Plan 580,000 Acres 36 Covered Species; 4 Natural Communities 17,500 acres of Urban Development; 1,280 acres of other New Facilities.
Delta Plan Draft Program EIR Status and Summary of Approach October 27, 2011 Not Reviewed/Approved by Delta Stewardship Council1October 27, 2011.
Kilarc-Cow Creek Hydroelectric Project Decommissioning FERC Project No. 606 Public Meeting May 15, 2007, 6-9 pm Millville Grange Palo Cedro, CA.
CALENDAR ITEM 101 FINAL ENVIRONMENTAL IMPACT REPORT (EIR) S A N F R A N C I S C O B A Y A N D D E L T A S A N D M I N I N G P R O J E C T STATE CLEARINGHOUSE.
Fish and Game Commission Meeting October 8, 2014 Stafford Lehr Fisheries Branch 2014 Proposed Fresh Water Sport Fishing Regulation Changes.
Population - 44,301 18% - Aged 65+ Household Median Income- $29,530 Jan.-March 2004 unemployment 14 % Demographics.
Watershed Stewardship Program Status of Marin County Public Works Watershed Program 11/7/08 11/7/08.
CVPIA §3406(b)(2) Water Operations on the Sacramento River Sacramento River Conservation Area Forum Technical Advisory Committee February 7, 2012.
California Energy Commission 1 LNG Permitting and Environmental Review: the View from California DOE LNG Forum Los Angeles June 1, 2006 Kevin Kennedy,
Wetlands Restoration Opportunities in Region 4. Los Angeles River – DeForest Wetlands Currently a flood control detention basin Adjoins the Dominguez.
NOAA’s National Marine Fisheries Service Biological Opinion for Water Supply, Flood Control Operations & Channel Maintenance by the Army Corps, SCWA, and.
Chesapeake Fish Passage Prioritization Project: Overview MARY ANDREWS NOAA JULIE DEVERS USFWS ERIK MARTIN THE NATURE CONSERVANCY CHESAPEAKE BAY FISH PASSAGE.
Jeff Horan, Habitat GIT Chair February 16, 2012 CBP Decision Framework in Action.
California Water Briefing APRIL 2006 Department of Water Resources.
BAY DELTA CONSERVATION PLAN SEPTEMBER SUISUN BAY SACRAMENTO STOCKTON STATE & FEDERAL PUMPING PLANTS Getting Oriented – The Delta.
Fish and Game Commission Meeting February 5, 2014 Fisheries Branch Stafford Lehr Request for Emergency Regulatory Action.
Pam Jeane Deputy Chief Engineer- Operations Sonoma County Water Agency Habitat Enhancement and Water Delivery.
For EBTJV meeting October 26, 2010 Executive Order Strategy for Protecting and Restoring the Chesapeake Bay Watershed.
STORM WATER SOLUTIONS FOR EXISTING URBAN AREAS: IDENTIFYING SITES TO MAXIMIZE RESULTS Jared Bartley, Cuyahoga SWCD September 8, 2011.
Environmental Scoping Meeting April 9, Meeting Outline Overview of the Proposed Project Purpose of the Scoping Meeting Environmental Review Process.
Recycled Water Salinity Reduction Policy Utilities Advisory Commission December 2, 2009.
Biological Opinions and ESA Consultations Ritchie Graves NMFS-NWR Hydropower Division Portland, Oregon February 19, 2013.
Assemblymember Adrin Nazarian
Savannah River Projects
Scoping Meeting April 20th 6:00 pm
Laura Hidas Alameda County Water District
Protecting the Quality of our Water
Pinole Creek Watershed Fish Passage Improvement Project
Watershed Restoration on the Lolo NF Benefits for the Clark Fork Watershed Taylor Greenup, Hydrologist, Lolo National Forest Jennifer Mickelson,
Zone 7 And WaterFix March 7, 2018
Gordon Becker Center for Ecosystem Management and Restoration
Yakima River Basin Integrated Water Resource Management Plan 2011 Yakima Basin Science & Management Conference Central Washington University Ellensburg,
California Water Commission
Presentation transcript:

Alameda Creek Watershed San Francisco Public Utilities Commission October 27, 2009

Alameda Creek Watershed Purpose – to provide an overview of activities, including a summary of SFPUC projects, and describe the context within the Alameda Creek Watershed for issues that will come before the Commission for discussion and/or decision.

Alameda Creek Watershed Approximately 440,000 acres (687 square miles) Subwatersheds Arroyo de la Laguna = 269,000 acres (420 square miles) Upper Alameda Creek = 130,000 acres (203 square miles) Lower Alameda Creek = 41,000 acres (64 square miles)

Alameda Creek Watershed Largest watershed within the Central California Coast Distinct Population Segment Region for Steelhead Final Federal Endangered Species Act listing decision in January 2006 Steelhead are the anadromous component of the O. mykiss population Current resident trout component in the watershed and reservoirs is not listed due to the BART Weir/Middle Rubber Dam barrier

Alameda Creek Watershed Water Operations Zone 7 Water Agency San Francisco Public Utilities Commission Alameda County Water District State Water Project’s South Bay Aqueduct Hydrology Very “flashy” (e.g., October 13, 2009 storm), intermittent stream flow Approximately 18 inches average annual precipitation Sycamore/Oak Woodland and grasses

Upper Alameda Creek Watershed SFPUC WSIP Sunol Valley projects New Irvington Tunnel (Nov 2009) Sunol Valley Water Treatment Plant Expansion and Treated Water Reservoir (Nov 2009) Calaveras Dam Replacement Project (2010) San Antonio Backup Pipeline (2011) Upper Alameda Creek Filter Gallery (2013)

Upper Alameda Creek Watershed Other SFPUC projects Alameda Watershed Habitat Conservation Plan Watershed and Environmental Improvement Program Sunol Valley Quarry Leases (e.g., SMP 30) Grazing Leases East Bay Regional Park District’s Sunol Regional Park Lease Nursery Leases Sustainable Agriculture Education Lease

Alameda Creek Watershed Other projects Pacific Gas and Electric’s natural gas line crossing Alameda County Water District and Alameda County Flood Control District fish passage project at the BART Weir/Middle Rubber Dam Apperson Ridge mining (i.e., SMP 17) Zone 7’s Stream Management Master Plan Alameda Creek Fisheries Restoration Workgroup

Alameda Creek Watershed SFPUC approach to Steelhead Restoration Alameda Creek Fisheries Restoration Workgroup MOU (April 2006) and Amendment (2009) Alameda Watershed Habitat Conservation Plan Calaveras Dam Replacement Project

Alameda Creek Watershed SFPUC approach to Steelhead Restoration Sunol and Niles Dams removed (October 2006) Four Fish Passage Reports (Calaveras Dam and Alameda Creek Diversion Dam completed; Natural Barriers and Critical Riffles scheduled for completion by December 2009)

Alameda Creek Watershed Alameda Creek Fisheries Restoration Workgroup hydrology and temperature modeling – will link projects within the watershed and provide input data to… SFPUC Alameda Watershed Habitat Conservation Plan fish modeling

Alameda Creek Watershed Key issues to be address in modeling Migration flows for adults to move upstream and juveniles to move downstream Feasibility and benefits of passage at remaining barriers (both natural and water supply infrastructure)

Calaveras Dam Replacement Project What’s changed since September 2005 CEQA scoping? Final Federal Endangered Species Act listing decision for Steelhead (January 2006) ACWD and ACFCD MOU with Summer 2010 target date for completion of fish passage project at the BART Weir/Middle Rubber Dam (August 2007) SFPUC proposes steelhead consultation process with NMFS (August 2008) WSIP Final PEIR certified (October 2008) Deputy General Manager memo regarding proposed operation of Calaveras Dam and Alameda Creek Diversion Dam to support steelhead restoration (March 2009)

Diversion Dam

Calaveras Dam Replacement Project Important Environmental Documents (both include March 2009 proposed operations to support steelhead restoration) National Marine Fisheries Service Biological Opinion (includes commitment to complete the Alameda Watershed Habitat Conservation Plan) Draft Environmental Impact Report

Alameda Creek Watershed What’s next? Calaveras Dam Replacement Project (Summer 2010) ACWD/ACFCD Fish Passage Project at the BART Weir/Middle Rubber Dam (Summer 2010) Alameda Watershed Habitat Conservation Plan, including independent review of hydrology, temperature, fish modeling, and potentially genetic concerns (2011)

Alameda Creek Watershed What’s next in Sunol Valley? SMP 30 related activities (2010) Slurry cutoff walls (to keep water in the creek and out of the quarry pits) Sunol Valley Restoration Plan PG&E natural gas line relocation (?) Upper Alameda Creek Filter Gallery Project (2013) Increased opportunities for public access, recreation, and education