Bob Jones – Project Architecture - 1 March 2002 - n° 1 Project Architecture, Middleware and Delivery Schedule Bob Jones Technical Coordinator, WP12, CERN.

Slides:



Advertisements
Similar presentations
Data Management Expert Panel - WP2. WP2 Overview.
Advertisements

Data Management Expert Panel. RLS Globus-EDG Replica Location Service u Joint Design in the form of the Giggle architecture u Reference Implementation.
EU 2nd Year Review – Jan – Title – n° 1 WP1 Speaker name (Speaker function and WP ) Presentation address e.g.
EGEE-II INFSO-RI Enabling Grids for E-sciencE The gLite middleware distribution OSG Consortium Meeting Seattle,
FP7-INFRA Enabling Grids for E-sciencE EGEE Induction Grid training for users, Institute of Physics Belgrade, Serbia Sep. 19, 2008.
Plateforme de Calcul pour les Sciences du Vivant SRB & gLite V. Breton.
NIKHEF Testbed 1 Plans for the coming three months.
DataGrid is a project funded by the European Union 22 September 2003 – n° 1 EDG WP4 Fabric Management: Fabric Monitoring and Fault Tolerance
A conceptual model of grid resources and services Authors: Sergio Andreozzi Massimo Sgaravatto Cristina Vistoli Presenter: Sergio Andreozzi INFN-CNAF Bologna.
1 Software & Grid Middleware for Tier 2 Centers Rob Gardner Indiana University DOE/NSF Review of U.S. ATLAS and CMS Computing Projects Brookhaven National.
10 April 2003Deploy Grid in Israel Universities1 Deploy Grid testbed in Israel universities Lorne Levinson David Front Weizmann Institute.
Cracow Grid Workshop, November 5-6, 2001 Towards the CrossGrid Architecture Marian Bubak, Marek Garbacz, Maciej Malawski, and Katarzyna Zając.
European DataGrid Project status and plans Peter Kunszt, CERN DataGrid, WP2 Manager
Workload Management Workpackage Massimo Sgaravatto INFN Padova.
GGF Toronto Spitfire A Relational DB Service for the Grid Peter Z. Kunszt European DataGrid Data Management CERN Database Group.
The EU DataGrid - Introduction The European DataGrid Project Team
DataGrid Kimmo Soikkeli Ilkka Sormunen. What is DataGrid? DataGrid is a project that aims to enable access to geographically distributed computing power.
Milos Kobliha Alejandro Cimadevilla Luis de Alba Parallel Computing Seminar GROUP 12.
Workload Management Massimo Sgaravatto INFN Padova.
The EU DataGrid Architecture The European DataGrid Project Team
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
5 November 2001F Harris GridPP Edinburgh 1 WP8 status for validating Testbed1 and middleware F Harris(LHCb/Oxford)
Olof Bärring – WP4 summary- 6/3/ n° 1 Partner Logo WP4 report Status, issues and plans
GT Components. Globus Toolkit A “toolkit” of services and packages for creating the basic grid computing infrastructure Higher level tools added to this.
Computational grids and grids projects DSS,
Grid Workload Management & Condor Massimo Sgaravatto INFN Padova.
Partner Logo DataGRID WP4 - Fabric Management Status HEPiX 2002, Catania / IT, , Jan Iven Role and.
DataGrid WP1 Massimo Sgaravatto INFN Padova. WP1 (Grid Workload Management) Objective of the first DataGrid workpackage is (according to the project "Technical.
1 DIRAC – LHCb MC production system A.Tsaregorodtsev, CPPM, Marseille For the LHCb Data Management team CHEP, La Jolla 25 March 2003.
Olof Bärring – WP4 summary- 4/9/ n° 1 Partner Logo WP4 report Plans for testbed 2
Grid Workload Management Massimo Sgaravatto INFN Padova.
- Distributed Analysis (07may02 - USA Grid SW BNL) Distributed Processing Craig E. Tull HCG/NERSC/LBNL (US) ATLAS Grid Software.
C. Loomis – Integration Status- October 31, n° 1 Integration Status October 31, 2001
Author - Title- Date - n° 1 Partner Logo EU DataGrid, Work Package 5 The Storage Element.
Author - Title- Date - n° 1 Partner Logo WP5 Summary Paris John Gordon WP5 6th March 2002.
First attempt for validating/testing Testbed 1 Globus and middleware services WP6 Meeting, December 2001 Flavia Donno, Marco Serra for IT and WPs.
June 24-25, 2008 Regional Grid Training, University of Belgrade, Serbia Introduction to gLite gLite Basic Services Antun Balaž SCL, Institute of Physics.
Ames Research CenterDivision 1 Information Power Grid (IPG) Overview Anthony Lisotta Computer Sciences Corporation NASA Ames May 2,
NA-MIC National Alliance for Medical Image Computing UCSD: Engineering Core 2 Portal and Grid Infrastructure.
JRA Execution Plan 13 January JRA1 Execution Plan Frédéric Hemmer EGEE Middleware Manager EGEE is proposed as a project funded by the European.
CLRC and the European DataGrid Middleware Information and Monitoring Services The current information service is built on the hierarchical database OpenLDAP.
What is SAM-Grid? Job Handling Data Handling Monitoring and Information.
GRIDS Center Middleware Overview Sandra Redman Information Technology and Systems Center and Information Technology Research Center National Space Science.
INFSO-RI Enabling Grids for E-sciencE OSG-LCG Interoperability Activity Author: Laurence Field (CERN)
DataGRID PTB, Geneve, 10 April 2002 Testbed Software Test Plan Status Laurent Bobelin on behalf of Test Group.
CEOS Working Group on Information Systems and Services - 1 Data Services Task Team Discussions on GRID and GRIDftp Stuart Doescher, USGS WGISS-15 May 2003.
German Cancio – WP4 developments Partner Logo WP4 / ATF ATF meeting, 9/4/2002
DGC Paris WP2 Summary of Discussions and Plans Peter Z. Kunszt And the WP2 team.
Introduction to Grids By: Fetahi Z. Wuhib [CSD2004-Team19]
The EU DataGrid The European DataGrid Project Team
29/1/2002A.Ghiselli, INFN-CNAF1 DataTAG / WP4 meeting Cern, 29 January 2002 Agenda  start at  Project introduction, Olivier Martin  WP4 introduction,
Globus and PlanetLab Resource Management Solutions Compared M. Ripeanu, M. Bowman, J. Chase, I. Foster, M. Milenkovic Presented by Dionysis Logothetis.
Summary from WP 1 Parallel Section Massimo Sgaravatto INFN Padova.
An overview of the EGEE infrastructure and middleware EGEE is funded by the European Union under contract IST Emmanuel Medernach Based on a.
10 May 2001WP6 Testbed Meeting1 WP5 - Mass Storage Management Jean-Philippe Baud PDP/IT/CERN.
DataGrid is a project funded by the European Commission under contract IST rd EU Review – 19-20/02/2004 The EU DataGrid Project Three years.
Gennaro Tortone, Sergio Fantinel – Bologna, LCG-EDT Monitoring Service DataTAG WP4 Monitoring Group DataTAG WP4 meeting Bologna –
CERN Certification & Testing LCG Certification & Testing Team (C&T Team) Marco Serra - CERN / INFN Zdenek Sekera - CERN.
CERN 1 DataGrid Architecture Group Bob Jones CERN.
EGEE-II INFSO-RI Enabling Grids for E-sciencE Overview of gLite, the EGEE middleware Mike Mineter Training Outreach Education National.
The EPIKH Project (Exchange Programme to advance e-Infrastructure Know-How) gLite Grid Introduction Salma Saber Electronic.
J Jensen / WP5 /RAL UCL 4/5 March 2004 GridPP / DataGrid wrap-up Mass Storage Management J Jensen
Bob Jones EGEE Technical Director
The EDG Testbed Deployment Details
U.S. ATLAS Grid Production Experience
GGF OGSA-WG, Data Use Cases Peter Kunszt Middleware Activity, Data Management Cluster EGEE is a project funded by the European.
Sergio Fantinel, INFN LNL/PD
Introduction to Grid Technology
A conceptual model of grid resources and services
Wide Area Workload Management Work Package DATAGRID project
Presentation transcript:

Bob Jones – Project Architecture - 1 March n° 1 Project Architecture, Middleware and Delivery Schedule Bob Jones Technical Coordinator, WP12, CERN

Bob Jones – Project Architecture - 1 March n° 2 Outline u First year objectives u Architecture overview u Details of each middleware Work Package u Job submission example u Architecture issues and actions u Interaction with PPDG/GriPhyN/iVDGL u Interaction with Globus & Globus Grid Forum (GGF) u Plans for 2002 u Summary

Bob Jones – Project Architecture - 1 March n° 3 Objectives for the first year of the project u Collect requirements for middleware n Take into account requirements from application groups u Survey current technology n For all middleware u Core Services testbed n Testbed 0: Globus (no EDG middleware) u First Grid testbed release n Testbed 1: first release of EDG middleware u WP1: workload n Job resource specification & scheduling u WP2: data management n Data access, migration & replication u WP3: grid monitoring services n Monitoring infrastructure, directories & presentation tools u WP4: fabric management n Framework for fabric configuration management & automatic sw installation u WP5: mass storage management n Common interface for Mass Storage Sys. u WP7: network services n Network services and monitoring

Bob Jones – Project Architecture - 1 March n° 4 DataGrid Architecture Collective Services Information & Monitoring Replica Manager Grid Scheduler Local Application Local Database Underlying Grid Services Computing Element Services Authorization Authentication and Accounting Replica Catalog Storage Element Services SQL Database Services Fabric services Configuration Management Configuration Management Node Installation & Management Node Installation & Management Monitoring and Fault Tolerance Monitoring and Fault Tolerance Resource Management Fabric Storage Management Fabric Storage Management Grid Fabric Local Computing Grid Grid Application Layer Data Management Job Management Metadata Management Object to File Mapping Service Index

Bob Jones – Project Architecture - 1 March n° 5 EDG Interfaces Collective Services Information & Monitoring Replica Manager Grid Scheduler Local Application Local Database Underlying Grid Services Computing Element Services Authorization Authentication and Accounting Replica Catalog Storage Element Services SQL Database Services Fabric services Configuration Management Configuration Management Node Installation & Management Node Installation & Management Monitoring and Fault Tolerance Monitoring and Fault Tolerance Resource Management Fabric Storage Management Fabric Storage Management Grid Application Layer Data Management Job Management Metadata Management Object to File Mapping Service Index Computing Elements System Managers Scientists Operating Systems File Systems Storage Elements Mass Storage Systems HPSS, Castor User Accounts Certificate Authorities Application Developers Batch Systems

Bob Jones – Project Architecture - 1 March n° 6 WP1: WorkLoad Management u Achievements n Analysis of work-load management system requirements & survey of existing mature implementations Globus & Condor (D1.1) n Definition of architecture for scheduling & res. mgmt. (D1.2) n Development of "super scheduling" component using application data and computing elements requirements u Issues n Distributed nature of WP1 development groups Components Job Description Language Resource Broker Job Submission Service Information Index User Interface Logging & Bookkeeping Service Collective Services Information & Monitoring Replica Manager Grid Scheduler Local Application Local Database Underlying Grid Services Computing Element Services Authorization Authentication and Accounting Replica Catalog Storage Element Services SQL Database Services Fabric services Configuration Management Configuration Management Node Installation & Management Node Installation & Management Monitoring and Fault Tolerance Monitoring and Fault Tolerance Resource Management Fabric Storage Management Fabric Storage Management Grid Application Layer Data Management Job Management Metadata Management Object to File Mapping Service Index

Bob Jones – Project Architecture - 1 March n° 7 WP2: Data Management u Achievements n Survey of existing tools and technologies data access and mass storage systems (D2.1) n Definition of architecture for data management (D2.2) n Close collaboration with Globus, PPDG/GriPhyN & Condor n Working with GGF on standards n Deployment of GDMP in testbed1 u Issues n Security: clear methods handling authentication and authorization Components SpitFire GDMP Replica Catalog Collective Services Information & Monitoring Replica Manager Grid Scheduler Local Application Local Database Underlying Grid Services Computing Element Services Authorization Authentication and Accounting Replica Catalog Storage Element Services SQL Database Services Fabric services Configuration Management Configuration Management Node Installation & Management Node Installation & Management Monitoring and Fault Tolerance Monitoring and Fault Tolerance Resource Management Fabric Storage Management Fabric Storage Management Grid Application Layer Data Management Job Management Metadata Management Object to File Mapping Service Index

Bob Jones – Project Architecture - 1 March n° 8 WP3: Grid Monitoring Services u Achievements n Survey of current technologies for info & monitoring in grid environments (D3.1) n Coordination of schemas in testbed 1 n Development of Ftree caching backend based on OpenLDAP to address shortcoming in MDS v1 n Design of Relational Grid Monitoring Architecture (R-GMA) (D3.2) – to be further developed within the context of GGF n Collaboration with Globus for Ftree and PPDG/GriPhyN for res. discovery and schemas n GRM and PROVE adapted to grid environments to support end-user application monitoring u Issues n R-GMA development Components MDS/Ftree R-GMA GRM/PROVE Collective Services Informati on & Monitorin g Replica Manager Grid Scheduler Local Application Local Database Underlying Grid Services Computi ng Element Services Authorizat ion Authentication and Accounting Replica Catalog Storage Element Services SQL Database Services Fabric services Configuratio n Management Configuratio n Management Node Installation & Management Node Installation & Management Monitoring and Fault Tolerance Monitoring and Fault Tolerance Resource Managemen t Fabric Storage Management Fabric Storage Management Grid Application Layer Data Manageme nt Job Manageme nt Metadata Manageme nt Object to File Mapping Service Index

Bob Jones – Project Architecture - 1 March n° 9 WP4: Fabric Management u Achievements n Survey of existing tools, techniques and protocols for resource specification, configuration and management, as well as integrated cluster management suites (D4.1) n Defined an agreed architecture for fabric management (D4.2) n Initial implementations deployed at several sites in testbed 1 u Issues n Image Installation and Configuration Cache Manager components remain to be integrated Components LCFG PBS & LSF info providers Imagine installation Config. Cache Mgr Collective Services Information & Monitoring Replica Manager Grid Scheduler Local Application Local Database Underlying Grid Services Computing Element Services Authorization Authentication and Accounting Replica Catalog Storage Element Services SQL Database Services Fabric services Configuration Management Configuration Management Node Installation & Management Node Installation & Management Monitoring and Fault Tolerance Monitoring and Fault Tolerance Resource Management Fabric Storage Management Fabric Storage Management Grid Application Layer Data Management Job Management Metadata Management Object to File Mapping Service Index

Bob Jones – Project Architecture - 1 March n° 10 WP5: Mass Storage Management u Achievements n Review of Grid data systems, tape and disk storage systems and local filesystems (D5.1) n Definition of Architecture and Design for DataGrid storage Element (D5.2) n Collaboration with Globus on GridFTP/RFIO n Collaboration with PPDG on control API n First attempt at exchanging HSM tapes u Issues n Scope and requirements for storage element n Interworking with other Grids Components SE info providers RFIO MSS staging Collective Services Information & Monitoring Replica Manager Grid Scheduler Local Application Local Database Underlying Grid Services Computing Element Services Authorization Authentication and Accounting Replica Catalog Storage Element Services SQL Database Services Fabric services Configuration Management Configuration Management Node Installation & Management Node Installation & Management Monitoring and Fault Tolerance Monitoring and Fault Tolerance Resource Management Fabric Storage Management Fabric Storage Management Grid Application Layer Data Management Job Management Metadata Management Object to File Mapping Service Index

Bob Jones – Project Architecture - 1 March n° 11 WP6: TestBed Integration u Achievements n Integration of EDG sw release 1.0 and deployment n Working implementation of multiple VOs & basic security infrastructure n Definition of acceptable usage contracts and creation of Certification Authorities group u Issues n Procedures for software integration n Test plan for software release n Support for production-style usage of the testbed Components Globus packaging & EDG config Build tools End-user documents Collective Services Informati on & Monitorin g Replica Manager Grid Scheduler Local Application Local Database Underlying Grid Services Computi ng Element Services Authorization Authentication and Accounting Replica Catalog Storage Element Services SQL Database Services Fabric services Configuratio n Management Configuratio n Management Node Installation & Management Node Installation & Management Monitoring and Fault Tolerance Monitoring and Fault Tolerance Resource Managemen t Fabric Storage Management Fabric Storage Management Grid Application Layer Data Manageme nt Job Manageme nt Metadata Manageme nt Object to File Mapping Service Index WP6 additions to GlobusGlobus

Bob Jones – Project Architecture - 1 March n° 12 WP7: Network Services u Achievements n Analysis of network requirements for testbed 1 & study of available network physical infrastructure (D7.1) n Collaboration with Dante & DataTAG n Working with GGF (GHPN) & Globus (monitoring/MDS) n Use of European backbone GEANT since Dec n Initial network monitoring architecture defined(D7.2) and first tools deployed in testbed 1 u Issues n Resources for study of security issues n End-to-end performance for applications depend on a complex combination of components Components network monitoring tools: PingER Udpmon Iperf Collective Services Information & Monitoring Replica Manager Grid Scheduler Local Application Local Database Underlying Grid Services Computing Element Services Authorization Authentication and Accounting Replica Catalog Storage Element Services SQL Database Services Fabric services Configuration Management Configuration Management Node Installation & Management Node Installation & Management Monitoring and Fault Tolerance Monitoring and Fault Tolerance Resource Management Fabric Storage Management Fabric Storage Management Grid Application Layer Data Management Job Management Metadata Management Object to File Mapping Service Index

Bob Jones – Project Architecture - 1 March n° 13 A Job Submission Example UI JDL Logging & Book-keeping ResourceBroker Output “sandbox” Input “sandbox” Job Submission Service StorageElement ComputeElement Brokerinfo Output “sandbox” Input “sandbox”InformationService Job Status ReplicaCatalogue Author. &Authen. Job Submit Job Query Job Status

Bob Jones – Project Architecture - 1 March n° 14 Architecture Issues and Actions u Some concepts remain vague n e.g. interactive jobs u Some boundaries are unclear n e.g scope/functionality of a Storage Element u Some requirements are not yet addressed n e.g. anonymous users u The various software components are not yet fully integrated n e.g. Storage Element, Computing Elements & Info. Sys. u Short term/ Long term trade-offs u Impact of Open Grid Services Architecture n Forthcoming developments by Globus/IBM/GGF u Convergence with US Grid project activities (PPDG/GriPhyN) u The new architecture group will address these points taking into account our experience from testbed1 and further requirements u Implementation of iterative releases, nightly builds and separation of development testbed from production testbed

Bob Jones – Project Architecture - 1 March n° 15 u Planned intermediate release schedule n TestBed 1:November 2001 n Release 1.1: January 2002 n Release 1.2: March 2002 n Release 1.3: May 2002 n Release 1.4: July 2002 n TestBed 2: September 2002 u Similar schedule will be made for 2003 u Each release includes n feedback from use of previous release by application groups n planned improvements/extension by middle-ware WPs n use of WP6 software infrastructure n feeds into architecture group Plans for 2002 u Extension of testbed n more users, sites & nodes-per-site n Split testbed into development and production sites n Investigate inter-operability with US grids u Iterative releases up to testbed 2 n incrementally extend functionality provided via each Work Package n better integrate the components n improve stability u Testbed 2 (fall 2002) extra requirements n Interactive jobs n Job partitioning for parallel execution n Advance reservation n Accounting & Query optimization n Security design (D7.6) n... demos

Bob Jones – Project Architecture - 1 March n° 16 Interaction with PPDG/GriPhyN/iVDGL u Work with dataTAG via the InterGrid to investigate inter- operability of US and EU grids 1. Authentication infrastructure –perform cross organizational authentication 2. Unified service discovery and information infrastructure – discover the existence and configuration of service offered by the testbeds. 3. Data movement infrastructure – move data from storage services operated by one organization to another 4. Authorization services – perform some level of cross organization, community based authorization 5. Computational services – coordinate computation across organizations – to allow submission of jobs in EU to run on US sites and vice versa

Bob Jones – Project Architecture - 1 March n° 17 Interaction with Globus & GGF u Software Licensing – open source agreements for all components u WP1 n Advance Reservation Infrastructure u WP2 n GDMP joint-development and overlap with plans for future Globus Replica Manager n GridFTP/NetLogger integration u WP3 n MDS/Ftree integration n Relationship between R-GMA, GGF and OGSA u WP4 n Authorization capabilities of the Globus gatekeeper n Use resource mgmt subsystem instead of Globus job manager u WP5 n Thread-safe GSI API n RFIO using GridFTP u WP6 n Packaging n Community Authorization Service u WP7 n Integration of MapCentre with MDS n Network message publication to Info. Services

Bob Jones – Project Architecture - 1 March n° 18 Summary u Application groups requirements defined and analysed u Extensive survey of relevant technologies completed and used as a basis for EDG developments u First release of the testbed successfully deployed u Excellent collaborative environment developed with key players in Grid arena u Project can be judged by: n level of "buy-in" by the application groups n wide-spread usage of EDG software n number and quality of EDG sw releases n positive influence on developments of GGF standards & Globus toolkit