ILC EDMS Selection Committee Progress Report Tom Markiewicz SLAC 29 November 2005.

Slides:



Advertisements
Similar presentations
Integrated Ocean Observing System (IOOS) Data Management and Communication (DMAC) Standards Process Julie Bosch NOAA National Coastal Data Development.
Advertisements

A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Jan 28, 2009CFS-GBL meeting 1 PM report Jan 28, 2009: Reviews –AAP –PAC (May 9 and 10, 2009) Meetings –TILC09 FALC –Madrid, Jan 19, 2009.
1 Chapter 2: Product Development Process and Organization Introduction Importance of human resources: Most companies have similar technology resources.
The System Development Life Cycle
Financial Systems Needs Assessment Project Update Monthly Research Administrators Meeting March 11, 2010.
1 Software & Grid Middleware for Tier 2 Centers Rob Gardner Indiana University DOE/NSF Review of U.S. ATLAS and CMS Computing Projects Brookhaven National.
MDI-BDIR-ILC Communications Tom Markiewicz SLAC 08 January 2005.
Copyright 2004 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Second Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Chapter 5: Project Scope Management
Creating Collaborative Partnerships
Software Documentation Written By: Ian Sommerville Presentation By: Stephen Lopez-Couto.
Software and Multimedia
Xpantrac connection with IDEAL Sloane Neidig, Samantha Johnson, David Cabrera, Erika Hoffman CS /6/2014.
Copyright 2001 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter 1 The Systems.
Project Proposal: Academic Job Market and Application Tracker Website Project designed by: Cengiz Gunay Client: Cengiz Gunay Audience: PhD candidates and.
ILC EDMS Status Tom Markiewicz/SLAC Vancouver GDE/ALCPG – SiD Meeting 23 July 2006.
Distributed Monitoring and Mining Advisor: Dr. Stuart Faulk Team: Ahmed Osman, Isaac Pendergrass, Shail Shimpi, Tom Mooney OMSE-555/556 Software Engineering.
John Ferguson October Presentation on 2010 Website, slides,video Historical overview of AIS project, And subsequent developments Project management.
E-Document Maura Barone (GDE/Fermilab) – Part 1 Lars Hagge (DESY) – Part 2 2 June 2007.
Report from ILC GlobalGroup 5: Cost and Engineering (Updates since Snowmass) Wilhelm Bialowons, Peter Garbincius and Tetsuo Shidara · GDE December 8, 2005.
Crystal Hoyer Program Manager IIS Team Preview of features that will be announced at MIX09 Please do not blog, take pictures or video of session.
ILC EDMS project suite Status Maura Barone GDE/Fermilab ILC Valencia - November 7, 2006.
First Indico Workshop Indico Project Status José Benito González López May 2013 CERN.
European GDE Meeting – Oxford, October 25th /13 European GDE Communication: Future Plans European GDE Communication: Future Plans Perrine Royole-Degieux.
Web Trnsport – Beta Testing and Implementation TUG Roundtable Discussion Elizabeth Rodgers Info Tech, Inc. October 9, 2007.
Chapter 14 Information System Development
Report from GG5, Dec. 20, 2005 Report from ILC GG 5: Cost and Engineering (Updates since Snowmass) Wilhelm Bialowons, Peter Garbincius and Tetsuo Shidara.
Identify steps for understanding and solving the
 Chapter 6 Architecture 1. What is Architecture?  Overall Structure of system  First Stage in Design process 2.
James Williams e: eTutor Project SUMMARY OF KEY FINDINGS for 2 Pilot studies of the.
Enterprise Social Networking Pilot Project April 14, 2010.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
LARP Communications and Web Pages Elliott McCrory Fermilab April 26, 2006.
2005 JACoW Team Meeting Thomas Baron/Jose Benito Gonzalez – CERN – IT Managing Events with Indico.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
Project Outline City of Mountain View – need image !
EDMS for CFS Discussion: How to best use EDMS for CFS in ILC preparation? Lars Hagge, Benno List Deutsches Elektronen-Synchrotron DESY LCWS13, Tokyo,
Comprehensive Everglades Restoration Plan Web evergladesplan.org.
9/23/2009 NOTICE! These materials are prepared only for the students enrolled in the course Distributed Software Development (DSD) at the Department of.
Enterprise Content Management
Management Tools K. Pommès. Management Tools - The Project Planning Design Purchasing Production Installation To follow the project through its phases.
EDU 225: Instructional Technology Week 4 Last week  We explored Live Binders and some Educational Software  We shared some resources you found for.
Proposal for CDS Submission Categories Tom Markiewicz/SLAC EDMS Meeting 16 November 2006.
Feb 7th, 2007 BILCW07 1 ILCAgenda – ILCDoc – ILC EDMS Status Maura Barone GDE/Fermilab.
S1 Global Plug Compatibility CAD Tools & Collaboration April 23, 2008 Don Mitchell, FNAL.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
State of Georgia Release Management Training
Oman College of Management and Technology Course – MM Topic 7 Production and Distribution of Multimedia Titles CS/MIS Department.
- How to draw a clear distinction between a client and a server(there is often no clear distinction) - A server may continuously act as a client - Distinction.
McGraw-Hill/Irwin © 2008 The McGraw-Hill Companies, All Rights Reserved Chapter 15 Creating Collaborative Partnerships.
EDMS for EGEE-IIEDMS No: ver 1 David Widegren, CERN, TS/CSE Using the CERN EDMS in the EGEE-II project.
1 of 5 CONVENTIONAL FACILITIES & SITING GROUP PROGRESS OVERVIEW J.L. Baldy, A. Enomoto, V. Kuchler V. KUCHLER GDE Executive Committee Meeting
Jan 18, EDMS 1 Status of ILCDoc Maura Barone GDE/Fermilab.
NCI Clinical Trials Reporting Program CTRP User Meeting May 4, 2011.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Product Lifecycle Management with the CERN EDMS David Widegren CERN, TS/CSE 8 Nov 2005EDMS:
LARP Communications and Web Pages Elliott McCrory Fermilab April 26, 2006.
VIEWS b.ppt-1 Managing Intelligent Decision Support Networks in Biosurveillance PHIN 2008, Session G1, August 27, 2008 Mohammad Hashemian, MS, Zaruhi.
Indico – CERN-UNOG meeting – 28 Feb CERN – IT 1 INDICO Event Management and Archival Thomas Baron CERN-UNOG Meeting 28 th February 2012.
Brian Drendel November 15, Ideas TDM (Engineering drawings) Beamssrv1 Z: drive Beamssrv1 Department Drive Indico Meeting Server Document Database.
Data Coordinating Center University of Washington Department of Biostatistics Elizabeth Brown, ScD Siiri Bennett, MD.
ILC Community/Communications Issues Tom Markiewicz SLAC 04 May 2005.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks GOCDB4 Gilles Mathieu, RAL-STFC, UK An introduction.
ILC EDMS Selection Committee Progress Report Tom Markiewicz / SLAC 12 January 2006 GDE Executive Committee Weekly Meeting.
The System Development Life Cycle
ILC EDMS Selection Committee Progress Report
The System Development Life Cycle
Document Management Don Mitchell March 15, 2019.
UNIT No- III- Leverging Information System ( Investing strategy )
Presentation transcript:

ILC EDMS Selection Committee Progress Report Tom Markiewicz SLAC 29 November 2005

Tom Markiewicz 2 / 17 Committee Members John Ferguson - CERN - John.Ferguson(at)cern.ch Lars Hagge - DESY - lars.hagge(at)desy.de Tom Markiewicz - SLAC - twmark(at)slac.stanford.edu (Chair) Nobu Toge - KEK - Nobu.Toge(at)kek.jp Richard Stanek - FNAL - rstanek(at)fnal.gov Harry Weerts - Argonne - weerts(at)pa.msu.edu

Tom Markiewicz 3 / 17 Charge to the Committee The committee should recommend a specific web based software solution, which may mean an integrated collection of distinct software packages that will allow ILC collaborators worldwide to store, search for and retrieve various kinds of documents. At least three basic kinds of documents must be handled: 1) meeting/conference/seminar related files, 2) publications/white papers/notes and 3) engineering documents: CAD drawings, cost estimates, vendor quotes, and QC documents.

Tom Markiewicz 4 / 17 Anti-Charge to the Committee The recommendation of other related virtual communication tools may be made if they enhance the functioning of the basic document management system. Such tools may include calendars, agendas, ing lists, notification, discussion forums, user-modifiable ("wiki") web pages for interactive working group documentation, etc. The recommendation or incorporation of these tools should be considered secondary to the selection of system that supports the core functions of storage, search and retrieval. Project management tools (WBS, scheduling, resource planning) are outside the scope of current charge.

Tom Markiewicz 5 / 17 Timeline (from Charge) One of the first deliverables of the group should be a written set of requirements for the software tools. The recommended solution must reflect the international, multi-institution nature of the ILC and should try to unify the work occurring in the different regions on the many disparate aspects of the ILC. A progress report to the GDE should be made at the December 2005 meeting. It is hoped that a decision can be made early enough in 2006 that implementation, testing and backfilling of the archive can occur before the fourth meeting of the GDE in March 2006, with release to the general ILC community targeted to April 1, 2006.

Tom Markiewicz 6 / 17 Web Page ilc_dms_selection_home

Tom Markiewicz 7 / 17 Committee Meetings –Initial contact as group –Abstract discussion of requirements –Live Demo of Fermilab Installation of Team Center Engineering EDMS product to 3/6 committee members –Discussion of 1 st draft (Hagge) of requirements document –Video Demo of CERN InDiCo (Meeting Manager) and CERN EDMS (Axalant & Datastream7i, two commercial products) –Video Demo of DESY installation of UGS TeamCenter EDMS –Discussion of progress reports, requirements, costs, beta testing strategies prior to selection, post selection implementation strategies

Tom Markiewicz 8 / 17 Requirements Document For the purposes of this status report the key phrase in the requirements document is: Assumptions and Dependencies Given the time constraints, only systems which are in use at an HEP laboratory and which are provided by teams with experience in implementing, running and supporting an EDMS will be considered.

Tom Markiewicz 9 / 17 Products Considered CERN Suite –InDiCo –CDS (Cern Document Server) Not yet reviewed –CERN EDMS Axalant Datastream7i User Databases UGS Team Center Product –UGS Team Center (DESY) –UGS Team Center Engineering (FNAL) Hybrids of these elements

Tom Markiewicz 10 / 17 Description of Products Being Considered See web site for ppt talks with screen captures & loads more text than can fit in this talk

Tom Markiewicz 11 / 17 In Tom’s Opinion at this point there are two logical choices Team Center for Meetings, Documents & Engineering Applications InDiCo for Meeting Management –HEP “Industry Standard” Team Center for Documents & Engineering –Back fill Team Center with InDiCo pointers & files No concrete reason not to choose CERN EDMS –This is where comparison with requirements document would come in

Tom Markiewicz 12 / 17 Dilemma How to choose a system without at least trying to implement an ILC specific instance?

Tom Markiewicz 13 / 17 Support In Q1 of 2006 will need expert support to –implement the chosen solution –back fill it with enough data/content/usefulness that users adopt it –Test & administer

Tom Markiewicz 14 / 17 Conclusion If GDE accepts limited scope of search, we are close to a decision