November 2013 Institution update

Slides:



Advertisements
Similar presentations
F&T Inc. OVERHEAD CRANE SAFETY.
Advertisements

Rien Visser, Virginia Tech
SeaCycler AST2 Surface Piercing Profiler Technology.
Scissor Lift Safety Training
J.M. Gabrielse VEX Lifts (Devices that extend upwards) Lab Rats’ 2008 Bridge Battle Robot.
Loading and Transporting Logs Section K of the logging code.
SIO 210: I. Observational methods and II. Data analysis (combined single lecture) Fall 2013 Remote sensing In situ T, S and tracers Velocity Observing.
FALL PROTECTION.
FEA of Wind Turbine Tower Martin Knecht. The Problem FEA modeling of a wind turbine tower. Analysis: –Stress –Deflection Want to prevent –Yielding –Excessive.
Flexible Mechanical Elements for Motion & Power Transmission
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Moments of Inertia Polar moment of inertia – Used when calculating the torsion – Indication of resistance to torsion – Solid Shaft – J = π R 4 / 2 Area.
ALOKRAJ. V - NA07B004. General  All deck machinery and construction equipment are to be supplied and installed to meet classification, intended operational.
The Waitt Institute CATALYST AUV Program. … Making a Hydroid REMUS 6000 AUV System Accessible to the Ocean Science Community An easily integrated and.
Sonar Chapter 9. History Sound Navigation And Ranging (SONAR) developed during WW II –Sound pulses emitted reflected off metal objects with characteristic.
1 Autonomously Controlled Vehicles with Collision Avoidance Mike Gregoire Rob Beauchamp Dan Holcomb Tim Brett.
Development of Laser Fuser Test Bed Project Number: P07501 Justin McMillan.
The research vessel JOHN H. MARTIN was donated to Moss Landing Marine Laboratories by Mr. Jeff Meyer. The 56-foot vessel was built in 1985 by Westport.
WISA Meeting Help Arrange a Speaker, Write Bio, Introduce
Fall Protection in the Roofing Industry
Copyright Coast Guard Auxiliary Association, Inc.
Boat Orientation Objectives: Identify parts of various boats List hull types and shapes List Vessel Classes Define Types of Motors Define Capacity Plate.
Final Presentation Crew: Mike Lanteigne Wallace Barkhouse Scott Donahoe Blair MacKay Captain: Dr. Jimmy Chuang April 4 th 2012.
Tom Kader Chief Electrical Inspector Spaces About Electrical Equipment Sufficient access and working space shall be provided and maintained about.
Dewatering Equipment.
New German Deep-Sea Research Vessel (replacement SONNE) scientific-technical requirements Klaus von Bröckel, ERVO, May 2009 one of many artists views !
Scissor Lift Safety Training Working Safely on Scissor Lifts 29 CFR OSHA Scaffolding Safety Requirements.
What is Oceanography?. Marine Science Or oceanography is the study of the oceans, how they are formed, its associated life forms, the coastal interactions,
Marine Autonomous and Robotic Systems Facility at NOC 20 th March David White 20 th March
Bertinoro Advanced Training T-RDI: Marine Measurements 1Mar2007.
Mid-Deployment Position NRL Source Array (and NRL hydrophone/cable) 8 July 2011 Sheave and block NRL source array Source cable to Winch.
Data Buoy Cooperation Panel Scientific and Technical Workshop Scripps Institution of Oceanography La Jolla, CA Recent Buoy Developments at NOAA/NOS/CO-OPS.
HOW DO WE STUDY THE SEAFLOOR?. 1. Line-sounding – starting around 85 B.C. lead weighted ropes were dropped over the side of the boat and the depth was.
Vehicle Characteristics/Pre-Checks/ Driving/Winching
OCEAN AGOR General Purpose Research Vessel Program
Autosub 7 m long x 0.9 m dia 2,700 kg in air Maximum Depth: 1600 m. Speed: 1 to 4 knots Endurance: Up to700 km depending on speed, hotel load etc. Large.
Supported access Stairways and Ladders
The Growth of Marine Labs Before the Challenger Expedition vessels only had room for few scientists. The rest of the scientists only got to see dead.
ALOHA-MARS Mooring Moorings called for in many OOI plans Features –Enables adaptive sampling –Distributes power, communications, time throughout the water.
Sling Load Capacity and Sling Angles
Thank You Sponsors. Thank You Sponsors Problem Statement Identification of Critical Subsystems Identification of Vehicle States Analysis of Vehicle States.
Garage Door Design Analysis
ALOKRAJ. V - NA07B004. General All deck machinery and construction equipment are to be supplied and installed to meet classification, intended operational.
1 Underway Reconnaissance Breakout FULL SPEED: Hull mounted: Hull mounted: 1- MBES m - w/ 0.5 degree resolution - bathy and backscatter m.
SIDE SCAN Theory and Operation
Standout Technical Designers MAE 416: ME Senior Design Sponsored by Cooper Hand Tools Brian SearsNate Ouellette Pooria Javidi Nathan Mize Chris EvansJustin.
OEAWG Workshop, October 23, 2007 Artist Rendering Capabilities of the NOAA Ship OKEANOS EXPLORER Craig Russell, NOAA Ocean Exploration and Research (ERT,
1 Underway Reconnaissance Breakout FULL SPEED: Hull mounted: Hull mounted: MBES m - w/ 0.5 degree resolution - bathy and backscatter m after.
Different cable reel has a different role. Hysteresis type cable reel working principle and scope The working principle of A. Power control system is.
Northern Central Gulf of Mexico Mississippi River plume East of Mississippi Delta Near Barrier Islands of Alabama, Mississippi General Experiment area.
Deck Equipment AGOR 27. Deck Crane: TK Deck aft Portable Crane: TK Deck fwd Per Design Specification (J-1) Cranes Shall be capable of:
C-shaped steel beam pulley cable pulley lifting and installation work status.
SIDE SCAN Theory and Operation
Trailers Trailer shall mean any vehicle, with or without motive power, designed for carrying persons or property and for being drawn by a motor vehicle.
Observing, Measuring and Sampling Ocean Floor Processes to 11,000 meters A Hybrid ROV The Future in the 4 th Dimension.
MANUFACTURING ENGINEERING DEPARTMENT
AGOR 27 Science Mission Equipment
VEX Lifts (Devices that extend upwards)
RESEARCH TRAINING VESSEL OF GDYNIA MARITIME UNIVERSITY
Hire Different Varieties of Lifting Gear in UK
VEX Lifts (Devices that extend upwards)
Work (variable distance)
Ifremer naval facilities
Chapter 11 Electrical Generators
Common Small Pedestal Motor and Bearing Requirements. Introduction
Ocean Instrumentation
F&T Inc. OVERHEAD CRANE SAFETY.
UNDERWATER CURRENTS OF THE COAST OF SAN DIEGO, CA
Winching Safety.
LIFT,ESCALATOR AND MOVING WALKS
Presentation transcript:

November 2013 Institution update RV ARMSTRONG, AGOR 27 November 2013 Institution update

Oceans Class Characteristics RV ARMSTRONG, AGOR 27 Oceans Class Characteristics Length OVA = 238’-0” Beam = 50’-0” Design Speed = 12.0 kts Endurance = 40 days Crew Size = 20 Science Party Size = 24

RV ARMSTRONG AGOR 27 Delivery date: October 2014 Science verification cruise(s) ~January 2015 – ~ April 2015 Science Mission Equipment Lab Layouts Deck handling systems (winches and crane) A Frame Deck layouts

AGOR 27 Science Equipment List Funded In Vessel Construction Budget Kongsberg EM122 Multibeam SeaBird TSG Knudsen 3260 Sub Bottom Profiler Massa TR109 3.5 kHz transducer Array 12 kHz transducer Array POS/MV Precision GPS Satellite Communication System 38 kHz RDI Ocean Surveyor ADCP Acoustic Monitoring System Science Seawater Distribution System

AGOR 27 Science Equipment List DURIP (Navy) Funded Equipment Kongsberg EM710 Multibeam Kongsberg Sonar Synchronization System 75 kHz RDI Ocean Surveyor ADCP 300 kHz RDI Workhorse Mariner ADCP Kongsberg HiPAP Gantry with Sonardyne USBL Kongsberg EK60 Mid-Water Echo Sounder RADAR Wave Height Measurement System OTHER (NSF?) Funded Equipment AUV High Bandwidth Communications Plotters

19 inch transducer wells avail for science Transducer Room Layout 75 kHz ADCP 19 inch transducer wells avail for science 38 kHz ADCP EM122 EM122 USBL stem EM710 Knudsen 3260 EM710 300 kHz ADCP 12 kHz Transducer

Complete Lab Layout

Wet Lab & Staging Bay

Main Lab

Computer Lab

Science Storeroom

Deck Equipment AGOR 27

Hydrographic Winches (2) Markey CAST -6-125 Per Design Specification (J-1) Stern Frame Shall be capable of: Electric Motor Driven Rated at 24,000 Lbs A pushbutton operator interface enables the level wind to electronically adjust to any diameter wire, cable or soft-line The output sheave of the fairlead is mounted in a flagging block which sweeps 360 degrees.  This unique design  eliminates the need for deck hands to carry and rig intermediate blocks or  fairleads, resulting in less time spent rigging, more time for sampling,  which reduces overall operational time and expense. Capable of a line pull test of at least 5,000 pounds with a full drum and at least 11,100 pounds with a bare drum Capable of variable speeds up to at least 1.5 meters/sec under full load Capable of handling cable sizes and lengths up to and including 10,000 meters of 0.393 inch EOM cable. One winch provided with lebus shells sized for .322” EM cable the other with 3/8”, 3x19 torque balanced wire rope

Traction Winch Markey DETW-9-11 Per Design Specification (J-1) Traction Winch Shall be capable of: 26,500 Lbs @ 0-205 Ft/Min Electric Motor Driven AC Variable Frequency Drive System and electric motors giving precise control. Lebus-grooved  drum shells. Full load line pull of at least 25,000 pounds and continuous speed control to 0.1 meters/min throughout the speed range Handling 12,000 meters of 9/16” 3x19 wire and 10,000 meters of 0.680 EM cable Winch and sheave shall be capable of handling 0.681 inch fiber optic cable Cooling of stowage winch drums to reduce heat build up when transmitting high power levels through the cable to ROV’s

Deck Working Space Aft clear deck space – 1873 ft2 Total clear deck space – 2557 ft2

Stern Frame Allied A-30 (243 x 324”) Per Design Specification (J-1) Stern Frame Shall be capable of: Dynamic Safe Working Load of 30,000 Lbs through full range of motions. Capable of withstanding the 46 CFR 189.35 breaking strength requirements for a wire with a breaking strength of 120,000 in fully extended position Rotation Period of no more than 35 Seconds from stop to stop Height from block attachment points to the deck of 27 feet and a clear width between the legs of at least 15 feet above the deck Minimum 12 foot inboard and outboard reach Maintenance position rotates top of frame within a safe working height above the main deck (4’9”) to change blocks and cable fairleads.

Deck Crane: TK70-70. 01 Deck aft Per Design Specification (J-1) Cranes Shall be capable of: Loading and offloading vans and equipment weighing up to 20, 000 pounds 20’ beyond stbd side pier side. Performing towing and coring operations with wire (including fiber optic) from the trawl/tow traction winch. Deploying buoys and other heavy equipment weighing up to 10K lbs. up to 12’ over the Stbd. Side in sea state 4 Provided with a load hoist winch capable of providing hook drop at least 50’ below the base of the crane and at least 40’/min hook drop test Hook speed of at least 40ft/min with a bare drum and at least 60ft/min with a full drum

Main Deck (working deck) RV ARMSTRONG, AGOR 27 Main Deck (working deck)

Working Deck Examples with 5 lab vans, portable winch and CTD operation

RV Armstrong with ROV Jason example layout

RV ARMSTRONG, AGOR 27 Summer 2013

RV ARMSTRONG, fall 2013

RV Armstrong starboard side fall 2013