Reference: Figure 6.2. PMBOK® Guide, 5 h Ed Reference: Figure 6.2. PMBOK® Guide, 5 h Ed.

Slides:



Advertisements
Similar presentations
Work Breakdown Structures
Advertisements

Project Management 6e..
3 - 1 Course Title: Production and Operations Management Course Code: MGT 362 Course Book: Operations Management 10 th Edition. By Jay Heizer & Barry Render.
WEEK 4 Introduction to Project Management 1. Communication Plan Objectives Objective is to determine: ◦ Who needs to know what? ◦ How will they be told?
PMP/CAPM Prep Workshop Time
Chapter 6: Project Time Management
Management & Development of Complex Projects Course Code - 706
Managing Project Scheduling. What is Project Scheduling? The process of: – defining project activities – determining their sequence – estimating their.
Project Time Management
Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
Copyright 2008 Introduction to Project Management, Second Edition 1  Project time management involves the processes required to ensure timely completion.
Project Time Management
Importance of Project Schedules
Project Time Management
Estimating Project Times and Costs CHAPTER FIVE Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 6 Project Time Management.
Quiz#1 Chapter 5: Estimating Project Times and Cost
HIT241 - TIME MANAGEMENT Introduction
Software Project Management Task Sequencing Activity Sequencing Concepts PERT charts Critical Path Analysis.
Time Management Week 7 - Learning Objectives You should be able to: n List and describe the processes, activities, inputs, and outputs in time management.
Chapter 6: Project Time Management Information Technology Project Management, Fifth Edition Note: some slides have been removed from the author’s original.
Scheduling Sequence & Time.
Chapter 6: Project Time Management
Lecture 5 Title: Project Time Management By: Mr Hashem Alaidaros MIS 434.
POST GRADUATE PROGRAM OF INFORMATION TECHNOLOGY
~ pertemuan 6 ~ Oleh: Ir. Abdul Hayat, MTI 03-Apr-2009 [Abdul Hayat, Project Time Management, Semester Genap 2008/2009] 1 PROJECT TIME MANAGEMENT.
Quick Recap. Work Breakdown Structure (WBS): Set of activities to do (“use cases”) Formats of WBS Risk associated WBS Approaches for WBS Dependency Graph:
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
Lecture 7. Review of Lecture 6 Project Scheduling: The process of defining project activities, determining their sequence, estimating their duration Scheduling.
WEEK 4 Introduction to Project Management. Agenda Phase 2: Planning ◦ Communication Plan ◦ Scheduling Preparation  Build an AON Diagram  Determine Critical.
Managing Project Resources. Project Resources Human Resources Project stakeholders: – Customers – Project team members – Support staff Systems analyst.
Lecture 6. Review of Lecture 5 Company strategic planning: mission and objective statements and competitive strategy. Planning Methods: Top-down, Bottom-up.
Chapter 6: Project Time Management Information Technology Project Management,
Advanced Project Management Project Time Management Ghazala Amin.
Collecting requirements – Different methods Defining scope – Estimates for all resources Creating the WBS – Different approaches Verifying scope – Formal.
Estimating Project Times and Costs CHAPTER FIVE PowerPoint Presentation by Charlie Cook Copyright © 2014 McGraw-Hill Education. All Rights Reserved.
Estimating Project Times and Costs CHAPTER FIVE Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Estimating Project Time and Cost
Project Time Management
Project Time Management Ashima Wadhwa. Schedule Development – Determining start and finish dates for project activities – Without realistic dates, project.
Project Time Management
 Project Time Management includes the processes required to accomplish timely completion of the project  Part of Triple Constraints  Managers often.
Project Management Processes for a Project Chapter 3 PMBOK® Fourth Edition.
Reference: Figure 6.2. PMBOK® Guide, 5 h Ed Reference: Figure 6.2. PMBOK® Guide, 5 h Ed.
SOFTWARE PROJECT MANAGEMENT
Chapter 4 Note: See the text itself for full citations.
Information Technology Project Management, Sixth Edition Note: See the text itself for full citations.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
Reference: Figure 6.2. PMBOK® Guide, 5 h Ed Reference: Figure 6.2. PMBOK® Guide, 5 h Ed.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
BSBPMG503A Manage Project Time Manage Project Time Project Time Processes Part 2 Diploma of Project Management Qualification Code BSB51507 Unit Code.
Project Time Management Based on PMBOK 5 th Edition Abdelrahman Sheta, PMP,ITIL 1PMP - Project Time Managementfacebook.com/Sheta.Page.
Information Technology Project Management, Seventh Edition.
© 2008 Prentice Hall6-1 Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and.
Project Management 6e..
Project Management 6e..
Project Management MGT 30725
Where We Are Now. Where We Are Now Estimating Projects Estimating Types of Estimates The process of forecasting or approximating the time and cost.
Plan Schedule Management
Chapter 6: Project Time Management
CHAPTER 6 PROJECT TIME MANAGEMENT
Project Time Management
Project Time Management
Project Time Management
Project Time Management
Importance of Project Schedules
Project Time Management
CHAPTER 6 PROJECT TIME MANAGEMENT
Where We Are Now. Where We Are Now Estimating Projects Estimating Types of Estimates The process of forecasting or approximating the time and cost.
Presentation transcript:

Reference: Figure 6.2. PMBOK® Guide, 5 h Ed Reference: Figure 6.2. PMBOK® Guide, 5 h Ed

 Plan Schedule Management – The process of establishing the policies, procedures, and documentation for planning, developing, managing, executing, and controlling the project schedule.  Define Activities – The process of identifying and documenting the specific actions to be performed to produce the project deliverables.  Sequence Activities – The process of identifying and documenting relationships among the project activities.

Schedule Management Plan

6 Activity Lists and Attributes An activity list is a tabulation of activities to be included on a project schedule. The list should include: – The activity name – An activity identifier or number – A brief description of the activity Activity attributes provide more information about each activity, such as predecessors, successors, logical relationships, leads and lags, resource requirements, constraints, imposed dates, and assumptions related to the activity.

Milestones A Milestone is a significant event that normally has no duration. It often takes several activities and a lot of work to complete a milestone. Milestones are useful tools for setting schedule goals and monitoring progress. Examples include completion and customer sign- off on key documents and completion of specific products High level milestones are given in project charter

Sequence Activities is the Process of identifying and documenting relationships among the project activities. The key benefit of this process is that the logical sequence of work to obtain the greatest efficiency given all project constraints.

After defining project activities, the next step is activity sequencing – Involves reviewing the activity list and attributes, project scope statement, milestone list and approved change requests to determine the relationships between activities A dependency or relationship is the sequencing of project activities or tasks You must determine dependencies in order to use critical path analysis 9

1.Project Schedule Network Diagrams 2.Project Document Updates ____________ 1.Precedence Diagramming Method (PDM) 2.Dependency Determination 3.Leads and Lags ____________ Inputs 1 Tools and Techniques 2 Outputs 3 1.Schedule Management Plan 2.Activity List 3.Activity Attributes 4.Milestone List 5.Project Scope Statement 6.Enterprise Environmental Factors 7.Organizational Process Assets ____________

 Precedence Diagramming Method (PDM)  Dependency Determination  Leads and Lags

Precedence Diagramming Method (PDM) More popular than ADM method and used by project management software Activities are represented by boxes Arrows show relationships between activities Better at showing different types of dependencies 21

Arrow Diagramming Method (ADM) Also called activity-on-arrow (AOA) network diagrams Activities are represented by arrows Nodes or circles are the starting and ending points of activities Can only show finish-to-start dependencies Can omit activities that have no dependencies 22 Project Time Management

A Comparison of AON and AOA Network Conventions Activity onActivityActivity on Node (AON)MeaningArrow (AOA) B and C cannot begin until A is completed. D cannot begin until both B and C are completed. A dummy activity is again introduced in AOA. A C DB AB C D Dummy activity

Finish-to-Start – Activity A must finish before Activity B can start AB Start-to-Start – Activity A must start before Activity B can start A B

Finish-to-Finish – Activity A must finish before Activity B can finish A B Start-to-Finish – Activity A must start before Activity B can finish A B

AON Example ActivityDescription Immediate Predecessors A Build internal components — B Modify roof and floor — C Construct collection stack A D Pour concrete and install frame A, B E Build high-temperature burner C F Install pollution control system C G Install air pollution device D, E H Inspect and test F, G Table 3.1

29 Activities are represented by boxes. Arrows show relationships between activities. Better at showing different types of dependencies.

AON Network A Start B Start Activity Activity A (Build Internal Components) Activity B (Modify Roof and Floor)

C D A Start B Activity A Precedes Activity C Activities A and B Precede Activity D

G E F H C A Start DB Arrows Show Precedence Relationships

Three Types of Dependencies Mandatory dependencies: inherent in the nature of the work being performed on a project, sometimes referred to as hard logic Discretionary dependencies: defined by the project team; sometimes referred to as soft logic and should be used with care since they may limit later scheduling options – Don’t start detailed design work until users sign-off on all the analysis – good practice but can delay project External dependencies: involve relationships between project and non-project activities – Delivery of new hardware; if delayed can impact project schedule 34

Leads and Lags

 Project Schedule Network Diagram  Project Documents Updates  Activity List  Activity Attributes  Milestone List  Risk Register  Enterprise Environmental Factors  Organizational Process Assets

Network Diagrams Network diagrams are the preferred technique for showing activity sequencing A network diagram is a schematic display of the logical relationships among, or sequencing of, project activities Two main formats are the arrow and precedence diagramming methods 43

Steps in Network Diagraming Steps in Network Diagraming 1.Specify the individual activities. 2.Determine the sequence of those activities. 3.Draw a network diagram. 4.Estimate the completion time for each activity. 5.Identify the critical path (longest path through the network) Network Diagrams

Develop Network Diagram? ActivityDescriptionTime (weeks) ABuild internal components2 BModify roof and floor3 CConstruct structure2 DPour concrete and install frame4 EBuild high-temperature burner4 FInstall pollution control system 3 GInstall air pollution device5 HInspect and test2 Total Time (weeks)25

ActivityDescription Immediate Predecessors A Build internal components — B Modify roof and floor — C Construct collection stack A D Pour concrete and install frame A, B E Build high-temperature burner C F Install pollution control system C G Install air pollution device D, E H Inspect and test F, G

Project Schedule Network Diagram

Assignment

Path Convergence In an effort to consolidate efforts and eliminate redundancies, it is often the case that it makes sense to merge, combine a series or set of items. Path convergence refers to the instance in which the project management team and or project management team leader represents the act of actually converging and merging and or joining a number of parallel schedule network paths into the same point, or node, on the pre- existing project schedule network diagram.Path convergence refers to the instance in which the project management team and or project management team leader represents the act of actually converging and merging and or joining a number of parallel schedule network paths into the same point, or node, on the pre- existing project schedule network diagram. Path convergence involves the act of characterizing a preexisting schedule activity into with more than one single predecessor activity. Path convergence is quite common to find as a project unfolds and it can cause for confusion if not handled carefully by the project team.Path convergence involves the act of characterizing a preexisting schedule activity into with more than one single predecessor activity. Path convergence is quite common to find as a project unfolds and it can cause for confusion if not handled carefully by the project team.

Path Divergence Path divergence plays a significant and important role in the life of a project and the attempts by the project management team.Path divergence plays a significant and important role in the life of a project and the attempts by the project management team. instance in which the project management team and or project management team leader represents the act of actually extending or generating parallel schedule networkpaths from the same point, or node, on the pre-existing project schedule network diagram. Ultimately, when all is said and doneinstance in which the project management team and or project management team leader represents the act of actually extending or generating parallel schedule networkpaths from the same point, or node, on the pre-existing project schedule network diagram. Ultimately, when all is said and done path divergence when conducted by the project management team and the project management team leader involves the act of characterizing a preexisting schedule activity into with more than one single successor activity. Path convergence is quite common to find as a project unfolds and it can cause for confusion if not handled carefully by the project team.path divergence when conducted by the project management team and the project management team leader involves the act of characterizing a preexisting schedule activity into with more than one single successor activity. Path convergence is quite common to find as a project unfolds and it can cause for confusion if not handled carefully by the project team.

Estimate Activity resources is the Process of estimating the type and quantities of material, human resources, equipment, or supplies required to perform each activity. The key benefit of this process is that it identifies the type, quantity, and characteristics of resources required to complete the activity which allows more accurate cost and duration estimates.

Estimating – The process of forecasting or approximating the time and cost of completing project deliverables. – The task of balancing expectations of stakeholders and need for control while the project is implemented. Types of Estimates – Top-down (macro) estimates: analogy, group consensus, or mathematical relationships – Bottom-up (micro) estimates: estimates of elements of the work breakdown structure

Why Estimating Time and Cost Are Important To support good decisions. To schedule work. To determine how long the project should take and its cost. To determine whether the project is worth doing. To develop cash flow needs. To determine how well the project is progressing. To develop time-phased budgets and establish the project baseline.

Factors Influencing the Quality of Estimates Quality of Estimates Project Duration People Project Structure and Organization Padding Estimates Organization Culture Other (Nonproject) Factors Planning Level

Estimating Guidelines for Times, Costs and Resources 1.Have people familiar with the tasks make the estimate. 2.Use several people to make estimates. 3.Use consistent units in estimating task times. 4.Don’t make allowances for contingencies. 5.Adding a risk assessment helps avoid surprises to stakeholders. Before estimating activity durations, you must have a good idea of the quantity and type of resources that will be assigned to each activity  Consider important issues in estimating resources  How difficult will it be to do specific activities on this project?  What is the organization’s history in doing similar activities?  Are the required resources available or need to be acquired?

Top-Down versus Bottom-Up Estimating Top-Down Estimates Top-Down Estimates – Are usually are derived from someone who uses experience and/or information to determine the project duration and total cost. – Are made by top managers who have little knowledge of the processes used to complete the project. Bottom-Up Approach Bottom-Up Approach – Can serve as a check on cost elements in the WBS by rolling up the work packages and associated cost accounts to major deliverables at the work package level.

1.Activity Resource Requirements 2.Resource Breakdown Structure 3.Project Document Updates ____________ 1.Expert Judgment 2.Alternatives Analysis 3.Published Estimating Data 4.Bottom-up Estimating 5.Project Management Software ____________ 1.Schedule Management Plan 2.Activity List 3.Activity Attributes 4.Resource Calendars 5.Risk register 6.Activity Cost estimates 7.Enterprise Environmental Factors 8.Organizational Process Assets Inputs 1 Tools and Techniques 2 Outputs 3

 Schedule Management Plan  Activity List  Activity Attributes  Resource Calendars  Risk Register  Activity Cost Estimates  Enterprise Environmental Factors  Organizational Process Assets

 Expert Judgment  Alternatives Analysis  Published Estimating Data  Bottom-up Estimating  Project Management Software

 Activity Resource Requirements  Resource Breakdown Structure  Project Documents Updates

6.5 1.Activity Duration Estimates 2.Project Document Updates ____________ 1.Expert Judgment 2.Analogous Estimating 3.Parametric Estimating 4.Three-Point Estimates 5.Group Decision-Making Techniques 6.Reserve Analysis ____________ 1.Schedule Management Plan 2.Activity List 3.Activity Attributes 4.Activity Resource Requirements 5.Resource Calendars 6.Project Scope Statement 7.Risk Register 8.Resource Breakdown structure 9.Enterprise Environmental Factors 10.Organizational Process Assets ____________ Inputs 1 Tools and Techniques 2 Outputs 3

Schedule Management Plan Activity List Activity Attributes Activity Resource Requirements Resource Calendars Project Scope Statement Risk Register Resource Breakdown Structure Enterprise Environmental Factors Organizational Process Assets

Schedule Management Plan

Activity List

Activity Attributes

Activity Resource Requirements

Resource Calendars

Project Scope Statement

Risk Register

Resource Breakdown Structure

Enterprise Environmental Factors

Organizational Process Assets

Expert Judgment Analogous Estimating Parametric Estimating Three-Point Estimates Group Decision-Making Techniques Reserve Analysis

Expert Judgment

Analogous Estimating

Parametric Estimating

Three-Point Estimates

Most likely. The duration of the schedule activity, given the resources likely to be assigned, their productivity, realistic expectations of availability for the schedule activity, dependencies on other participants, and interruptions. Optimistic. The activity duration is based on a best-case scenario of what is described in the most likely estimate. Pessimistic. The activity duration is based on a worst-case scenario of what is described in the most likely estimate. Three-Point Estimates

Group Decision-Making Techniques

Reserve Analysis

Activity Duration Estimates Project Documents Updates

Activity duration estimates are quantitative assessments of the likely number of work periods that will be required to complete a schedule activity. Activity duration estimates include some indication of the range of possible results. For example: 2 weeks ± 2 days to indicate that the schedule activity will take at least eight days and no more than twelve (assuming a five-day workweek). 15 percent probability of exceeding three weeks to indicate a high probability—85 percent—that the schedule activity will take three weeks or less. Activity Duration Estimates

Project Documents Updates