OPEN ACCESS IN INTER-STATE TRANSMISSION. DEFINITION OF “ OPEN ACCESS ” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission.
Queries raised by Director (Tariff) on ARR and Tariff Application of NESCO for FY on
LEVY IMPLEMENTATION 27 JANUARY TO 14 FEBRUARY 2014.
Energy Storage Definitions/Definitions ETWG 18 Feb 2013.
1 Presentation on Indian Power Sector : Key Issues By R.V. SHAHI Secretary (Power), Government of India November 16, 2006 Power Ministers’ Conference on.
Mexico’s initiatives with respect to Renewable Energies World Bank February 2012 Washington D.C. Alejandro Peraza-García Director General of Electricity.
Maharashtra State Load Despatch Centre Role of SLDC in RRF Implementation & Issues By MSLDC.
THE STATUS OF POWER SECTOR REGULATION IN NEPAL THE ELECTRICITY TARIFF FIXATION COMMISSION FORMED IN 1994 IN ACCORDANCE WITH ELECTRICITY ACT OF 1993.
REC Mechanism: Opportunity for Investment in Wind Power Dr. Govind Bhagwatikar Siemens Limited: Wind Power Renewable Energy 2012 Wind Conference Pune,
It “Pays” to be Environment Friendly Renewable Energy Certificates: IPP Perspective.
Congestion When transmission demand >capability When Voltage levels in a corridor beyond operable limits When Real time line flow exceeds the TTC Most.
RRF Mechanism ENERGY ACCOUNTING Western Regional Power Committee
Settlement system of Bilateral transactions under Open Access
INTRA STATE ABT Necessity Issues Implementation. Some of the features of New National Electricity Policy – Feb.’05 Appropriate Commissions to undertake.
Wind Power in Ireland: Treatment of wind in the Single Electricity Market APEx Conference, Paris 16 th October 2007.
National Clearing Company of Pakistan Limited 1. Back Ground The Securities and Exchange Commission of Pakistan (“SECP”) formed Consultative Group on.
1 THE INDIA ELECTRICITY MARKET TIME LINE REAL TIME 15 MT BLOCKS LONG TERM LOAD FORECAST FUND MOBILISATION 10-5 YEARS POWER PURCHASE AGREEMENTS CAPACITY.
IEGC PROVOSIONS FOR RENEWABLE GENERATION SCHEDULING & UI SETTLEMENT 1.
1. 2 ENERGY MANAGEMENT SYSTEM AN OVERVIEW AN OVERVIEW.
Billing, Collection and Disbursement Procedures
Options for Renewable/ Captive/ IPPs etc. EXTRACTS FROM ELECTRICITY ACT 2003 Para 3(1) NATIONAL ELECTRICITY POLICY AND PLAN: The Central Government shall,
REVISION OF SCHEDULES/REQUISITIONS A)OUTAGE OF GENERATING UNIT B) REVISED DECLARATION OF AVAILABILITY BY CGS C) OUTAGE OF A TRANSMISSION ELEMENT D)UNFORESEEN.
Basic Concept -Sole proprietorship Business- Forms of Business: -Partnership -Joint Hindu Family Business -Cooperative Society -Company.
Outline  Chronology  Conceptual framework  Salient Features of REC Mechanism  Role of Central Agency  REC Procedures  Current Status.
With amendments w.e.f  (1) In these regulations, unless the context otherwise requires,-  (a) ‘Act’ means the Electricity Act, 2003 (36.
Section 7.5 –4 – ii of Indian Electricity Grid code (IEGC): “The summation of station-wise ex-power plant drawal schedules for all ISGS after deducting.
Ainārs Meņģelsons Public Utilities Commission Latvia 11th Baltic Energy Regional Initiative October 1, 2010 Jūrmala, Latvia ELECTRICITY REGIONAL INITIATIVE.
Presentation at DERC Public Hearing in the matter of ARR for F.Y filed by Distribution Companies in Delhi by N. Ponrathnam 6/2/20161.
Explanation of Latest Changes to Draft Reserves Schedule, Service Schedule D Contact: Arnie Podgorsky Mike Thompson Wright & Talisman PC
Power Trading By P.S.Bami President – India Energy Forum & Former Chairman & Managing Director, NTPC 1.
The Energy Policy Act of 2005 and Its Revisions to PURPA November 11, 2005 Grace D. Soderberg Assistant General Counsel National Association of Regulatory.
Open Access for Renewables New initiatives. Scheduling and OA of RE Open Access through LTA/ MTOA/ STOA route envisaged Applicable to Wind and Solar without.
1 A Presentation on Regulatory Regime for Renewable Energy Projects in Andhra Pradesh.
SCHEDULING METHODOLOGY The station-wise (Ex-bus) capability would be submitted by the ISGSs in the specified format. ISGSs would declare the capability.
Workshop on State-Level Electricity Reforms: Firm Choices, Emerging Generation Markets and Externalities “Open Access: Experiences” ALOK ROY General Manager,
OPEN ACCESS IN INTER STATE TRANSMISSION. Gazette Notification of Open Access in inter state transmission systemGazette Notification of Open Access in.
1 INTRA – STATE AVAILABILITY BASED TARIFF (ABT) A Presentation on INTRA – STATE AVAILABILITY BASED TARIFF (ABT)
Power Trading Corporation Of India Ltd. Mahendra Kumar Director, Power Trading Corporation of India Ltd. Power Trade Perspective.
1 “RENEWABLE PURCHASE OBLIGATION (RPO), MAHARASHTRA” MAHARASHTRA ENERGY DEVELOPMENT AGENCY (MEDA) Presented by:- Dr. J. V. Torane General Manager (REC,
PROPOSED AMENDMENT TO EA,2003 OCTOBER,2015 by RAKESH NATH.
Ainārs Meņģelsons Public Utilities Commission Latvia 10th Baltic ERI June 4, 2010 Kuressare, Estonia IMPLEMENTATION OF 3-rd EC PACKAGE IN LATVIA.
G 200 L 200 ISO NEW ENGLAND T H E P E O P L E B E H I N D N E W E N G L A N D ’ S P O W E R. Southwest Connecticut RFP Markets Committee November 14, 2003.
AVAILABILITY BASED TARIFF AND SCHEDULING MECHANISM.
Transmission Tariff V.Balaji Chief Manager SRLDC.
INDIAN TAKEOVERS Meaning Of Acqusition: When an “acquirer” takes over the control of the “target company”, it is termed as takeover. When an acquirer.
Open Access In Interstate Transmission system Principal Regulation 2008( 25 th Jan’2008) Amendment Regulation 2009(20 th May’2009) Order-Removal of difficulties,(28.
Renewable Energy Certificates in Himachal Pradesh Role of HP regulator and Government By : Navneet Khokhar
NORTHERN REGIONAL LOAD DISPATCH CENTER 1.Revision Of Ceiling Of UI Rates and slope. 2.Revision Of Schedule after a Transmission Constraint is over. 4.RLDC’s.
OPEN ACCESS EXPERIANCES AND WAY-AHEAD V K Agrawal, General Manager, SRLDC WORKSHOP ON GRID SECURITY AND MANAGEMENT 28 th and 29 th April, 2008.
MERC (Net Metering for Rooftop Solar Systems) Regulations, 2015 One Day Workshop on Grid Connected Solar Roof-top Projects in Maharashtra by MEDA.
MERC (N ET METERING FOR R OOF - TOP S OLAR P HOTO V OLTAIC S YSTEMS ) R EGULATIONS, 2015 Commercial Section.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4154/EN Supply Centrifugal Water Pumps B. Jenssen
Workshop on Open Access in Maharashtra Nagpur 14 th May 2016 For Public Use.
Guidelines on Transmission Tarification ERGEG Public Hearing 30. June 2005.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
Final Rule on OTI Licenses - Docket NCBFAA Conference, Tucson AZ – April 19, 2016.
OPEN ACCESS IN INTER-STATE TRANSMISSION. INTRODUCTION Open Access is necessary for utilization of short time surpluses. Open Access will also create options.
Margin Trading System Based on Securities (Leveraged Markets and Pledging) Rules, 2011 and Concept Paper.
Open Access Power Purchase
Operationalizing One Nation One Grid
Returns under GST Manoj Malpani CA, CMA.
Open Access.
Open Access.
Margin Financing System (MFS)
Scheduling of Collective Transactions Through Power Exchange
Overview of the Electricity Regulation Bill
E-bidding for Short Term Open Access by – S
Financial and Administrative presentation on PARTICULATES project
Presentation transcript:

Workshop on "Open Access through Power Exchange in Maharashtra“ Venue : Conference Hall, Vidarbha Industrial Association, Nagpur. Date: Organised jointly by Indian Energy Exchange Limited & Vidarbha Industrial Association

Welcome Presentation on MERC’s Distribution Open Access Regulations Dt At Nagpur

Presentation By: T. N. Agrawal & Co. Accredited Energy Auditors & Consulting Engineers, Nashik.

Brief about past Dist. OA Regulations Dist. OA reg.-2005: Allowed OA through power exchange till Dist. Open access Regulation published in June Week ahead - though power Exchange permitted. No scope for day ahead- power Exchange. Not a single consumer could avail OA through power exchange due to non-availability of week ahead market with power exchanges. Power trading in Maharashtra through power exchange was discontinued completely from onwards. Hence, some of the Industries initiated action for amendment in OA regulations 2014.

Who initiated action for change in Dist. OA reg Industries initiated action for amendment in OA Reg UP Twiga Fiberglass Ltd., Ambernath 2. Videocon Industries Ltd, Aurangabad 3. Piaggio Vehicles Pvt. Ltd., Baramati 4. Jindal Poly Films Ltd., Nasik 5. Nagreeka Exports Ltd., Kolhapur 6. Jawahar Shetkari Sahakari Soot Girni Ltd., Dhule 7. KTST Engineers Pvt. Ltd. Nashik. & supported by Indian Energy Exchange Limited.

21 st May-2015 at World Trade Centre, Mumbai

Brief about past action by Group of Industries 1. Letter to MERC sent by the Industries in April 2015 for amendment of OA Reg Highlighted OA regulation deficiencies during public hearing for fixation of tariff conducted by MERC at Vashi (17 th March-15), Nashik (1 st April-15), Aurangabad (6 th April- 15). 3. Group met with Chairperson, MERC on 21 st May-15 & discussed difficulties of trading through energy exchange. The MERC advised to submit data of other states on day ahead transactions. 4. All necessary data as provided by IEX submitted with joint signature of Industries to MERC on 10 th June MERC published new draft distribution open access regulations-2015 on Meeting for comments on draft OA regulation-2015 held at Nasik on and submitted comments to MERC on

Distribution Open access Regulations-2016.

Imp. Definitions-1

Imp. Definitions-2

Imp. Definitions-3

Salient Features of OA Reg ): Eligibility Criteria for OA: Retained same as 1.0 MW. 1. Source of OA: Multiple OA sources now allowed.

Section 3.1 of OA Reg Maximum Demand of OA consumer in each financial year Should be =/> 70% of the threshold level at which he has become eligible for OA. If the consumers fails in achieving MD in 3 consecutive months, the Distribution Licensee shall be entitled to levy a penalty equal to 2 x wheeling charges for the financial year or part thereof for which he had failed to achieve such MD & initiate action for reassessment / reduction of CD.

Section 4.0: Processing of application for Dist. O.A. Application to be made with Nodal Agency as per format provided Annexure-I The distribution co. to issue procedure within 30 days on issue of regulations. In case procedure is not issued, the old procedure to folllow to commence open access.

4.2 Revision of Contract demand

Reduction of CD Reduction of CD in case of partial open access consumers. No separate section appears in OA regulations for CD reduction. However as per defn. of billing demand, CD needs to be reduced. MSEDCL to declare about CD reduction in the procedure to be laid down. Advantage : Lesser demand charges payable to consumer. Disadvantage: Risk of Temp. tariff imposition exists.

7.2 Duration of Open Access

Application submission time for intra-state open access (within MH.), section-9, 10 & 11 Application time for MTOA: The Application to be made between 3 to 12 months prior. Earlier it was 5 to 12 months period. Application time for STOA: The Application can be made 4 months advance, but not later than 10 th day of the preceding month.

Inter-state open access (Out of MH): OA reg. Section 8.3 reads as:

Table of OA reg. section 8.3 for Short term OA through power exchange

11.9: Renewal of STOA Upon expiry of the period of Short-term Open Access, the Consumer, Generating Station or Licensee, as the case may be, shall not be entitled to any priority for renewal of the term.

13. Allotment Priorities In case of STOA & MSEDCL anticipate congestion in network, wheeling chargers shall be decided by bidding process.

29. Curtailment Priority Because of grid problem or any other issue

Over-drawal: Over-drawal by an Open Access Consumer shall be settled at the higher of the following: (i) the System Marginal Price (‘SMP’) plus other incidental charges (Net Unscheduled Interchange (‘UI’) charges, additional UI charges) or any other intra-State Availability-based Tariff (‘ABT’) settlement charges as identified under the mechanism operating in Maharashtra from time to time or, (ii) the Energy charge or Variable Charge of temporary Tariff category, whichever is applicable, as determined by the Commission in respect of the Distribution Licensee.

Under-drawal: In the event of under-drawal, the Open Access Consumer shall not be paid any charges by the Distribution Licensee:

Over-drawal/ Under-drawal of Power 1010 Overdrawal of power To be charged by temp. tariff to consumer No change 1 Under drawal Units goes as waste, no compensation payable by MSEDCL to the consumer No change

20. Banking of Renewable Energy generation Regulation 19.3 (over inj. & under-inj.) shall not be applicable in case an Open Access consumer obtains supply from a Renewable Energy Generating Station identified as ‘non firm power’ The surplus energy from a ‘non-firm’ Renewable Energy Generating Station after setoff shall be banked with the distribution licensee The banking year shall be the financial year from April to March.

20. Banking of Renewable Energy generation, contd Banking of energy shall be permitted during all 12 months of the year: Provided that the credit for banked energy shall not be permitted during the months of April, May, October & November. Energy banked during peak TOD slots may also be drawn during off-peak TOD slots, but the energy banked during off-peak TOD slots may not be drawn during peak TOD slots.

20. Banking of Renewable Energy generation, contd Banking charges shall be adjusted in 2% of the energy delivered at the point of drawal The unutilised banked energy at the end of the financial year limited to 10% of actual generation shall be purchased by the Distribution Licensee at its Pooled Cost of Power Purchase.

Power to remove Difficulties in OA Reg.2016.

MERC’s RPO Regulations, 2016 Now the consumer having contract demand < 5 MW is not required to fulfill RPO obligation for the period from to (4 years).