National Aeronautics & Space Administration European Space Agency & 1 Modulation and Coding: Draft IOAG Resolutions to CCSDS September 9, 2008 Les Deutsch.

Slides:



Advertisements
Similar presentations
A I R T R A F F I C O R G A N I Z A T I O N Future Communications Study Technology Assessment Team: Suggested Phase III Activities Presented at ICAO ACP.
Advertisements

DIGIDOC A web based tool to Manage Documents. System Overview DigiDoc is a web-based customizable, integrated solution for Business Process Management.
HR Manager – HR Business Partners Role Description
Data Rate Nomenclature We should agree upon a common scheme for describing the various data rates in a system that works for optical communication – In.
P1 Chairman Report to the CCSDS Management Council June 2001, Oxford, UK.
10-Dec-2012-cesg-1 SLS-OPT: Optical Communications Working Group (1 of 6) Problem and Issues: None. However, schedule for standards publication is very.
Common Coding and Synchronization Layer: Next Steps NASA Optical Communications Working Group 17 April /9/20151.
1 08 January 2015 Stephen Horan Cube Quest Kick-off: Communications Rules PI for Avionics Space Technology Mission Directorate.
1 October 2009 Cross Support Transfer Services (CSTS) Future Services as of Spring 2014.
Mars BOF Meeting Report Colorado January 2007 Chris Taylor.
Self Declaration Protocol EPA Regions 9 & 10 and The Federal Network for Sustainability 2005.
The SWHISA approach to extension:. The SWHISA approach extension:  participatory, farmer led,  open-ended and interactive relationship among farm families,
OSIAM4HE Proposed org structure Authored by the strategy and organization team.
2004 International Telemetering Conference20 October CCSDS FILE DELIVERY PROTOCOL INTER-IMPLEMENTATION TESTING FINAL REPORT TESTING OF A DTN PROTOCOL.
CHAPTER 5 Infrastructure Components PART I. 2 ESGD5125 SEM II 2009/2010 Dr. Samy Abu Naser 2 Learning Objectives: To discuss: The need for SQA procedures.
Sep 2003 CCSDS Navigation WG Progress Report MOIMS Meeting Oct 2003 CSC, Maryland, USA Felipe Flores-Amaya CCSDS Navigation WG.
1 CROSS SUPPORT SERVICE ARCHITECTURE Takahiro Yamada (JAXA/ISAS) CCSDS Meeting, Heppenheim, Germany 2 October 2007.
10-Dec-2012-cesg-1 SLS-OPT: Optical Communications Working Group Problem and Issues: None. However, schedule for standards publication is very aggressive.
SIS_DTN 1 SIS-DTN Forward Planning October 2013 San Antonio Fall 2013.
Glenn Research Center Networks & Architectures Branch Communications Technology IETF73 - IRTF DTNRG Meeting November Space-based DTN Low Earth Orbit.
CSSM Meeting Summary CCSDS CSSM Technical Meetings London, UK 10 – 14 November 2014.
2010 Fall CCSDS meeting SMWG UK ) 1 Prototype Test Coordination for the SCCS Service Management (B-1) 26th October, 2010 JAXA ASAMA
1 Space Communications Cross Support Architecture WG: Charter and Work Plan October 2010 London, UK Takahiro Yamada, JAXA/ISAS.
100% of B-TOS architectures have cost increase under restrictive launch policy for a minimum cost decision maker Space Systems, Policy, and Architecture.
Cesg-1 SLS REPORT 7 May 2010 Jean-Luc Gerner (AD) Gilles Moury (DAD) SPACE LINK SERVICES (SLS) AREA SLP and NGU sections Only.
IOAG-12 (SLE) Cross Support Service Catalog Wolfgang Hell, ESA 10 SEPTEMBER 2008 OBERPFAFFENHOFEN, GERMANY 1 INTERAGENCY OPERATIONS ADVISORY GROUP.
How would optics fit in CCSDS Stack? G.P. Calzolari (SLS Area Director) CCSDS Spring 2012 Meetings 16 April Which Cross Support Services should be picked.
Next Generation Space Link Protocol – Raison d’etre Greg Kazz Ed Greenberg SLS-SLP WG Fall 2013 CCSDS Meeting - San Antonio, TX, USA.
V. Tsaoussidis, DUTH – Greece
Common Terminology Summary
State and Regional Approaches to Improving Access to Services for Children and Youths with Epilepsy Technical Assistance Conference Call Sadie Silcott,
CCSDS Security WG meeting October 2008, hosted by DLR at DIN premises (Berlin) 1 Data Link Security BOF An ESA contribution on Lessons Learned and Issues/Questions.
1 ROAD MAP OF THE CCSDS ARCHITECTURE WORKING GROUP (AWG) Draft, Issue March 2003 Takahiro Yamada, Chair, AWG.
Panel P1J: Navigation Data May 2001 CCSDS P1J Status Report P1 Plenary Meeting May 23, 2001 TSG Meeting May 24-25, 2001 Pasadena, California, USA Felipe.
1 Jet Propulsion Laboratory California Institute of Technology High Photon Efficiency Physical Layer – Initial Recommendations July 15, 2015 The research.
NGU Proposed revision of recommendation CCSDS (401-B-20) on TC bit rate NGU WG Fall CCSDS Meeting - London UK - Oct 25, 2010.
Ajh January 2007 CCSDS “Books” Adrian J. Hooke CMC Meeting, Colorado Springs 26 January 2007.
RF&Mod services from CIS-Lunar WG Single access? Multiple access? –To/from several s/c simultaneously from one station? (many to one) This might be useful.
Montreal – Spring 2004 SPACE LINK SERVICES CODING AND SYNCHRONIZATION WORKING GROUP University of Bologna ITALY ESA – European Space Agency ESOC - European.
SLS-RFM WG deadlock over NASA’s position –Rec has a number of critical flaws including a logical dependence upon an SFCG recommendation.
10-Dec-2012-cesg-1 SLS AREA REPORT SLS-OPT: Optical Communications Working Group (1 of 10) StatusComment ProgressGood Progress overall, especially on the.
Nov11-cesg-1 SOIS Area Report Wireless WG Primary Objectives for the fall meeting Establish lessons learned from the Asset Management (AM) Magenta Book.
FSH/security SLS-SLP fall2009 (version 4) Page 1 Security Headers + Homogeneous approach to FSH and Insert Zone in TM/AOS/TC frames: some problems and.
BITTT and CCSDS in China October About BITTT BITTT is the abbreviation for Beijing Institute of Tracking and Telecommunications Technology.
The Software Development Process
1 CCSDS Security Working Group Spring Meeting Colorado Springs Security Architecture January 19 th 2007.
Cesg-1 22 October 2008 Bob Durst (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA.
2009 Spring CCSDS meeting ( Colorado Springs,USA ) SMWG 1 Validation Test Coordination for the SCCS Service Management (R-3.4) 20. April 2009 JAXA YAGI.
10-Dec-2012-cesg-1 SLS AREA REPORT SLS-OPT: Optical Communications Working Group (1 of 6) StatusComment ProgressGood Progress overall, especially on the.
1 Cross Support Architecture (CSAWG) Overview, Status, Goals Takahiro Yamada JAXA.
Status of SSI Architecture Green Book Scott Burleigh, JPL Lena Braatz, Booz Allen Hamilton 2 November 2011.
The CCSDS Cislunar Communications Architecture Keith Scott The MITRE Corporation CCSDS Meeting January 2007.
Apr SLS-SLP WG Goal: Progress TM, AOS Space Data Link Protocol Pink Sheets to Blue (OID frame)* Hold due to FSH/Insert Zone/Security discussion.
NSMA 2006 Meeting May SUIRG is dedicated to identifying and mitigating the growing problem of satellite interference and the economic harm it inflicts.
Cesg-1 28 April October 2008 Bob Durst (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA.
Committee on Earth Observation Satellites CEO Team 29 th CEOS Plenary Kyoto International Conference Center Kyoto, Japan 5 – 6 November 2015 CEOS and GEO.
March 2004 At A Glance Advanced Mission Design (AMD) researches and develops innovative trajectories and the mathematical methods used for optimal designs.
Figure 3. Overview of system architecture for RCMES. A Regional Climate Model Evaluation System based on Satellite and other Observations Peter Lean 1.
Collaborating With Your Health Plan 03/07/05 To paraphrase A. Einstein: We cannot solve today’s problems with the same level of thinking that created them.
May 2011doc.: IEEE 15-XX-XXXX-XX-Xpsc SubmissionSamsung Electronics, ETRI Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs)
PROPRIETARY —Do not distribute Presented to: Date: OPTIMIZING DATA LINK PERFORMANCE FOR UNMANNED SYSTEM PAYLOADS C4 Robot Platforms & Sensors Exposition.
13-17 October 2008 Berlin, Germany ty - 1 Cross Support Architecture WG Closing Plenary Report Fall 2008 Meeting Takahiro Yamada (JAXA/ISAS) 17 October.
10-Dec-2012-cesg-1 Presentation to ESTEC Nordwijk, Netherlands 8 April 2014 CCSDS Space Link Services (SLS) Area Area Director: Gian Paolo Calzolari (ESA/ESOC)
Use of Spectrum Bands Above 24 GHz For Mobile Radio Services ‘5G’…
Adam Schlesinger NASA – JSC November 3, 2011
Joint Meeting of the CCSDS and the OMG-SDTF
SADC WRC-15 Preparatory Meeting
BITTT and CCSDS in China
SLS AREA REPORT Goal: Next Generation Uplink WG
Adam Schlesinger NASA – JSC November 3, 2011
Presentation transcript:

National Aeronautics & Space Administration European Space Agency & 1 Modulation and Coding: Draft IOAG Resolutions to CCSDS September 9, 2008 Les Deutsch Jet Propulsion Laboratory, California Institute of Technology Wolfgang Hell European Space Operations Center, European Space Agency Extracted by A. Hooke, 24 Sep 2008

National Aeronautics & Space Administration European Space Agency & 2 Resolution 1: CDMA/DSSS Considering that 1.CDMA/DSSS is commonly used by some agencies for low data rates in an Earth-orbiting data relay system; 2.taking note of relay systems being planned by additional operating agencies, beyond the current NASA, ESA and JAXA; 3.taking into account that the IOAG encourages international collaboration and therefore regards access to such technology on a non-discriminatory basis essential to further interoperability and cross support; the IOAG, resolves that based on the “near-Earth scenario” (missions below GEO orbit) developed by the SISG for the IOAG, urges CCSDS to investigate technical solutions in response to these scenarios and in particular 1.investigate the relevance of the PN spreading and tracking formats in the SNIP agreement material to this purpose; 2.investigate the possibility of development of new DSSS code families; 3.investigate possible procedures for the administration of these new code families.

National Aeronautics & Space Administration European Space Agency & 3 Resolution 2: Bandwidth Efficient Modulation for High Rate Telemetry in Deep Space Applications Considering that to date the only bandwidth efficient modulation scheme endorsed by CCSDS for deep space missions is GMSK; Taking account of envisaged application and mission profiles that suggest that modulation schemes offering hundreds of Mbps may be required in the next decade; the IOAG resolves 1.that IOAG encourages CCSDS to request the Space Link Services area to advance the development of the ‘Mission and Communication Profiles’ report such that pertinent deep space mission needs are identified and quantified; 2.that IOAG suggests that CCSDS puts in place the necessary resources to standardize relevant techniques in response to the projected requirements.

National Aeronautics & Space Administration European Space Agency & 4 Resolution 3: Concurrent High-Rate Telemetry and Ranging Modulation Considering that: 1.IOAG has identified the need for concurrent high rate telemetry and ranging modulation; 2.with the modulation schemes presently recommended for links excluding Earth-orbiting data relay satellites, telemetry with symbol rates above approximately 500 Ksps and ranging are mutually exclusive; 3.solutions currently being studied by two IOAG Member Agencies demonstrate the feasibility of such capability; 4.in the interest of interoperability and cross support a standardized approach is highly desirable; the IOAG resolves that IOAG urges CCSDS to proceed with 1.identifying candidate solutions responding to this operational need for links excluding Earth-orbiting data relay satellites; 2.defining suitable metrics that allow to determine the relative merit of the candidate solutions; 3.developing a standard for concurrent high rate telemetry and ranging based on the solution with the best metrics; 4.developing solutions that are appropriate for Category A & B missions where a single solution that satisfies both is preferred but not required.

National Aeronautics & Space Administration European Space Agency & 5 Resolution 4: New Synchronization and Channel Coding Sublayer Standard Considering that 1.IOAG member agencies have planned multiple near-Earth, Lunar, and deep space missions requiring emergency, proximity, and high-rate telemetry communications links; 2.These links have varied requirements for data rate, latency, bandwidth efficiency, power efficiency, range, codec complexity, and dynamic adaptability; 3.The existing CCSDS recommendations describing the Synchronization and Channel Coding Sublayer of the Data Link layer are inadequate to satisfy all of these requirements; 4.CCSDS has developed a set of mission profiles describing the requirements of the future space missions; 5.IOAG member agencies desire that a new Synchronization and Channel Coding Sublayer standard be completed quickly, to enable these upcoming missions to incorporate it into their designs and implementations in a timely fashion; 6.CCSDS has developed a set of candidate forward error correction coding solutions in the CCSDS O-1 and CCSDS O-2 Orange Books which suitable for "fast track" promotion to Blue Book status; 7.and, it is of common interest to restrict the number of standards to the minimum necessary to enable cross support while minimizing implementation cost; (Continued …)

National Aeronautics & Space Administration European Space Agency & 6 Resolution 4 continued the IOAG resolves 1. To urge CCSDS to recommend appropriate FEC coding solutions meeting the needs of future missions, putting special attention on one or more of the CCSDS Orange books: a.CCSDS O-2 "Low Density Parity Check Codes for Use in Near-Earth and Deep Space;" b.CCSDS O-1 "Flexible Serially Concatenated Convolutional Turbo Codes with Near- Shannon Bound Performance for Telemetry Applications;" and c.CCSDS O-0 (Draft) "DVB-S2 Coding and Modulation Standard Use for High Data Rate TM Links;" as these can offer fast track access to Blue Book status; and verifying the impact on the adjacent Physical and Data Link layers for a homogenous solution. 2. To urge CCSDS to make this recommendation by IOAG-13.

National Aeronautics & Space Administration European Space Agency & 7 Resolution 5: High rate uplink and codes Considering that 1.IOAG member agencies are planning multiple human and robotic near-Earth, Lunar, and deep space missions that will require high data rate uplinks with sustained data rates of Megabits per second and occasional data rates of tens of Megabits per second; 2.These missions are likely to include multinational participation and, as such, will require interoperability and cross-support of telecommunications services; 3.These links need to be power efficient due to limited EIRP, to be highly reliable, to accommodate a wide range of latencies, and to be implementable with limited on-board complexity; 4.Existing CCSDS recommendations for uplink signalling do not provide an adequate solution for such planned links; the IOAG resolves 1.To urge CCSDS to agree with IOAG on a set of requirements for high rate uplink, including commanding, file uploads, and human support applications; 2.To urge CCSDS to identify candidate technical solutions for uplink signaling in response to this set of requirements; 3.To urge CCSDS to rank these solutions according to appropriate figures of merit and make recommendations for new standards to the IOAG by IOAG-13.