Preparation for silicon sensor arrival sensor delivery schedule aggressive expect 130 L2-L5 sensors each in July and August sensor lot/batch will likely.

Slides:



Advertisements
Similar presentations
Silicon Technical Specifications Review General Properties Geometrical Specifications Technology Specifications –Mask –Test Structures –Mechanical –Electrical.
Advertisements

RBA Securitisation System Technical Delivery Forum
January 22, Run IIB Silicon workshop Purdue University Bortoletto Daniela, Bolla Gino, Canepa Anadi Hamamatsu testing I-V characteristics up to 1000V.
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
Production Monitoring and QC FCal1 Production Advancement Review February 20, Peter Loch University of Arizona Tucson, Arizona FCal1 Production.
First Proton Irradiation of CMS Sensors W. de Boer, A. Dierlamm, A. Furgeri, E. Grigoriev, F. Hartmann, F. Hauler, L. Jungermann, Ch. Piasecki.
Sensors for CDF RunIIb silicon upgrade LayerR min (cm)1 MeV eq-n cm * * * * * *10.
October 7, 2003 US Silicon Tracker group Sergey Korjenevski University of Rochester 1 Quality Assurance Test Stand University of Rochester oQTC at Rochester,
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
Dzero RunIIb Sensor PRR, August 8, Marcel Demarteau Slide 1 DØ Inner Layer Sensor Production Readiness Review August 08, 2003 M. Demarteau, G. Ginther.
Institute of Physics ASCR, Prague Strip Sensors R&D for SCT and ITk Marcela Mikeštíková.
8/22/01Marina Artuso - Pixel Sensor Meeting - Aug Sensor R&D at Syracuse University Marina Artuso Chaouki Boulahouache Brian Gantz Paul Gelling.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
Frank Lehner U Zurich Characterization of inner layer sensors DØ Inner Layer Sensor Production Readiness Review FNAL, 8/8/2003 M. Demarteau, R. Demina,
Frank Lehner U Zurich Proposal to use the Atlas SCT database for Run IIb  Why to switch now? u existing database (db) at UIC incomplete and unlikely to.
CMS Tracker Week, CERN, October Oct 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working.
ALBA Synchrotron – 17 June 2010 Centro Nacional de MicroelectrónicaInstituto de Microelectrónica de Barcelona First Measurements on 3D Strips Detectors.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
STATUS OF THE MEG CRYOSTAT Construction status Schedule ____________________________________________________________ 04/Agust/06 F. Raffaelli, L. Delfrate.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
P. Riedler- GGT Meeting 3/4/20061 Status of Sensor Irradiation and Bump Bonding P. Riedler, G. Stefanini P. Dalpiaz, M. Fiorini, F. Petrucci.
Muon System Safety Issues Burkhard Schmidt.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
SSD Status Report July SSD Status Report accessible from STAR group documents Pictures Updated documentation.
Summary of CMS 3D pixel sensors R&D Enver Alagoz 1 On behalf of CMS 3D collaboration 1 Physics Department, Purdue University, West Lafayette, IN
Production of Forward RPC Gaps CMS Forward RPC EDR (10/10/2002 – 11/10/2002) Seong Jong Hong KODEL, Korea University.
Thomas Jefferson National Accelerator Facility Page 1 SVT – Review January Sensors for the Silicon Vertex Tracker Amrit Yegneswaran.
Tim Bolton, KSU Run 2B L0/L1 PRR Aug 7, Radiation Testing at KSU for the Run 2B Upgrade  L0/L1/L2 sensors from both HPK and ELMA tested with 7-14.
Testing Site Qualification Purpose: –Perform detailed scans of the silicon microstrips to make sure they all work. –Check HPK. Candidates for Certification:
M. Gilchriese - April 2001 Disk Sector Status. M. Gilchriese - April Technical Status Three prototypes to current dimensions(8-sector disks) except.
DOE Rev of Run IIb Sep 24-26, Silicon sensors procurement and quality assurance WBS Regina Demina Kansas State University Frank Lehner University.
Micro and Nano Characterization Facility Girish Kunte July 1 st 2014.
8 July 1999A. Peisert, N. Zamiatin1 Silicon Detectors Status Anna Peisert, Cern Nikolai Zamiatin, JINR Plan Design R&D results Specifications Status of.
Status of Hamamatsu Silicon Sensors K. Hara (Univ of Tsukuba) Delivery leakage current at 150V & 350V number of defect channels wafer thickness & full.
CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, US CMS Tracker Outer Barrel (TOB) Silicon Project Tim Bolton (for Regina Demina)
Silicon Strips for PHENIX SVTX Status and Plans for Silicon Strips in PHENIX SVTX Abhay Deshpande Recent development: Possibility of the second Si Pixel.
1 Silicon Testing at KSU Sergey Korjenevski Kansas State University 06/18/2002 (11 slides total)
Tracker SSD Ladder Preproduction Review Actions and Changes Since Last Week September 16, 2002 Alessandro Brez Robert Johnson.
FVTX Wedge Assembly WBS , , , , , David Winter Columbia University FVTX Wedge Manager.
1 Device Simulations & Hardware Developments for CBM STS Sudeep Chatterji CBM Group GSI Helmholtz Centre for Heavy Ion Research CBM Collaboration Meeting,
Dzero RunIIb Sensor PRR, August 8, Marcel Demarteau Slide 1 DØ Inner Layer Sensor Production Readiness Review August 08, 2003 M. Demarteau for the.
Muon Meeting April 2004JsG Status of Chambers Production at CERN Jean-Sebastien Graulich o Open Questions from the PRR O-ring Aging, Aging tests, Storage.
Run Iib Workshop Dec 12-13, 2002 Silicon sensors procurement and quality assurance WBS Regina Demina Kansas State University.
DSSD update. 2Manfred Valentan, 3 rd Open Meeting of Belle27-9 July 2009 Outline DSSD design in Vienna: How it is done First test batch of SVD DSSDs Status.
Production Readiness Review of L0/L1 sensors for DØ Run IIb R. Demina, August, 2003 Irradiation studies of L1 sensors for DØ 2b Regina Demina University.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
T. Lari – INFN Milan Status of ATLAS Pixel Test beam simulation Status of the validation studies with test-beam data of the Geant4 simulation and Pixel.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Silicon Strip Detector.
Lehman Review April 2000 D. Bortoletto 1 Forward Pixel Sensors Daniela Bortoletto Purdue University US CMS DOE/NSF Review April 12,2000 Progress.
Silicon Mtg July 24th, Eckhard von Toerne, KSU RunIIb Silicon Database Eckhard von Toerne Kansas State U. July 24 th, 2003.
Production Database Apollo Go, NCU Taiwan Preshower Silicon PRR July 5, 2001.
Sensor Testing Phil Turner. LHCb PRR - P. Turner Contents Reception Inspection Metrology Mounting Electrical tests Storage Changes since EDR Results Throughput.
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
12/2/04Module 2C1 The NCSX Engineering Web – An Overview Part III Design Data, Fabrication, Assembly, and Installation Plans.
September 7, 2004Si VTX Strip Overview1 Overview of VTX Strip Group Activities Abhay Deshpande SUNY-SB For Si Strip Group.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
Status of the Planar Edgeless Silicon Detectors Gennaro Ruggiero TOTEM Collaboration Meeting 09/11/2005.
June , RD50 Workshop1 Jan B o hm, Jan Brož, Zdeněk Doležal, Peter Kodyš, Petr Kubík, Marcela Mikeštíková Neutron irradiation program in Prague Charles.
1 HBD: Responsibilities, Cost and Schedule Itzhak Tserruya EC/DC Meeting, BNL, March 9, 2005.
Procurement Readiness Review : Detector Fabrication, Qualification & Assembly at India M D Ghodgaonkar Electronics Division, BARC, India.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
G. Ruggiero / TOTEM 1 Si Edgeless Detectors in the RPs Edgeless detector (on the old “AP25 module”) active edges (“planar/3D”) planar tech. with CTS (Current.
HGC Cassettes Jim Freeman September 17, Director's Review -- Calorimetry – HGC Cassettes Jim Freeman, 2015 Sept 17.
QA Tests Tests for each sensor Tests for each strip Tests for structures Process stability tests Irradiation tests Bonding & Module assembly Si detectors1272.
Irradiation and annealing study of 3D p-type strip detectors
SuperB SVT Silicon Sensor Requirements
GLAST Large Area Telescope:
GRP Progress & Plans The GRP project was established to deliver an updated design utilising fully supported hardware and software for Gemini. GRP is replacing.
Presentation transcript:

Preparation for silicon sensor arrival sensor delivery schedule aggressive expect 130 L2-L5 sensors each in July and August sensor lot/batch will likely be in the order of from 9/2003 until 4/ L2-L5 sensors each month first L0/L1 (110 pcs) sensors in October 2003 (but effectively later) Frank Lehner U Zurich

Silicon sensor arrival - preparation We have a detailed QA plan with established procedures  All people involved in that business should check on  QA document v4.0 definition of tests general procedures for testing  Sensor QA part flow v2.0 detailed part flow for testing timing estimates  Procedures for visual inspection v1.0  Guidelines for clean room and sensor S&H v2.0

Sensor arrival - preparation Key tests:  initial registration into DB checking paperwork from vendor inserting vendor info into “vendor information spreadsheet” -> perl script -> database  visual inspection follow visual inspection guidelines use traveler form during inspection (form attached to visual inspection guide line) insert visual inspection comments into “key test spreadsheet”  I-V and C-V data go into “key test spreadsheet” all L2-L5 sensor key tests at FNAL  Technician for DB and visuals: Nina Ronzhina  Physicists for IV & CV: Md Mao/R.Lipton

Sensor arrival – preparation 10% L2-L5 full strip test (FST) at KSU (35%) & SB (65%)  sensors selected for FST by RD and FL  FST information goes into “full strip test spreadsheet” -> perl -> database 5% sensors are subject to long term bias test at FNAL (Md. Mao/R. Lipton)  selection based on visual inspection and I-V results from key tests initially 10% sensors per batch will be mechanically measured on OGP at FNAL  agreement what to measure: thickness, flatness, cut tolerances 2x (sides and ends)  sensors which show chips/cracks at edges have to be measured  not yet an agreement on data format

Sensor arrival – preparation irradiation test at KSU  1.5% of the sensors (irradiation on baby detector)  two irradiation steps up to 2.5·E13 10 MeV p/cm 2  irradiate roughly half of the baby detectors which are at KSU anyway for FST tests  L0 & L1 baby detectors have to be shipped from UR to KSU for irradiation (do we need a higher dose for them?)

Sensor QA plan

Sensor arrival – preparation questions Questions:  Is Nina trained for visual inspection?  Is the visual inspection station in Lab A ready?  When do we have the vendor information and key test spreadsheet ready?  Do we have dry boxes for sensor storage at FNAL?  Are the programs for the mechanical measurements on the OGP written?  Is the output format defined?

L0/L1 PRR preparation L0/L1 PRR will be on August 8 th, 9 a.m. CT documents & infos posted on following documents are prepared or have to be prepared/finalized  Note on electrical characterization of L1 sensors editor: Marcel status: 1 st version exists plots and results are there, need only additional layout work I will finalize it  Note on irradiation of L1 sensors editor: Frank status: 2 nd version plots and results are there however results on strip capacitance are a very weak point, went up from 1.1 pF/cm to 1.5 pF/cm no reults on coupling capacitor value after irradiation no results on strip capacitance versus HV after irradiation

L0/L1 PRR preparation Note on comparison of strip measurements between SB and KSU  editor: Bob  status: 2 nd version exists (from July)  gives a very nice overview, shows the overall good agreement between KSU and SB on many measurements with some exceptions though  to be included in electrical sensor characterization note or separate note ?? Note on fluence determination and dosimetry checks at KSU irradiation facility  editor: Tim  status: 2 nd version exists (from July)  contains leakage current vs. fluence plots which are also in the other note  foil activation double check between FNAL & KSU within ~20%

L0/L1 PRR preparation older note on L2 irradiation document for L2- L5 PRR from March 6, 2003  editor: Regina & Tim  status: unchanged  do we need an update of this at all? other existing notes:  quality assurance document v4.0  visual inspection guidelines v1.0  sensor S&H document v2.0  generally in good shape …

L0/L1 PRR preparation all documents released to PRR by July 25 (i.e. two weeks in advance) everybody, please read and send comments in to all notes by latest July 20 again, the notes are posted on: rr/prr_l1.html rr/prr_l1.html