INDIRA GANDHI SUPER THERMAL POWER PROJECT 3X500 MW Design, Engineering, Supply, Erection, Testing and Commissioning of Coal Handling System.

Slides:



Advertisements
Similar presentations
PROJECT MANAGEMENT PROJECT MANAGER ENGINEERING MANAGER PROCUREMENT MANAGER CONSTRUCTION MANAGER.
Advertisements

NSS Program - Navien Service Specialist
POWERLINKS TRANSMISSION LIMITED a joint venture of TATA POWER &POWERGRID.
1 TRF Limited TRF is capable of offering complete design, engineering, manufacturing, erection and commissioning solutions for material handling.
1 ELECTRICAL EQUIPMENT AND SYSTEMS – OFFSHORE AND ONSHORE FACILITIES MAIN ELECTRICAL EQUIPMENTS AND SYSTEMS INSTALLED  GENERATORS: MAIN GENERATORS – 12.
SERVICE TAX 1. As per Explanation to Section 65 (105) (zzzza) of the Finance Act, 1994, the term works contract” means a contract wherein,— (i) transfer.
1 TRF Limited Products. 2 TRF Limited Grab Duty Level Luffing Cranes are in operation at Mumbai ports. The largest Grab Level Luffing Crane is designed.
Hyde Park Overview A well-designed township comes with the best of design, aesthetics and urban planning confirming fully amenable with all the quality.
European Found Accounting Women in the main deck.
DPW General Conditions Articles 32 through 37. Articles Covered Today  32 Owner’s Right to Withhold Payment  33 Owner’s Right to Stop Work and Terminate.
WELCOME.
TRF LIMITED (A TATA ENTERPRISE) COAL HANDLING PLANT PACKAGE JHARLI.
Reduction of manufacturing time of wagon-tippler
IRREGULARITIES IN CUSTOM DUTY PAYMENT. 1. What is Custom Duty? Customs duty is levied on goods imported in India. It is levied on Ports. If goods are.
Bob Law FAC Oct 24, Sector 20 Project Overview Sector 20 Site Plan Description Organizational Chart Schedule Cost.
ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT Defects Liability [Construction Contract Administration] Chapter 11.
CENTRAL EXCISE, CUSTOMS, & SERVICE TAX PROPOSALS.
LOGO October The Employer FIDIC 1999 dasdas Supervisor: Dr.Kamalain shaath Done by: Mahmoud Abu Kmail Construction Contract Administration ENGC.
Steam Power Station Presented By Ashvin G. Patel Asst. Prof. (E.E.)
Contract price & payment
SAYCO, the most successful and fastest-growing illuminated sign manufacturing company in Mexico We focus on providing distinctive solutions of only the.
REPLACEMENT AND MAINTENANCE OF LIFTS GIVING ACCESS TO LHC UNDERGROUND AREAS TENDERING PROCEDURE IT-4056/EN 105 December 2014 Floris Bonthond.
SOCRATES PROGRAMME ADMINISTRATIVE AND FINANCIAL HANDBOOK FOR BENEFICIARIES Selection 2005.
LEVY AND COMPUTATION OF TAX (SEC. 9) 1. LEVIED BY CENTRAL GOVERNMENT AND COLLECTED BY STATE GOVERNMENT: The tax payable by any dealer on sales effected.
Bangladesh-India Friendship Power Company (Pvt.) Limited (A Joint Venture of NTPC Ltd and BPDB) Registered Office : Bidyut Bhaban (14th Floor), 1 Abdul.
1 Training on Procurement Procedure 23 rd Review Meeting of State FCs- Bhopal ( ) Annexure ‘W’
SRIPADASAGAR PROJECT (YELLAMPALLY PROJECT)
Pradeep. K Mittal Member Central Council of The Institute of Company Secretaries of India, New Delhi Advocate Delhi High Court, Delhi RENTING OF IMMOVABLE.
Chapter 2 Documents of Import & Export
Port Equipment Products Grab duty Level Luffing Kangaroo Crane
Modernisation of signalling system (2001/LV/16/P/PT/006) Stage 1 Intermediate Body: Ministry of Transport Employer: Latvian Railway - LDZ Contractor: Consortium.
Copyright © Taxindiaonline.com Pvt. Ltd. All rights reserved.
TADIPUDI LIFT IRRIGATION SCHEME
By Sunil Singh M. V. Damania and Co. Chartered Accountants 01 st February,2013.
TENDERING PROCEDURE IT- 3927/EN
1 Analyisis application Incoterms EXW – Ex Works General notes  The seller delivers the goods at the moment that he places the goods at the disposal.
By s.jaikumar advocate SERVICE TAX. Basic Features  Statutory provisions.  Levy on service provider - Exceptions.  Levy on realisation.
General Condition THE EMPLOYER Construction Law Supervised By : Dr. Kamalain Shaath Prepared By : Eng. Fawzy El.farra.
Notification no. 30/2012-ST dated 20 th June 2012 as amended by notification no. 45/2012-ST dated 7 th August 2012.
PHASE – I & PHASE - II.
1 Instructions to bidders  Eligibility  Procedure for clarifications  Bid preparation - form  Number of copies, addressee  Language  Pricing and.
By swamy associates chennai. coimbatore. bengaluru. hyderabad. ahmedabad BUDGET SAFARI.
A Seminar On Suratgarh Super Thermal Power Station (Raj.)
A Presentation On Summer Training At SURATGARH SUPER THERMAL POWER STATION (6×250MW)
Solar PV Tender Overview Ministry of Livestock, Fisheries and Rural Development Department of Rural Development Place - Sule Shangri-La Hotel Date- 4 -
Concrete Weight Coating Plant “Aladja”
MACHINERY AND EQUIPMENT OWNED  HOT MIX PLANT 40/60 TPH ELECTRONICALLY CONTROLLED :12 Nos ELECTRONICALLY CONTROLLED :12 Nos AS PER MOST (III REVISION)
SELF-GENERATION INCENTIVE PROGRAM (SGIP) Website:
BUDGET – SERVICE TAX CHANGES at ICAI, Kollam Branch on 6 th March, 2010 by CA.TONY.M.P. THRISSUR.
LEB Slide Set 3a Letter of Credit Matti Rudanko LEB Slide set 3a 2 Specification of Price “Art 4 Price 4.1 If no price has been agreed, the Seller's.
Furniture Prequalification Scheme SCM0771 Briefing 17 th November 2014.
SCOPE OF THERMAL POWER PLANTS IN INDIA SUBMITTED BY GUIDED BY SURENDRA KUMAR AHIRWAR R.L. SHREE MALI.
Asahi Switchgear Products Ltd. (ASPL) is a joint venture between Hirose Co. Japan and ASABHANU Technical Services Ltd., (ABTS) India. Asahi is located.
COAL HANDLING SYSTEM FFBL POWER COMPANY LTD. Presented by :
Time and Value of Supply
Practicing Cost Accountant
SERVICE TAX by s.jaikumar advocate
Solid Handling Systems Of FFBL Coal Power Plant Project(CPP) Project
Highveld Industrial Park Tippler Information Memorandum Highveld Steel
Content of Tender Dossier - Instructions to Tenderers - Tenders
Costing and Project Evaluation
SERVICE TAX by g. natarajan advocate, swamy associates
Qualification Criteria and Available Tender Capacity
Fabrication, Erection, Operation & Maintenance Under One Roof
BIDDING DOCUMENTS AND MAIN FEATURES
ARCH 435 PROJECT MANAGEMENT
A PEEP INTO SERVICE TAX by g. natarajan, advocate.
Construction Contract Administration
Financial and Administrative presentation on PARTICULATES project
IT-4464/EN Bidders conference
Presentation transcript:

INDIRA GANDHI SUPER THERMAL POWER PROJECT 3X500 MW Design, Engineering, Supply, Erection, Testing and Commissioning of Coal Handling System

Salient Features of CHP Package Contract Value- 306 Crores Date of N.O.A- 29 th January 2008 Completion Schedule- Unit# months (29 th Mar 2010) Unit# months (29 th Jun 2010) Unit# months (29 th Sep 2010) Auxiliaries - 34 months (29 th Nov 2010) CHP Plant Capacity MT per Hour Back

Major Equipments ItemQuantityCapacityDescription Belt Conveyors7.20 KM2400 TPH/ 1200 TPH1200 TPH for 14A/B & 16 A/B Wagon Tippler + Side Arm Charger 4 Sets20 tips/ hourHydraulic Drive & hydraulic clamping Apron Feeder4 sets1200 TPHElectro-Mechanical drive Ring Granulator (TRM-54) 4 Sets1320 TPH Vibrating Grizzly Feeder 4 Sets1320 TPH Stacker-Reclaimer2 Sets2400 / 2400 TPH Mot. Trippers6 Sets2400 TPH

SCOPE OF WORK ItemApprox Qty Technological Structure Work2400 MT Building Structure works4436 MT Civil Works45000 Cu M Electrical WorksLot Back

Status of Site Work Pilling : 108 Piles completed out of 1350 Nos. Completion by Jan’09 Excavation: 1.55 Lac Cum completed out of 2.5 Lac. Wagon tippler excavation compl. by Sept’08 Structural Fabrication: L-2 start date: Sept’08

Status of Piles at Crusher House

Plant Location 1.Nearest Broad Gauge Railway stn. (around 1.5 KM from site ) 2. Nearest Airport Delhi : 80 KM 3. Nearest District / Town Jhajjar : 38 KM Back

Coal Handling Package Total Contract :30538 Lacs 1 st Contract: Rs Lacs. Supply of Coal Handling Plant Package 2 nd Contract:Rs Lacs Inland transportation, Insurance,Installation,testing Commissioning and Guarantee test of Coal Handling Plant

BRIEF SCOPE OF WORK ItemQtyDescription Rack & Pinion type Elevator2 UnitsFor Crusher House & TP-5 Electric Hoist & CP blocksLotFor Different Houses Motorized Flap Gates44 Nos.Different Discharge Location Rack & Pinion Gates (Rotary Actuator Operated) 4 Nos.Crusher House Rod Gate (Manual)4 Nos.Crusher House Dust Suppression, Dust Extraction, Ventilation System, Service Water System, Potable Water System Lot

Major Terminal Points (Exclusions) 1.Civil, Structural and architectural works for Transfer Points TP-6, TP-7, TP-8, TP-9, TP-10 and TP-11 along with conveyor gallery for Conv. 6A/B (Between TP-6 & TP-7), 7A/B, 8A/B, 9A/B, 10A/B and 11A/B 2.Civil, Structural and architectural works for bunker buildings including bunkers & tripper floors. 3.Site leveling is excluded, however site clearance (i.e. removal of vegetation shall be responsibility of Contractor). 4.Supply, Laying and Termination of following cables: 1.11 KV and 3.3 KV Cables (except trailing cables) 2.Control cable between employer’s 11 KV switchgear and Contractor’s LT switchgears. 3.Illumination for travelling tripper floor. 4.DDCMIS based control system including its power supply system for main CHP control. 5.Close circuit TV system. 6.Data bus cable between employer’s R I/Os & DDCMIS. 7.Telephone and PA system. 8.Grounding mat and lightning protection in bunker area. 9.Road lighting in CHP area, for the roads, which are not in the scope of contractor.

Important Commercial Issues Payment Terms: For Local transportation (Rs Lakh) All plant and equipment excluding mandatory spares 100 % of Local transportation (including Port clearance and Port charges and Inland insurance charges) for equipment covered under the ex-works price component shall be paid pro-rata to the value of equipment received at site and on production of Invoices. For Mandatory Spares 100 % of Local transportation (including Port clearance and Port charges and Inland insurance charges) for spares shall be paid pro-rata to the value of spares received at site and on production of Invoices. Installation services excluding Civil works and Structural works. (Rs Lakh) 10 % of the total installation services component of the contract price will be paid as interest bearing Advance. 75 % of the total installation services component of equipment price shall be paid against progressive erection of the equipments on certification by the Project manager for the quantum of work completed and upon successful completion of quality check points involved in the quantum of erection work billed. 5 % of total value will be paid on successful completion of the facilities of entire CHP and its certification by the Project Manager. 10 % of the total value will be paid on successful completion of guarantee tests of entire CHP and Issuance of OAC by Project Manager.

Important Commercial Issues Payment Terms: For Civil Works (Rs Lakh) 10 % of Total value as interest bearing advance. 80 % of total value will be paid progressively on certification by Project Manager on quantum of work completed and on completion of quality check points involved in the quantum of work billed. 10 % of total value on successful completion of Guarantee Test of the entire Coal Handling Plant package and Upon Issuance of OAC by the Project Manager. For Structural Works (Rs Lakh) 10 % of Total value as interest bearing advance. 40 % of total value will be paid pro-rata basis on receipt of material at site and physical verification and certification by the Project Manager. 18 % of total value will be paid on pro-rata basis on fabrication of Structural Steel and certification by the Project manager on the quantum of work performed and on completion of quality check points involved in the quantum of work. 12 % of the total value will be paid on Pro-rata basis on erection of the structural steel and certification by the project manager on quantum of work performed and on completion of quality check points involved in the quantum of work. 10 % of the total Structural works price component shall be paid on pro-rata basis on final alignment, bolting or welding etc including primer coats of painting on certification by the Project Manager on quantum of work performed and on successful completion of quality checkpoints involved in the quantum of work. 10 % of the total value of contract price shall be paid on successful completion of guarantee tests of entire CHP package and issuance of OAC by the Project Manager. Back

Important Commercial Issues Payment Terms: For Ex-Works Price component of Plant & Equipment (Rs Lakh) 15 % Advance of the total ex-works Price 60 % on despatch of each identified equipment from manufacturer’s works on pro-rata basis on production of Invoices and satisfactory evidence of shipment which shall be Original good receipt/ Rail receipt including MDCC issued by Employer. 15 % on receipt of each identified equipment at site on pro-rata basis and physical verification and certification of Project Manager. 10 % on successful completion of guarantee test of entire coal handling plant package and issuance of OAC by the project manager. For Mandatory Spares (Rs Lakh) 75 % of Ex-works price component of spares upon despatch to site against invoices and shipping documents along with MDCC from client. 25 % of Ex- works price component of spares on receipt and storage at site and on physical verification by the Project Manager.

Benefits/ Exemptions to supplies for Mega Power Projects Ministry of Power (Govt. of India) has certified that Indira Gandhi STPP, Jhajjar (3X500 MW) fulfills the laid down criteria for Mega Power Project. Accordingly, supplies of goods for this package shall be eligible for benefits / exemptions as per provisions of relevant notifications of the Govt. of India. Back

Liquidated Damages For Unit # 1 (26 Months): US$ 33,357/- per day or equivalent amount in contract currencies. The maximum amount shall be 3.5% of contract price excluding spares. For Unit#2 (29 Months): US$ 7,148/- per day or equivalent amount in contract currencies. The maximum amount shall be 4.25% (including for Unit#1) of contract price excluding cost of spares. For Unit#3 (32 Months): US$ 4,765/- per day or equivalent amount in contract currencies. The maximum amount shall be 4.75% (including for Unit#1& Unit#2) of contract price excluding cost of spares. Completion of all facilities (34 Months): US$ 2,383/- per day or equivalent amount in contract currencies. The maximum amount shall be 5 % (including for Unit#1, Unit #2 and Unit#3) of contract price excluding cost of spares. * The rate of conversion shall be of date of NOA ( ) Back